AN ASSESSMENT OF THE LITERATURE ON THE PERFORMANCE OF CONSTRUCTION PROJECTS IN NIGERIA
Open accessAbstract
Nigeria's construction industry is a critical sector that drives economic growth and development, but it faces numerous challenges that affect project performance. This study aimed to identify the factors and obstacles that impede construction project performance in Nigeria through a comprehensive literature review. The review involved a systematic approach to identify relevant studies from reputable academic databases, and the findings were synthesized and analyzed. The study found that poor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management were the primary factors contributing to poor project performance in Nigeria. The study highlights that these factors are interrelated and can exacerbate one another, leading to significant cost overruns, delays, and substandard work. Additionally, the study found that effective project management was a key success factor in improving project performance. To improve construction project performance in Nigeria, the study recommends that stakeholders in the industry should focus on improving project planning and scheduling, risk management, stakeholder management, and promoting ethical standards to curb corruption. By adopting these measures, the Nigerian construction industry can improve project performance, deliver high-quality infrastructure, and contribute to the country's economic growth and development.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
0 of 82 cited sources checked · 0 supported · 0 flagged
- Findingown data
Inadequate risk management is a primary factor contributing to poor project performance in Nigeria.
“The study found that poor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management were the primary factors contributing to poor project performance in Nigeria.”
Quote in the paperSubstantial claim - Findingown data
Poor project planning and scheduling is a primary factor contributing to poor project performance in Nigeria.
“The study found that poor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management were the primary factors contributing to poor project performance in Nigeria.”
Quote in the paperSubstantial claim - Findingown data
Ineffective stakeholder management is a primary factor contributing to poor project performance in Nigeria.
“The study found that poor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management were the primary factors contributing to poor project performance in Nigeria.”
Quote in the paperSubstantial claim - Findingnone given
Effective project management is a key success factor in improving project performance.
“Additionally, the study found that effective project management was a key success factor in improving project performance.”
Quote in the paperSubstantial claim - Findingown data
Corruption is a primary factor contributing to poor project performance in Nigeria.
“The study found that poor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management were the primary factors contributing to poor project performance in Nigeria.”
Quote in the paperSubstantial claim
- Findingcitation
Corruption is a significant factor affecting construction project performance in Nigeria.
“Another significant factor affecting construction project performance in Nigeria is the level of corruption in the industry.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adejumo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Many construction projects in Nigeria suffer from non-compliance with building codes and standards.
“Thirdly, quality of construction was found to be subpar, with studies indicating that many projects in Nigeria suffer from poor workmanship, inadequate materials, and non-compliance with building codes and standards (Ogunsemi et al., 2018;Alinaitwe et al., 2016).”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Ogunsemi et al., 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Alinaitwe et al., 2016
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Corruption in the procurement process is a significant challenge facing construction projects in Nigeria.
“Adejumo et al. (2018) found that corruption in the procurement process was a significant challenge facing construction projects in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adejumo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
According to Ogunsemi et al. (2018), delays in Nigerian construction projects were caused by delays in obtaining permits and approvals.
“Ogunsemi et al. (2018) found that delays were caused by poor communication between project participants, lack of resources, and delays in obtaining permits and approvals.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ogunsemi et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Poor workmanship is a significant factor affecting construction project quality in Nigeria.
“(2019) identified poor workmanship as a significant factor affecting construction project quality in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Oyedele et al. (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Many construction projects in Nigeria suffer from inadequate materials.
“Thirdly, quality of construction was found to be subpar, with studies indicating that many projects in Nigeria suffer from poor workmanship, inadequate materials, and non-compliance with building codes and standards (Ogunsemi et al., 2018;Alinaitwe et al., 2016).”
Quote in the paperNot a substantial claim0 of 2 sources checked- cites Ogunsemi et al., 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Alinaitwe et al., 2016
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingnone given
There is limited research on the impact of cultural and social factors on project performance in Nigeria.
“Another significant gap in the literature is the limited research on the impact of cultural and social factors on project performance.”
Quote in the paperSubstantial claim - Findingcitation
According to Ogunsemi et al. (2018), delays in Nigerian construction projects were caused by poor communication between project participants.
“Ogunsemi et al. (2018) found that delays were caused by poor communication between project participants, lack of resources, and delays in obtaining permits and approvals.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ogunsemi et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
In road construction projects in Nigeria, inadequate funding was a major cause of cost escalation and schedule delays.
“Akinade et al. (2015) conducted a study on road construction projects in Nigeria and found that poor budget management and inadequate funding were major causes of cost escalation and schedule delays.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Akinade et al. (2015)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingown data
Poor quality of construction is among the most significant challenges facing construction projects in Nigeria.
“The analysis of the literature shows that project delays, cost overruns, and poor quality of construction are the most significant challenges facing construction projects in Nigeria.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Corruption in procurement leads to poor quality of work in Nigerian construction projects.
