The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
From theory to practice: toward a typology of project-management styles
Abstract
Research literature on the management of projects has been quite slow in its conceptual development and still suffers from a scanty theoretical basis. One of the main impediments in the study of projects has been the absence of constructs and the little distinction that has been made between the project type and its managerial and organizational style. Based on the findings in a field study of 26 case projects, this research shows that there is a need to adopt a more project-specific contingency approach to project management in organizations. This study explores a two-dimensional theoretical model for the classification of technical (or engineering) projects. Projects are classified according to four levels of technological uncertainty at the time of project initiation and three levels of system scope, which is their location on a hierarchical ladder of systems and subsystems. Considerable differences were found in management style, project organization and operational practice when moving along each of the model's two axes. Differences also were observed in simultaneous change in both dimensions. The findings suggest a handful of practical and managerial implications. They are based on the premise that a proper project classification prior to project initiation and a carefully selected management style may lead to better implementation and to an increased chance of project success.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Building Theories from Case Study Research
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.2307/258557 · Cited by 17,455
A Framework for the Comparative Analysis of Organizations
Perrow, C. (1967) · American Sociological Review · doi:10.2307/2091811 · Cited by 2,509
Typologies as a Unique Form of Theory Building: Toward Improved Understanding and Modeling
Doty, D. H., & Glick, W. H. (1994) · The Academy of Management Review · doi:10.5465/amr.1994.9410210748 · Cited by 1,716
Reliability and Validity in Qualitative Research
Kirk, J., & Miller, M. (1986) · doi:10.4135/9781412985659 · Cited by 1,462
Burkhardt, M. E., & Brass, D. J. (1990) · Administrative Science Quarterly · doi:10.2307/2393552 · Cited by 947
Cited by
Tatikonda, M. V., & Rosenthal, S. R. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.820727 · Cited by 634
Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.07.008 · Cited by 471
Müller, R., & Jugdev, K. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211269040 · Cited by 390
Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation
Söderlund, J. (2011) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2010.00290.x · Cited by 352
Sauser, B. J., Reilly, R. R., & Shenhar, A. J. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.01.004 · Cited by 285
Self-citation
Metadata
- Authors
- Shenhar, A. J.
- Venue
- IEEE Transactions on Engineering Management
- Published
- 1998
- Volume
- 45
- Issue
- 1
- Pages
- 33-48
- ISSN
- 0018-9391 (ISSN-L)
- OpenAlex
- W2105548183
- Cited by
- 188
- References
- 5
- FWCI
- 4.78
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: From theory to practice: toward a typology of project-management styles. https://app.cochat.ai/papers/10.1109/17.658659
- The paper
- Shenhar, A. J. (1998). From theory to practice: toward a typology of project-management styles. IEEE Transactions on Engineering Management. https://doi.org/10.1109/17.658659
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.