A Learning-Based Memetic Algorithm for Energy-Efficient Flexible Job-Shop Scheduling With Type-2 Fuzzy Processing Time
The DOI matches its Crossref record; 31 of the 31 references it cites were found in a registry or an index.
Abstract
Green flexible job-shop scheduling problem (FJSP) aims to improve profit and reduce energy consumption for modern manufacturing. Meanwhile, FJSP with type-2 fuzzy processing time is proposed to predict the uncertainty in timing constraint for better simulating the practical production. This study addresses the multiobjective energy-efficient FJSP with type-2 processing time (ET2FJSP), where the minimization of makespan and total energy consumption are considered simultaneously. The previous studies do not propose the model verification and energy-saving strategy. Moreover, the best parameters required by an algorithm in different stage are different. Therefore, we propose a mixed-integer linear programming model and design a learning-based reference vector memetic algorithm (LRVMA). Its main features are: 1) four problem-specific initial rules that are presented for initialization to generate diverse solutions; 2) four problem-specific local search methods that are incorporated to enhance the exploitation; 3) an effective solution selection method depending on the Tchebycheff decomposition strategy that is utilized to balance the convergence and diversity; 4) a reinforcement learning-based parameter selection strategy that is proposed to improve the diversity of nondominated solutions; and 5) an energy-saving strategy that is designed to reduce energy consumption. To verify the effectiveness of LRVMA, it is compared against other related algorithms. The results demonstrate that LRVMA outperforms the compared algorithms for solving ET2FJSP.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053 · cited 3×
“Those two metrics are referring to [49], where P is PF t calculated by the algorithm in each generation and P ∗ is the predefined reference point.”
BackgroundMethodMOEA/D: A Multiobjective Evolutionary Algorithm Based on Decomposition
Zhang, Q., & Li, H. (2007) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2007.892759 · Cited by 10,069 · cited 3×
“The proposed LRVMA relies on the reference vector, and the diversity of Pareto solutions depends on the parameter (i.e., the size of neighborhood [48]).”
BackgroundMethodMendel, J. M., & John, R. I. B. (2002) · IEEE Transactions on Fuzzy Systems · doi:10.1109/91.995115 · Cited by 2,616 · cited 1×
“To achieve automation and accuracy, a type-2 fuzzy processing time (T2FPT) is proposed for better predicting the uncertainty in timing constrain approximately [17].”
MethodA faster algorithm for calculating hypervolume
While, L., Hingston, P., Barone, L., & Huband, S. (2006) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2005.851275 · Cited by 1,100 · cited 1×
“Three metrics are used to measure the performance of the different algorithms: hypervolume (HV) [50], generation distance (GD), and Spread [49].”
MethodDesign of Experiments Using the Taguchi Approach: 16 Steps to Product and Process Improvement
Van Nostrand, R. C. (2002) · Technometrics · doi:10.1198/004017002320256440 · Cited by 827 · cited 1×
“A Taguchi approach of design of experiment (DOE) [51] is adopted for testing the best parameter.”
MethodTian, Y., Cheng, R., Zhang, X., Cheng, F., & Jin, Y. (2018) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2017.2749619 · Cited by 699 · cited 1×
“To further evaluate the effectiveness of the proposed LRVMA, it was compared to the current mainstream MOEAs MOEA/D [48] and NSGA-II [49], the recently proposed MOEAs AR-MOEA [52] and C-TSEA [53], and two new algorithms for ET2FJSP named IAIS [18] and FBEA [6].”
MethodA Multi-Facet Survey on Memetic Computation
Chen, X., Ong, Y.-S., Lim, M.-H., & Tan, K. C. (2011) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2011.2132725 · Cited by 512 · cited 1×
“Memetic algorithms (MAs), which refer to the evolutionary search framework incorporating local refinements [34], [35], have been successfully applied to a variety of scheduling problems [36], [37].”
BackgroundAn Effective PSO-Based Memetic Algorithm for Flow Shop Scheduling
Liu, B., Wang, L., & Jin, Y.-H. (2007) · IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics) · doi:10.1109/tsmcb.2006.883272 · Cited by 480 · cited 1×
“Memetic algorithms (MAs), which refer to the evolutionary search framework incorporating local refinements [34], [35], have been successfully applied to a variety of scheduling problems [36], [37].”