“The study found that corruption led to inflated costs, poor quality of work, and delays in project completion.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adejumo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Poor budget management is a key contributor to project delays and cost overruns in Nigeria.
“Additionally, inadequate funding and poor budget management were found to be key contributors to project delays and cost overruns.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Many construction projects in Nigeria suffer from poor workmanship.
“Thirdly, quality of construction was found to be subpar, with studies indicating that many projects in Nigeria suffer from poor workmanship, inadequate materials, and non-compliance with building codes and standards (Ogunsemi et al., 2018;Alinaitwe et al., 2016).”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Ogunsemi et al., 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Alinaitwe et al., 2016
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
In road construction projects in Nigeria, poor budget management was a major cause of cost escalation and schedule delays.
“Akinade et al. (2015) conducted a study on road construction projects in Nigeria and found that poor budget management and inadequate funding were major causes of cost escalation and schedule delays.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Akinade et al. (2015)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingreasoning
Construction projects in Nigeria frequently face various challenges that adversely affect their performance.
“The reviewed literatures indicates that construction projects in Nigeria frequently face various challenges that adversely affect their performance.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Construction projects in Nigeria experience delays of up to 50% of the scheduled time.
“there is a significant problem of project delays, with studies indicating that projects in Nigeria experience delays of up to 50% of the scheduled time (Akintoye et al., 2003;Odeyinka & Yusif, 2007).”
- Also stated in: § 3.0 RESULTS AND DISCUSSIONS · plain
“Project delays: Many construction projects in Nigeria experience delays of up to 50% of the scheduled time, which can be attributed to poor planning, inadequate project management, and corruption in the industry.”
- Also stated in: § 5.0 CONCLUSION · plain
“One of the significant challenges is project delays, which can last up to 50% of the scheduled time due to poor planning, inadequate project management, and corruption in the industry.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Akintoye et al., 2003
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Odeyinka & Yusif, 2007
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Also stated in: § 3.0 RESULTS AND DISCUSSIONS · plain
- Findingreasoning
There is limited research on the impact of technology on project performance in the Nigerian context.
“One critical gap is the limited research on the impact of technology on project performance.With the rapid development of new construction technologies, such as Building Information Modelling (BIM), the use of these technologies and their impact on project performance remains largely unexplored in the Nigerian context.”
Quote in the paperSubstantial claim - Findingreasoning
There is limited focus on the impact of environmental sustainability on project performance in the Nigerian context.
“Furthermore, the review of the literature reveals a limited focus on the impact of environmental sustainability on project performance.”
Quote in the paperSubstantial claim - Findingcitation
Corruption in procurement leads to inflated costs in Nigerian construction projects.
“The study found that corruption led to inflated costs, poor quality of work, and delays in project completion.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adejumo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Corruption in procurement leads to delays in project completion in Nigerian construction projects.
“The study found that corruption led to inflated costs, poor quality of work, and delays in project completion.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adejumo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Building information modelling (BIM) can reduce project costs in Nigerian construction projects.
“Adebayo et al. (2018)found that the use of building information modelling (BIM) in construction projects in Nigeria can improve project delivery time and reduce project costs.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adebayo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Construction projects in Nigeria often exceed their budgets by as much as 50%.
“Secondly, cost overruns are also a major issue, with studies indicating that projects in Nigeria often exceed their budgets by as much as 50% (Akinade et al., 2015;Olomolaiye et al., 2005).”
- Also stated in: § 5.0 CONCLUSION · plain
“Additionally, construction projects in Nigeria tend to exceed their budgets by as much as 50%, which can be attributed to poor planning, inadequate project management, and corruption.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Akinade et al., 2015
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Olomolaiye et al., 2005
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Also stated in: § 5.0 CONCLUSION · plain
- Findingown data
Cost overruns are among the most significant challenges facing construction projects in Nigeria.
“The analysis of the literature shows that project delays, cost overruns, and poor quality of construction are the most significant challenges facing construction projects in Nigeria.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Building information modelling (BIM) can improve project delivery time in Nigerian construction projects.
“Adebayo et al. (2018)found that the use of building information modelling (BIM) in construction projects in Nigeria can improve project delivery time and reduce project costs.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adebayo et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingown data
Project delays are among the most significant challenges facing construction projects in Nigeria.
“The analysis of the literature shows that project delays, cost overruns, and poor quality of construction are the most significant challenges facing construction projects in Nigeria.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Inadequate funding is a key contributor to project delays and cost overruns in Nigeria.
“Additionally, inadequate funding and poor budget management were found to be key contributors to project delays and cost overruns.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Stakeholder engagement significantly influenced project success in the Nigerian construction industry.
“Adewuyi et al. (2019) found that effective communication, project management, and stakeholder engagement significantly influenced project success in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adewuyi et al. (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Public-private partnerships (PPP) can provide better allocation of risks between the public and private sectors in infrastructure projects in Nigeria.
