Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches
The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
The industrial sector is one of the largest energy consumers in the world. To alleviate the grid's burden during peak hours, time-of-use (TOU) electricity pricing has been implemented in many countries around the globe to encourage manufacturers to shift their electricity usage from peak periods to off-peak periods. In this paper, we study the unrelated parallel machine scheduling problem under a TOU pricing scheme. The objective is to minimize the total electricity cost by appropriately scheduling the jobs such that the overall completion time does not exceed a predetermined production deadline. To solve this problem, two solution approaches are presented. The first approach models the problem with a new time-interval-based mixed integer linear programming formulation. In the second approach, we reformulate the problem using Dantzig-Wolfe decomposition and propose a column generation heuristic to solve it. Computational experiments are conducted under different TOU settings and the results confirm the effectiveness of the proposed methods. Based on the numerical results, we provide some practical suggestions for decision makers to help them in achieving a good balance between the productivity objective and the energy cost objective.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1979) · Cited by 43,841
Scheduling: Theory, Algorithms, and Systems
(1996) · IIE Transactions · doi:10.1080/15458830.1996.11770714 · Cited by 6,210
Decomposition Principle for Linear Programs
Dantzig, G. B., & Wolfe, P. (1960) · Operations Research · doi:10.1287/opre.8.1.101 · Cited by 2,315 · cited 1×
“After that, the proposed heuristic is further extended for solving a multi-objective problem that aims to simultaneously minimize the makespan and TEC.”
MethodBranch-and-price: column generation for solving huge integer programs
Barnhart, C., Johnson, E. L., Nemhauser, G. L., Savelsbergh, M. W. P., & Vance, P. H. (1998) · Operations Research · doi:10.1287/opre.46.3.316 · Cited by 2,219 · cited 1×
“One option to deal with this issue is to embed the CG method into the branch and bound strategy, which is commonly known as the branch and price (B&P) method [44], [45].”
MethodA summary of demand response in electricity markets
Albadi, M. H., & El-Saadany, E. F. (2008) · Electric Power Systems Research · doi:10.1016/j.epsr.2008.04.002 · Cited by 1,884 · cited 2×
“reduce investment for backup infrastructures and avoid utilization of less efficient generators, growing public attention has been attracted to demand response (DR) technology [7].”
BackgroundOptimal Residential Load Control With Price Prediction in Real-Time Electricity Pricing Environments
Mohsenian-Rad, A.-H., & Leon-Garcia, A. (2010) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2010.2055903 · Cited by 1,838
Selected Topics in Column Generation
Lübbecke, M. E., & Desrosiers, J. (2005) · Operations Research · doi:10.1287/opre.1050.0234 · Cited by 1,102 · cited 1×
“For more details about the CG method, we refer interested readers to the survey paper of Lübbecke and Desrosiers [41].”
MethodProduction Planning by Mixed Integer Programming
(2006) · Springer Series in Operations Research and Financial Engineering · doi:10.1007/0-387-33477-7 · Cited by 959 · cited 1×
“Then, the outer loop guides the search procedure towards integer solutions by fixing the job assignment pattern on some machines, one in an iteration, which is referred to as the diving heuristic [49].”
MethodDemand response modeling considering interruptible/curtailable loads and capacity market programs
Aalami, H. A., Moghaddam, M. P., & Yousefi, G. R. (2010) · Applied Energy · doi:10.1016/j.apenergy.2009.05.041 · Cited by 755 · cited 1×
“Empirical results showed that lower energy costs can be achieved by avoiding processing during periods of high energy prices.”
BackgroundOperational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
Cited by
Li, J.-Q., Sang, H.-Y., Han, Y.-Y., Wang, C.-G., & Gao, K.-Z. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.004 · Cited by 295
Lu, C., Gao, L., Li, X., Pan, Q., & Wang, Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.01.011 · Cited by 292
Metadata
- Authors
- Ding, J.-Y., Song, S., Zhang, R., Chiong, R., & Wu, C.
- Venue
- IEEE Transactions on Automation Science and Engineering
- Published
- 2016-04
- Volume
- 13
- Issue
- 2
- Pages
- 1138-1154
- ISSN
- 1545-5955 (ISSN-L)
- 1558-3783
- OpenAlex
- W2329354063
- Cited by
- 195
- References
- 37
- FWCI
- 25.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.