BackgroundSelf-citationMemetic Computation—Past, Present & Future [Research Frontier
Ong, Y.-S., Lim, M., & Chen, X. (2010) · IEEE Computational Intelligence Magazine · doi:10.1109/mci.2010.936309 · Cited by 419 · cited 1×
“Memetic algorithms (MAs), which refer to the evolutionary search framework incorporating local refinements [34], [35], have been successfully applied to a variety of scheduling problems [36], [37].”
BackgroundFlexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
Gao, K., Yang, F., Zhou, M., Pan, Q., & Suganthan, P. N. (2019) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2018.2817240 · Cited by 302 · cited 1×
“However, the existing FJSP [1]–[4] cannot satisfy the more personalized market requirement.”
BackgroundZhang, F., Mei, Y., Nguyen, S., & Zhang, M. (2021) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2020.3024849 · Cited by 264 · cited 1×
“However, the existing FJSP [1]–[4] cannot satisfy the more personalized market requirement.”
BackgroundGao, K., Suganthan, P. N., Chua, T. J., Chong, C. S., Cai, T. X., & Pan, Q.-K. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.06.004 · Cited by 242
Real-time scheduling for a smart factory using a reinforcement learning approach
Shiue, Y.-R., Lee, K.-C., & Su, C.-T. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.03.039 · Cited by 225 · cited 1×
“The cooperation between RL and evolutionary algorithms is a promising direction to solve complex scheduling problems [38]–[42].”
BackgroundWang, J.-J., & Wang, L. (2022) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2021.3106168 · Cited by 225 · cited 2×
“These green scheduling models have become more important [21]–[24], for example, the energy-aware distributed hybrid flow shop [25], [26], energy-efficient distributed permutation flow shop [27], [28], energy-efficient distributed flow shop with heterogeneous factory [29], energy-efficient distributed…”
BackgroundSelf-citationPan, Q.-K., Gao, L., & Wang, L. (2022) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2020.3041494 · Cited by 219 · cited 1×
“There is a large potential space for energy saving, such as turning the machines off during idling [32], employing a speed scaling strategy [33], selecting machines with low-power consumption [19], and reducing idle time to lower energy consumption.”
BackgroundSelf-citationSimplified Interval Type-2 Fuzzy Logic Systems
Mendel, J. M., & Liu, X. (2013) · IEEE Transactions on Fuzzy Systems · doi:10.1109/tfuzz.2013.2241771 · Cited by 205
Du, Y., Li, J.-Q., Chen, X.-L., Duan, P.-Y., & Pan, Q.-K. (2023) · IEEE Transactions on Emerging Topics in Computational Intelligence · doi:10.1109/tetci.2022.3145706 · Cited by 202 · cited 1×
“Li et al. applied RL to adjust the reference point dynamically [43] and Du et al. utilized a deep Q -network with 34 states and nine actions to efficiently describe FJSP [44].”
BackgroundLu, C., Gao, L., Yi, J., & Li, X. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2020.3043734 · Cited by 188 · cited 2×
“Local search is an effective heuristic to improve the quality of solutions in the field of scheduling [29].”
BackgroundSelf-citationZhang, B., Pan, Q.-K., Gao, L., Meng, L.-L., Li, X.-Y., & Peng, K.-K. (2020) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2019.2916088 · Cited by 176 · cited 1×
“These green scheduling models have become more important [21]–[24], for example, the energy-aware distributed hybrid flow shop [25], [26], energy-efficient distributed permutation flow shop [27], [28], energy-efficient distributed flow shop with heterogeneous factory [29], energy-efficient distributed…”
BackgroundHe, X., Pan, Q.-K., Gao, L., Wang, L., & Suganthan, P. N. (2021) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2021.3115795 · Cited by 166 · cited 1×
“There is a large potential space for energy saving, such as turning the machines off during idling [32], employing a speed scaling strategy [33], selecting machines with low-power consumption [19], and reducing idle time to lower energy consumption.”
BackgroundSelf-citationWang, G., Li, X., Gao, L., & Li, P. (2021) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2021.100858 · Cited by 130 · cited 1×
“energy-efficient distributed flow shop with heterogeneous factory [29], energy-efficient distributed FJSP [30], and energyefficient distributed heterogeneous welding flow shop [31].”