“Similarly, Adenuga and Oke (2019) highlighted the benefits of public-private partnerships (PPP) in the delivery of infrastructure projects in Nigeria, including improved project management and better allocation of risks between the public and private sectors.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adenuga and Oke (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Effective communication significantly influenced project success in the Nigerian construction industry.
“Adewuyi et al. (2019) found that effective communication, project management, and stakeholder engagement significantly influenced project success in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adewuyi et al. (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Project management significantly influenced project success in the Nigerian construction industry.
“Adewuyi et al. (2019) found that effective communication, project management, and stakeholder engagement significantly influenced project success in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adewuyi et al. (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Findingcitation
Public-private partnerships (PPP) can improve project management in infrastructure projects in Nigeria.
“Similarly, Adenuga and Oke (2019) highlighted the benefits of public-private partnerships (PPP) in the delivery of infrastructure projects in Nigeria, including improved project management and better allocation of risks between the public and private sectors.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Adenuga and Oke (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Premisecitation
Poor project management practices such as poor planning, inadequate risk management, poor communication, and inadequate supervision are significant contributors to poor project performance in Nigeria.
“Poor project management practices such as poor planning, inadequate risk management, poor communication, and inadequate supervision have been identified as significant contributors to poor project performance in Nigeria (Oyegoke et al., 2017;Ujaddughe, 2017).”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Oyegoke et al., 2017
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Ujaddughe, 2017
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Project management is one of the key determinants of project success.
“Similarly, a study by Aibinu and Jagboro (2002) identified project management as one of the key determinants of project success.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Aibinu and Jagboro (2002) source
- Premisecitation
A shortage of resources affects the ability of project managers to meet project requirements within the stipulated time, cost, and quality.
“According to Odeyinka and Yusif (1997), a shortage of resources affects the ability of project managers to meet project requirements within the stipulated time, cost, and quality.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odeyinka and Yusif (1997)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Project complexity significantly affects project performance, with more complex projects having a higher likelihood of experiencing delays and cost overruns.
“Similarly, the study found that project complexity significantly affects project performance, with more complex projects having a higher likelihood of experiencing delays and cost overruns.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Olawale and Sun (2010) source
- Premisecitation
Lack of skilled labour and equipment is a significant barrier to project performance in Nigeria.
“In their study, they found that the lack of skilled labour and equipment is a significant barrier to project performance in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odeyinka and Yusif (1997)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Project management practices such as project planning, scheduling, and monitoring significantly affect project performance.
“A study by Odeyinka and Yusif (1997) found that project management practices, such as project planning, scheduling, and monitoring, significantly affect project performance.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odeyinka and Yusif (1997)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Ineffective team dynamics can result in project delays and cost overruns.
“Osemenam et al. (2020) found that ineffective team dynamics can result in project delays and cost overruns, while effective team dynamics can lead to successful project outcomes.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Osemenam et al. (2020)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Political instability and economic conditions had a negative impact on the performance of construction projects in Nigeria.
“A study conducted by Aibinu and Jagboro (2002) found that political instability and economic conditions had a negative impact on the performance of construction projects in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Aibinu and Jagboro (2002) source
- Premisecitation
External factors such as political instability, economic conditions, and market demand significantly impact construction project success.
“The influence of environmental factors on construction project performance can be seen in the study by Marzouk and Moselhi (2011), who found that external factors such as political instability, economic conditions, and market demand significantly impact construction project success.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Marzouk and Moselhi (2011)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Effective team dynamics can lead to successful project outcomes.
“Osemenam et al. (2020) found that ineffective team dynamics can result in project delays and cost overruns, while effective team dynamics can lead to successful project outcomes.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Osemenam et al. (2020)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationcitation
Political and economic stability are critical factors that must be considered when evaluating the performance of construction projects in Nigeria.
“The study suggests that political and economic stability are critical factors that must be considered when evaluating the performance of construction projects in Nigeria.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Aibinu and Jagboro (2002) source
- Premisecitation
Unclear project objectives can lead to delays, cost overruns, and poor quality outcomes.
“Adeleke and Ogunsemi (2017) found that unclear project objectives can lead to delays, cost overruns, and poor quality outcomes.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adeleke and Ogunsemi (2017)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Effective project management practices, including risk management, quality management, and stakeholder management, significantly influence project performance in the Nigerian construction industry.
“Odeyinka et al. (2013) found that effective project management practices, including risk management, quality management, and stakeholder management, significantly influenced project performance in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Odeyinka et al. (2013)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
Poor infrastructure, such as transportation and communication, is a critical factor affecting project performance.
“Poor infrastructure, such as transportation and communication, has also been identified as a critical factor affecting project performance (Odeyinka & Yusif, 1997).”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odeyinka & Yusif, 1997
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationcitation
Public-private partnerships (PPPs) are a potential solution to some challenges facing construction projects in Nigeria.
