Neuro‐Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction
Open accessThe DOI matches its Crossref record.
Abstract
Semiconductor hookup construction (i.e., constructing process tool piping systems) is critical to semiconductor fabrication plant completion. During the conceptual project phase, it is difficult to conduct an accurate cost estimate due to the great amount of uncertain cost items. This study proposes a new model for estimating semiconductor hookup construction project costs. The developed model, called FALCON‐COST, integrates the component ratios method, fuzzy adaptive learning control network (FALCON), fast messy genetic algorithm (fmGA), and three‐point cost estimation method to systematically deal with a cost‐estimating environment involving limited and uncertain data. In addition, the proposed model improves the current FALCON by devising a new algorithm to conduct building block selection and random gene deletion so that fmGA operations can be implemented in FALCON. The results of 54 case studies demonstrate that the proposed model has estimation accuracy of 83.82%, meaning it is approximately 22.74%, 23.08%, and 21.95% more accurate than the conventional average cost method, component ratios method, and modified FALCON‐COST method, respectively. Providing project managers with reliable cost estimates is essential for effectively controlling project costs.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Gutierrez Soto, M., & Adeli, H. (2013) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-013-9091-7 · Cited by 346
Rafiei, M. H., & Adeli, H. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001570 · Cited by 269
Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review
Elmousalami, H. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001678 · Cited by 229
Brain-computer interface technologies: from signal to action
Ortiz-Rosario, A., & Adeli, H. (2013) · Reviews in the Neurosciences · doi:10.1515/revneuro-2013-0032 · Cited by 213
“They are capable of approximating any continuous function and solve multiple-class classification problems effectively (Freitag et al., 2011; Puscasu and Codres, 2011; Setiono et al., 2011; Graf et al., 2012; Hsiao et al., 2012; Osornio-Rios et al., 2012).”
BackgroundIslam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Metadata
- Authors
- Hsiao, F., Wang, S., Wang, W., Wen, C., & Yu, W.
- Venue
- Computer-Aided Civil and Infrastructure Engineering
- Publisher
- Elsevier BV
- Published
- 2012-09-17
- Volume
- 27
- Issue
- 10
- Pages
- 764-781
- ISSN
- 1093-9687 (ISSN-L)
- 1467-8667
- OpenAlex
- W1505686907
- Cited by
- 62
- References
- 0
- FWCI
- 15.52
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Neuro‐Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction. https://app.cochat.ai/papers/10.1111/j.1467-8667.2012.00786.x
- The paper
- Hsiao, F., Wang, S., Wang, W., Wen, C., & Yu, W. (2012). Neuro‐Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction. Computer-Aided Civil and Infrastructure Engineering. https://doi.org/10.1111/j.1467-8667.2012.00786.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.