BackgroundA simple two-stage evolutionary algorithm for constrained multi-objective optimization
Ming, F., Gong, W., Zhen, H., Li, S., Wang, L., & Liao, Z. (2021) · Knowledge-Based Systems · doi:10.1016/j.knosys.2021.107263 · Cited by 122 · cited 1×
“To further evaluate the effectiveness of the proposed LRVMA, it was compared to the current mainstream MOEAs MOEA/D [48] and NSGA-II [49], the recently proposed MOEAs AR-MOEA [52] and C-TSEA [53], and two new algorithms for ET2FJSP named IAIS [18] and FBEA [6].”
MethodSelf-citationLi, J.-Q., Chen, X., Duan, P., & Mou, J. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2021.3128405 · Cited by 107 · cited 1×
“Li et al. applied RL to adjust the reference point dynamically [43] and Du et al. utilized a deep Q -network with 34 states and nine actions to efficiently describe FJSP [44].”
BackgroundPan, Y., Gao, K., Li, Z., & Wu, N. (2022) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2022.3151648 · Cited by 107 · cited 1×
“…important [21]–[24], for example, the energy-aware distributed hybrid flow shop [25], [26], energy-efficient distributed permutation flow shop [27], [28], energy-efficient distributed flow shop with heterogeneous factory [29], energy-efficient distributed FJSP [30], and energy-efficient distributed…”
BackgroundNonlinear Equations Solving with Intelligent Optimization Algorithms: A Survey
Gong, W., Liao, Z., Mi, X., Wang, L., & Guo, Y. (2021) · Complex System Modeling and Simulation · doi:10.23919/csms.2021.0002 · Cited by 101 · cited 1×
“The cooperation between RL and evolutionary algorithms is a promising direction to solve complex scheduling problems [38]–[42].”
BackgroundSelf-citationFuzzy job-shop scheduling problems: A review
Abdullah, S., & Abdolrazzagh-Nezhad, M. (2014) · Information Sciences · doi:10.1016/j.ins.2014.03.060 · Cited by 97 · cited 1×
“The FJSP with fuzzy processing time (FFJSP) has been studied for several years [7].”
MethodEffective ensembles of heuristics for scheduling flexible job shop problem with new job insertion
Gao, K., Suganthan, P. N., Tasgetiren, M. F., Pan, Q.-K., & Sun, Q. Q. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.09.005 · Cited by 84 · cited 1×
“A cooperative initialization mechanism was inspired by Gao et al. [47] and we use four different rules to generate a high-quality population.”
MethodWang, B., Xie, H., Xia, X., & Zhang, X. (2018) · IEEE Transactions on Fuzzy Systems · doi:10.1109/tfuzz.2018.2879789 · Cited by 81 · cited 1×
“Besides, recently, the multiobjective FFJSP has also obtained increasing attention [14]–[16].”
BackgroundLu, C., Zhang, B., Gao, L., Yi, J., & Mou, J. (2021) · IEEE Systems Journal · doi:10.1109/jsyst.2021.3076481 · Cited by 76 · cited 1×
“These green scheduling models have become more important [21]–[24], for example, the energy-aware distributed hybrid flow shop [25], [26], energy-efficient distributed permutation flow shop [27], [28], energy-efficient distributed flow shop with heterogeneous factory [29], energy-efficient distributed…”
BackgroundSelf-citationShukla, A. K., Nath, R., Muhuri, P. K., & Lohani, Q. M. D. (2019) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2019.103257 · Cited by 63 · cited 1×
“1) Addition Operator: 2) Ranking Operator [18], [45], [46]: s 3 + ( s 5 + s 2 − 2 s 3 )( s 5 + s 4 − 2 s”
An improved Q-learning based rescheduling method for flexible job-shops with machine failures
Zhao, M., Li, X., Gao, L., Wang, L., & Xiao, M. (2019) · IEEE International Conference on Automation Science and Engineering (CASE) · doi:10.1109/coase.2019.8843100 · Cited by 33
Self-citation
Metadata
- Authors
- Li, R., Gong, W., Lu, C., & Wang, L.
- Venue
- IEEE Transactions on Evolutionary Computation
- Published
- 2023-06
- Volume
- 27
- Issue
- 3
- Pages
- 610-620
- ISSN
- 1089-778X (ISSN-L)
- 1941-0026
- OpenAlex
- W4285106612
- Cited by
- 225
- References
- 31
- FWCI
- 20.55
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.