“The use of innovative project delivery methods, such as public-private partnerships (PPPs), has been identified as a potential solution to some of the challenges facing construction projects in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adenuga and Oke (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Interpretationreasoning
Political interference in Nigerian construction projects can negatively impact project performance.
“Corruption in the industry is also believed to contribute to the high level of political interference in construction projects in Nigeria, which can negatively impact project performance.”
Quote in the paperNot a substantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Interpretationreasoning
Corruption in the construction industry contributes to project delays in Nigerian construction projects.
“This problem of project delays can be attributed to a variety of factors, including poor planning, inadequate project management, and corruption in the industry.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Interpretationreasoning
Poor quality construction in Nigeria has implications for the longevity of structures.
“This has implications for the safety of buildings and infrastructure, as well as the longevity of the structures.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Study design and conductnone given
A total of 50 studies were included in the final analysis.
“A total of 50 studies were included in the final analysis.”
Quote in the paperNot a substantial claim - Interpretationreasoning
Poor quality construction in Nigeria has implications for the safety of buildings and infrastructure.
“This has implications for the safety of buildings and infrastructure, as well as the longevity of the structures.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Interpretationreasoning
Poor planning contributes to project delays in Nigerian construction projects.
“This problem of project delays can be attributed to a variety of factors, including poor planning, inadequate project management, and corruption in the industry.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Interpretationreasoning
Inadequate project management contributes to project delays in Nigerian construction projects.
“This problem of project delays can be attributed to a variety of factors, including poor planning, inadequate project management, and corruption in the industry.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Interpretationnone given
Poor workmanship in construction projects in Nigeria can lead to poor quality construction and project failures.
“Another major finding of this study is the prevalence of poor workmanship in construction projects in Nigeria, which can lead to poor quality construction and project failures.”
Quote in the paperSubstantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
- Classified as probably not a substantial claim. 28
- The quote only partly states this claim. 4
- May combine two claims. 28
Probably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenFactors influencing construction project performance can be categorized into project management, environmental, organizational, technological, and project-specific factors.
“These factors can be categorized into project management factors, environmental factors, organizational factors, technological factors, and project-specific factors as shown in Table 1.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
FindingcitationAccording to Adenuga and Oke (2019), PPPs for infrastructure delivery in Nigeria could improve project performance by reducing the financial burden on the government.
“Adenuga and Oke (2019) conducted a critical review of the use of PPPs for infrastructure delivery in Nigeria and found that it could improve project performance by increasing private sector participation and expertise, reducing the financial burden on the government, and ensuring greater accountability and transparency in project delivery.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adenuga and Oke (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Probably not a substantial claim: may not pass S3 (load-bearing).
FindingcitationFunding constraints impact the quality of construction in Uganda.
“Similarly, Alinaitwe et al. (2016) highlighted the impact of funding constraints on the quality of construction in Uganda.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Alinaitwe et al. (2016)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Probably not a substantial claim: may not pass S3 (load-bearing).
FindingcitationAccording to Adenuga and Oke (2019), PPPs for infrastructure delivery in Nigeria could improve project performance by ensuring greater accountability and transparency in project delivery.
“Adenuga and Oke (2019) conducted a critical review of the use of PPPs for infrastructure delivery in Nigeria and found that it could improve project performance by increasing private sector participation and expertise, reducing the financial burden on the government, and ensuring greater accountability and transparency in project delivery.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adenuga and Oke (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Probably not a substantial claim: may not pass S3 (load-bearing).
FindingcitationPoor workmanship in Nigerian construction is often caused by the lack of skilled workers.
“According to their study, this is often caused by the lack of skilled workers and the use of poorquality building materials.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Oyedele et al. (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Probably not a substantial claim: may not pass S3 (load-bearing).
FindingcitationPoor workmanship in Nigerian construction is often caused by the use of poor-quality building materials.
“According to their study, this is often caused by the lack of skilled workers and the use of poorquality building materials.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Oyedele et al. (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Probably not a substantial claim: may not pass S3 (load-bearing).
FindingcitationAccording to Adenuga and Oke (2019), PPPs for infrastructure delivery in Nigeria could improve project performance by increasing private sector participation and expertise.
“Adenuga and Oke (2019) conducted a critical review of the use of PPPs for infrastructure delivery in Nigeria and found that it could improve project performance by increasing private sector participation and expertise, reducing the financial burden on the government, and ensuring greater accountability and transparency in project delivery.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adenuga and Oke (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
The quote only partly states this claim.
FindingcitationAccording to Ogunsemi et al. (2018), delays in Nigerian construction projects were caused by lack of resources.
“Ogunsemi et al. (2018) found that delays were caused by poor communication between project participants, lack of resources, and delays in obtaining permits and approvals.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ogunsemi et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
May combine two claims.
InterpretationreasoningPoor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management are interrelated and can exacerbate one another.
“The study highlights that these factors are interrelated and can exacerbate one another, leading to significant cost overruns, delays, and substandard work.”
Quote in the paperSubstantial claimMay combine two claims.
