The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY
Abstract
This paper presents a framework for characterizing and studying the uncertainty which can affect inventory investment and service level performance in a material requirements planning (MRP) system. It also presents the results of a simulation experiment which compared two techniques (safety stock and safety lead time) for building inventory to protect against uncertainty. The simulation results disclose consistent differences between the techniques in protecting a representative part against timing and quantity uncertainty in both demand and supply for the part. The paper not only provides some initial insights into the behavior of MRP systems under uncertainty, but also establishes some guidelines for choosing between safety stock and safety lead time.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
material requirements planning
Weik, M. H. (2000) · Springer eBooks · doi:10.1007/1-4020-0613-6_11168 · Cited by 50
Cited by
Pilkington, A., & Meredith, J. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.08.001 · Cited by 537
Supply chain operational risk mitigation: a collaborative approach
Chen, J., Sohal, A. S., & Prajogo, D. I. (2013) · International Journal of Production Research · doi:10.1080/00207543.2012.727490 · Cited by 385
Metadata
- Authors
- Whybark, D. C., & Williams, J. G.
- Venue
- Decision Sciences
- Publisher
- Wiley
- Published
- 1976-10
- Volume
- 7
- Issue
- 4
- Pages
- 595-606
- ISSN
- 0011-7315 (ISSN-L)
- 1540-5915
- OpenAlex
- W2132073472
- Cited by
- 291
- References
- 1
- FWCI
- 6.08
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY. https://app.cochat.ai/papers/10.1111/j.1540-5915.1976.tb00704.x
- The paper
- Whybark, D. C., & Williams, J. G. (1976). MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY. Decision Sciences. https://doi.org/10.1111/j.1540-5915.1976.tb00704.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.