Refining the search for project success factors: a multivariate, typological approach
The DOI matches its Crossref record.
Abstract
Although the causes for project success and failure have been the subject of many studies, no conclusive evidence or common agreement has been achieved so far. One criticism involves the universalistic approach used often in project management studies, according to which all projects are assumed to be similar. A second problem is the issue of subjectiveness, and sometimes weakly defined success measures; yet another concern is the limited number of managerial variables examined by previous research. In the present study we use a project‐specific typological approach, a multidimensional criteria for assessing project success, and a multivariate statistical analysis method. According to our typology projects were classified according to their technological uncertainty at project initiation and their system scope which is their location on a hierarchical ladder of systems and subsystems. For each of the 127 projects in our study that were executed in Israel, we recorded 360 managerial variables and 13 success measures. The use of a very detailed data and multivariate methods such as canonical correlation and eigenvector analysis enables us to account for all the interactions between managerial and success variables and to address a handful of perspectives, often left unanalyzed by previous research. Assessing the variants of managerial variables and their impact on project success for various types of projects, serves also a step toward the establishment of a typological theory of projects. Although some success factors are common to all projects, our study identified project‐specific lists of factors, indicating for example, that high‐uncertainty projects must be managed differently than low‐uncertainty projects, and high‐scope projects differently than low‐scope projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Critical factors for sub-supplier management: A sustainable food supply chains perspective
Grimm, J. H., Hofstetter, J. S., & Sarkis, J. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.12.011 · Cited by 481
Corporate effectuation: Entrepreneurial action and its impact on R&D project performance
Brettel, M., Mauer, R., Engelen, A., & Küpper, D. (2012) · Journal of Business Venturing · doi:10.1016/j.jbusvent.2011.01.001 · Cited by 421
Do project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393
Müller, R., & Jugdev, K. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211269040 · Cited by 390
Joslin, R., & Müller, R. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.03.005 · Cited by 356
Standardized project management may increase development projects success
Milosevic, D., & Patanakul, P. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.11.002 · Cited by 327
Impact of risk management on project performance: the importance of soft skills
Carvalho, M. M. D., & Rabechini Junior, R. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.919423 · Cited by 324
Salomo, S., Weise, J., & Gemünden, H. G. (2007) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2007.00252.x · Cited by 303
Manager emotional intelligence and project success: The mediating role of job satisfaction and trust
Rezvani, A., Chang, A., Wiewiora, A., Ashkanasy, N. M., Jordan, P. J., & Zolin, R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.012 · Cited by 301
The relationship between project governance and project success
Joslin, R., & Müller, R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.01.008 · Cited by 260
Leadership performance is significant to project success or failure: a critical analysis
Nixon, P., Harrington, M., & Parker, D. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211194699 · Cited by 255
Carvalho, M. M., & Rabechini, R. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.018 · Cited by 255
The agility construct on project management theory
Conforto, E. C., Amaral, D. C., da Silva, S. L., Di Felippo, A., & Kamikawachi, D. S. L. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.01.007 · Cited by 254
Verworn, B., Herstatt, C., & Nagahira, A. (2008) · R&D Management · doi:10.1111/j.1467-9310.2007.00492.x · Cited by 253
Project management and its effects on project success: Cross-country and cross-industry comparisons
Carvalho, M. M. D., Patah, L. A., & de Souza Bido, D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.004 · Cited by 243
“…the descriptions in the literature highlighting the impact of complexity (Cleland and Ireland, 2006; Cooke-Davies, 2002; Shenhar, 2001; Shenhar and Dvir, 1996; Shenhar et al., 2002; White and Fortune, 2002) and industry sectors on project performance (Patterson et al., 1999; Raz et al., 2002).”
BackgroundResultRelationships Between Leadership and Success in Different Types of Project Complexities
Muller, R., Geraldi, J., & Turner, J. R. (2012) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2011.2114350 · Cited by 235
“[83], Hoegl and Gemuenden [84], Pinto and Slevin [25], who propose different measurement models for either different aspects of project success or different project types.”
BackgroundFactors associated with the software development agility of successful projects
Sheffield, J., & Lemétayer, J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.011 · Cited by 222
“The concepts and priorities associated with project success vary according to factors such as project type and industry (Cockburn, 2007; Highsmith, 2010; Perrin, 2008; Shenhar et al., 2002).”
BackgroundThe effects of organic and mechanistic control in exploratory and exploitative innovations
Ylinen, M., & Gullkvist, B. (2014) · Management Accounting Research · doi:10.1016/j.mar.2013.05.001 · Cited by 160
Faculty of Business Administration, H. C. M. C. O. U., DOAN, T. T. T., NGUYEN, L. C. T., & NGUYEN, T. D. N. (2020) · The Journal of Asian Finance, Economics and Business · doi:10.13106/jafeb.2020.vol7.no3.223 · Cited by 88
Metadata
- Authors
- Shenhar, A. J., Tishler, A., Dvir, D., Lipovetsky, S., & Lechler, T.
- Venue
- R&D Management
- Publisher
- Wiley
- Published
- 2002-03
- Volume
- 32
- Issue
- 2
- Pages
- 111-126
- ISSN
- 0033-6807 (ISSN-L)
- 1467-9310
- OpenAlex
- W1980745335
- Cited by
- 279
- References
- 0
- FWCI
- 4.33
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.