PremisecitationInadequate funding is a significant challenge in the Nigerian construction industry, leading to underfunding of projects and delayed payments to contractors and suppliers.
“Inadequate funding, however, has been a significant challenge in the Nigerian construction industry, leading to underfunding of projects and delayed payments to contractors and suppliers (Adeyinka et al., 2018;Odusami et al., 2017).”
Quote in the paperNot a substantial claim0 of 2 sources checked- cites Adeyinka et al., 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Odusami et al., 2017
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
InterpretationreasoningPoor project planning and scheduling, inadequate risk management, corruption, and ineffective stakeholder management lead to significant cost overruns, delays, and substandard work.
“The study highlights that these factors are interrelated and can exacerbate one another, leading to significant cost overruns, delays, and substandard work.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
PremisecitationLack of project management skills and inadequate government support are significant barriers to effective project management in the Nigerian construction industry.
“The study also revealed that a lack of project management skills and inadequate government support were significant barriers to effective project management in the Nigerian construction industry.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odeyinka et al. (2013)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Classified as probably not a substantial claim. May combine two claims.
PremisecitationLarger projects have a higher likelihood of failure, while shorter projects have a higher probability of success.
“The study revealed that larger projects have a higher likelihood of failure, while shorter projects have a higher probability of success.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Olawale and Sun (2010) source
Classified as probably not a substantial claim. May combine two claims.
InterpretationreasoningProject objectives, project planning, project execution, stakeholder management, team dynamics, and project outcomes can affect project success.
“The conceptual framework for this study is based on a review of the literature on the performance of construction projects in Nigeria, which suggests that several factors can affect project success.These factors include project objectives, project planning, project execution, stakeholder management, team dynamics, and project outcomes.”
Quote in the paperSubstantial claimMay combine two claims.
PremisecitationThe political and economic climate can disrupt project schedules, lead to cost overruns, and even cause projects to be abandoned.
“Their findings indicate that the political and economic climate can disrupt project schedules, lead to cost overruns, and even cause projects to be abandoned altogether.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Aibinu and Jagboro (2002) source
May combine two claims.
InterpretationreasoningInadequate planning can result in delays, cost overruns, and poor quality outcomes.
“However, inadequate planning can result in delays, cost overruns, and poor quality outcomes.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
PremisecitationThe construction industry in Nigeria faces challenges with the availability and use of resources due to lack of proper funding, high interest rates, and inadequate government support.
“Moreover, Ogunsemi and Oladapo (2011) found that the construction industry in Nigeria faces challenges with the availability and use of resources due to several factors such as lack of proper funding, high interest rates, and inadequate government support.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ogunsemi and Oladapo (2011)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationThe Nigerian construction industry faces a shortage of skilled labour, leading to the use of unskilled and semi-skilled workers who may not have the required expertise to deliver projects successfully.
“However, the industry faces a shortage of skilled labour, leading to the use of unskilled and semi-skilled workers who may not have the required expertise to deliver projects successfully (Adeleke & Ogunsemi, 2017;Osemenam et al., 2020).”
Quote in the paperNot a substantial claim0 of 2 sources checked- cites Adeleke & Ogunsemi, 2017
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Osemenam et al., 2020
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationThe regulatory framework in Nigeria's construction industry is fragmented and has led to overlapping regulatory roles.
“Olanrewaju and Ogunsanmi (2015) noted that the regulatory framework in Nigeria's construction industry is fragmented and has led to overlapping regulatory roles.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Olanrewaju and Ogunsanmi (2015)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationPoor project planning, inadequate project monitoring and control, and ineffective communication are significant factors affecting project performance in the Nigerian construction industry.
“Ameh et al. (2018) identified poor project planning, inadequate project monitoring and control, and ineffective communication as the significant factors affecting project performance in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Ameh et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationManagement support, employee training, and availability of resources are important organizational factors influencing construction project success.
“Alinaitwe et al. (2009) identified factors such as management support, employee training, and the availability of resources as important organizational factors influencing construction project success.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Alinaitwe et al. (2009)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationThe regulatory framework in Nigeria's construction industry is often ineffective and lacks clarity, leading to a lack of enforcement and compliance issues.
“It is regulated by various government agencies, but the regulatory framework is often ineffective and lacks clarity, leading to a lack of enforcement and compliance issues (Olanrewaju & Ogunsanmi, 2015;Oyewobi & Ijimdiya, 2020).”
Quote in the paperNot a substantial claim0 of 2 sources checked- cites Olanrewaju & Ogunsanmi, 2015
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Oyewobi & Ijimdiya, 2020
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationThe quality of project outcomes can determine project success or failure.
“Odusami et al. (2017) found that the quality of project outcomes can determine project success or failure.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odusami et al. (2017)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
PremisecitationRegulatory agencies in Nigeria's construction industry face challenges related to inadequate resources, lack of technical expertise, and corruption.
“For instance, Oyegoke and Adebiyi (2015) argued that the regulatory agencies in Nigeria's construction industry face challenges related to inadequate resources, lack of technical expertise, and corruption.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Oyegoke and Adebiyi (2015)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
PremisecitationLack of coordination between regulatory agencies in Nigeria's construction industry has resulted in duplication of efforts and increased cost of compliance for construction firms.
“They argued that the lack of coordination between the various regulatory agencies has resulted in a duplication of efforts and increased the cost of compliance for construction firms.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Olanrewaju and Ogunsanmi (2015)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationEffective project execution can lead to successful project outcomes.
“Ujaddughe (2017) found that poor project execution can result in project failure, while effective project execution can lead to successful project outcomes.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ujaddughe (2017)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationConstruction project performance in Nigeria is affected by the availability of resources (finance, skilled labour, and equipment) and the inadequate provision of infrastructure and logistics such as transportation and communication.
“Construction project performance in Nigeria is affected by the availability of resources, which includes finance, skilled labour, and equipment, and the inadequate provision of infrastructure and logistics such as transportation and communication.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Odeyinka and Yusif (1997)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Classified as probably not a substantial claim. May combine two claims.
PremisecitationLack of skilled personnel, inadequate financing, and inadequate government support are significant barriers to project performance in the Nigerian construction industry.
“The study also revealed that a lack of skilled personnel, inadequate financing, and inadequate government support were significant barriers to project performance in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Ameh et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationEffective project planning can lead to better project outcomes and higher stakeholder satisfaction.
“Oyegoke et al. (2017) found that effective project planning can lead to better project outcomes and higher stakeholder satisfaction.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Oyegoke et al. (2017)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationPoor project execution can result in project failure.
“Ujaddughe (2017) found that poor project execution can result in project failure, while effective project execution can lead to successful project outcomes.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ujaddughe (2017)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationInadequate finance, lack of skilled labour, and poor project planning and management are the primary causes of construction project failure in Nigeria.
“Similarly, Aibinu and Jagboro (2002) found that inadequate finance, lack of skilled labour, and poor project planning and management are the primary causes of construction project failure in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Aibinu and Jagboro (2002) source
May combine two claims.
PremisecitationProject size, duration, and complexity are important determinants of project performance in Nigeria.
“Olawale and Sun (2010) conducted a study on the influence of project-specific factors on project performance in Nigeria and found that project size, duration, and complexity are important determinants.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Olawale and Sun (2010) source
May combine two claims.
PremisecitationPoor communication, inadequate project management, and stakeholder disengagement are significant barriers to project success in the Nigerian construction industry.
“The study also revealed that poor communication, inadequate project management, and stakeholder disengagement were significant barriers to project success in the Nigerian construction industry.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Olawale and Sun (2010) source
May combine two claims.
PremisecitationUse of Building Information Modeling (BIM) can enable project teams to work collaboratively and reduce errors and omissions in project documentation.
“The use of BIM, for example, can enable project teams to work collaboratively and can help reduce errors and omissions in project documentation, as shown in the study by Azhar et al. (2012).”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Azhar et al. (2012)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationStakeholder participation and engagement is a critical factor in the success of public-private partnership (PPP) projects.
“For example, the study by Fang et al. (2015) found that stakeholder participation and engagement is a critical factor in the success of public-private partnership (PPP) projects.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Fang et al. (2015)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationEffective stakeholder management can improve project outcomes and lead to higher stakeholder satisfaction.
“Adeyinka et al. (2018) found that effective stakeholder management can improve project outcomes and lead to higher stakeholder satisfaction.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adeyinka et al. (2018)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationLack of political will is a major challenge to the effective enforcement of regulatory compliance in Nigeria's construction industry.
“Similarly, Adenuga and Oloke (2020) identified the lack of political will as a major challenge to the effective enforcement of regulatory compliance in Nigeria's construction industry.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Adenuga and Oloke (2020)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
PremisecitationThe regulatory framework in the Nigerian construction industry is weak and ineffective, which has led to non-compliance issues among construction firms.
“Similarly, Oyewobi and Ijimdiya (2020) also pointed out that the regulatory framework in the Nigerian construction industry is weak and ineffective, which has led to non-compliance issues among construction firms.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Oyewobi and Ijimdiya (2020)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationThe regulatory framework for construction projects in Nigeria was weak and ineffective.
“Ogunsemi and Oladapo (2011) found that the regulatory framework for construction projects in Nigeria was weak and ineffective.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ogunsemi and Oladapo (2011)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S2 (checkable).
InterpretationcitationA clear and effective regulatory framework is essential to ensure the success of construction projects in Nigeria.
“Their findings suggest that a clear and effective regulatory framework is essential to ensure the success of construction projects in Nigeria.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ogunsemi and Oladapo (2011)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
Study design and conductnone givenThe data analysis process was carried out by two independent reviewers to ensure the accuracy and reliability of the findings.
“The data analysis process was carried out by two independent reviewers to ensure the accuracy and reliability of the findings.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S2 (checkable), S3 (load-bearing).
InterpretationreasoningThere are opportunities for improvement in Nigerian construction through the adoption of new technologies and innovative project delivery methods.
“The literature also suggests that there are opportunities for improvement through the adoption of new technologies and innovative project delivery methods.”
Quote in the paperNot a substantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Classified as probably not a substantial claim.
Study design and conductown dataThe study used a systematic literature review as its research design.
“The research design adopted for this study was a systematic literature review.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Interpretationnone givenCorruption in the Nigerian construction industry contributes to political interference in construction projects.
“Corruption in the industry is also believed to contribute to the high level of political interference in construction projects in Nigeria, which can negatively impact project performance.”
Quote in the paperNot a substantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
May combine two claims.
PremisecitationThe regulatory framework for construction projects in Nigeria lacked clarity and was not effectively enforced, leading to noncompliance issues.
“The study revealed that the regulatory framework lacked clarity and was not effectively enforced, leading to noncompliance issues.”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Ogunsemi and Oladapo (2011)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
The quote only partly states this claim.
InterpretationreasoningCost overruns in Nigerian construction projects are mainly caused by poor planning.
“Again, poor planning, inadequate project management, and corruption were identified as the main causes of this problem.”
Quote in the paperNot a substantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Classified as probably not a substantial claim. May combine two claims.
Study design and conductreasoningThe use of a systematic literature review ensured that the study was comprehensive and included all relevant literature on the topic.
“The use of a systematic literature review ensured that the study was comprehensive and included all relevant literature on the topic.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S1 (asserted), S3 (load-bearing), S4 (based). The quote only partly states this claim.
InterpretationreasoningCost overruns in Nigerian construction projects are mainly caused by corruption.
“Again, poor planning, inadequate project management, and corruption were identified as the main causes of this problem.”
Quote in the paperNot a substantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
The quote only partly states this claim.
InterpretationreasoningCost overruns in Nigerian construction projects are mainly caused by inadequate project management.
“Again, poor planning, inadequate project management, and corruption were identified as the main causes of this problem.”
Quote in the paperNot a substantial claim- Rests on an assumption: The 50 reviewed studies are representative of construction projects in Nigeria.
- Rests on an assumption: The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
Probably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
Study design and conductnone givenThe researchers ensured that all studies included in the review were published in reputable academic journals and were conducted in an ethical and transparent manner.
“However, the researchers ensured that all the studies included in the review were published in reputable academic journals and were conducted in an ethical and transparent manner.”
Quote in the paperNot a substantial claim
The paper relies on this without support.
The performance of construction projects in Nigeria remains a significant concern despite efforts by the Nigerian government and construction stakeholders.
“Despite the efforts made by the Nigerian government and construction stakeholders to address these challenges, the performance of construction projects in Nigeria remains a significant concern.”
The paper relies on this without support.
The 50 studies included in the review are representative of the existing literature on construction project performance in Nigeria.
“A total of 50 studies were included in the final analysis.”
The paper relies on this without support.
The findings of the reviewed studies are sufficiently reliable and valid to be synthesized into conclusions about construction project performance in Nigeria.
“The identified themes and concepts were then synthesized and analysed to draw conclusions and make recommendations for improving the performance of construction projects in Nigeria.”
The paper relies on this without support.
Poor performance of construction projects in Nigeria has resulted in significant cost overruns, schedule delays, and quality issues, leading to project failures, loss of revenue, and poor reputation.
“Poor performance of construction projects has resulted in significant cost overruns, schedule delays and quality issues, leading to project failures, loss of revenue, and poor reputation.”
The paper relies on this without support.
The 50 reviewed studies are representative of construction projects in Nigeria.
“A total of 50 studies were reviewed for this study, with a focus on analysing the performance of construction projects in Nigeria.”
“The analysis of the literature shows that project delays, cost overruns, and poor quality of construction are the most significant challenges facing construction projects in Nigeria.”
The paper relies on this without support.
The findings of the reviewed studies are valid and reliable enough to support the review's conclusions.
“The analysis of the studies revealed several key findings on the performance of construction projects in Nigeria.”
“The reviewed literatures indicates that construction projects in Nigeria frequently face various challenges that adversely affect their performance.”
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
Each contradiction between two passages listed here was confirmed by an independent check.
Publication-year range excludes a study used in the review
MinorThe results describe the reviewed studies as published from 2000 through 2022, yet the literature discussion uses a 1997 study as evidence about project performance.
“The studies were published between 2000 and 2022”
“A study by Odeyinka and Yusif (1997) found that project management practices, such as project planning, scheduling, and monitoring, significantly affect project performance.”
Cites
The qualitative content analysis process
Elo, S., & Kyngäs, H. (2008) · Journal of Advanced Nursing · doi:10.1111/j.1365-2648.2007.04569.x · Cited by 22,617 · cited 1× · see citing works
“This approach involved the identification and categorization of key themes and concepts from the literature (Elo & Kyngäs, 2008).”
MethodTranfield, D., Denyer, D., & Smart, P. (2003) · British Journal of Management · doi:10.1111/1467-8551.00375 · Cited by 15,386 · cited 1× · see citing works
“A systematic literature review is a research approach that involves the identification, evaluation, and synthesis of all relevant literature on a particular topic (Tranfield et al., 2003).”
BackgroundAli, E. M. (2016) · Cited by 4,441 · see citing works
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,335 · see citing works
Bryman, A. E., Bell, E., Reck, J., & Fields, J. (2001) · Cited by 4,059 · see citing works
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222 · cited 1× · see citing works
“To better understand the relationship between these factors and project success, the study draws on the project success model proposed by Shenhar et al. (2001), which provides a multidimensional view of project success.”
BackgroundRisk analysis and management in construction
Akintoye, A., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 758 · see citing works
The effects of construction delays on project delivery in Nigerian construction industry
Aibinu, A. A., & Jagboro, G. O. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00028-5 · Cited by 597 · cited 3× · see citing works
“Similarly, a study by Aibinu and Jagboro (2002) identified project management as one of the key determinants of project success.”
BackgroundInfluentialOlawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478 · cited 3× · see citing works
“Although the study conducted by Olawale and Sun (2010) provides insight into the influence of project-specific factors on project performance, it has some limitations.”
BackgroundResultInfluentialConstruction delays in a fast-growing economy: Comparing Thailand with other economies
Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00052-6 · Cited by 389 · see citing works
Construction Delays and Their Causative Factors in Nigeria
Aibinu, A. A., & Odeyinka, H. A. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(667 · Cited by 347 · cited 1× · see citing works
“Firstly, there is a significant problem of project delays, with studies indicating that projects in Nigeria experience delays of up to 50% of the scheduled time (Akintoye et al., 2003; Odeyinka & Yusif, 2007).”
BackgroundSvejvig, P., & Andersen, P. B. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.06.004 · Cited by 325 · see citing works
EXPLORING CRITICAL SUCCESS FACTORS FOR STAKEHOLDER MANAGEMENT IN CONSTRUCTION PROJECTS
Yang, J., Shen, Q., Ho, C. M., Drew, D. S., & Chan, A. P. C. (2009) · Journal of Civil Engineering and Management · doi:10.3846/1392-3730.2009.15.337-348 · Cited by 265 · see citing works
Research in Modeling and Simulation for Improving Construction Engineering Operations
AbouRizk, S., HALPIN, D. R., Mohamed, Y., et al. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000288 · Cited by 163 · see citing works
Relationship between Project’s Added Value and the Trust–Conflict Interaction among Project Teams
Wu, G., Zhao, X., & Zuo, J. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000525 · Cited by 111 · see citing works
Ethnographic Research in the Construction Industry: A Critical Review
Oswald, D., & Dainty, A. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001917 · Cited by 23 · see citing works
Rani, N. I. A., Ismail, S. B., Mohamed, Z., et al. (2018) · Journal of Construction in Developing Countries · doi:10.21315/jcdc2018.23.1.2 · Cited by 5 · see citing works
Bioclimatic Conditions: A Forgotten Factor in the Domestic Habitat in the City of Palmira, Colombia
Cruz, L. M. M., Echeverri, J. J. D., Arroyave, M. G., et al. (2017) · Journal of Construction in Developing Countries · doi:10.21315/jcdc2017.22.2.6 · Cited by 3 · see citing works
Flagged first, then by citations
1 of the 19 references couldn’t be matched to a known paper.
Research works printed but not linked: 40
- [1]1. Adebayo, A. A., Ogunsemi, D. R., Oluwakinbi, S. A., & Ajao, A. M. (2018). Building information modeling and construction project performance in Nigeria. Journal of Construction Engineering and Management, 144(10), 04018106.
- [2]2. Adejimi, O.A. and Alabi, O.T. (2020) "Cost performance assessment of construction projects in Nigeria," International Journal of Building Pathology and Adaptation, 38 (3), pp. 285-299.
- [3]3. Adejumo, A. O., Oyewobi, L. O., & Odusami, K. T. (2018). The influence of corruption in public procurement on cost performance of public construction projects in Nigeria. International Journal of Civil Engineering and Technology, 9(11), 1785-1792.
- [4]4. Adeleke, A. Q., & Ogunsemi, D. R. (2017). Analysis of the problems and prospects of construction industry in Nigeria. Journal of Construction Engineering and Project Management, 7(2), 1-8. doi: 10.6106/JCEPM.2017.7.2.001 · DOI
- [5]5. Adenuga, O. A., & Oke, A. E. (2019). The use of public-private partnership (PPP) for infrastructure delivery in Nigeria: A critical review. Journal of Construction in Developing Countries, 24(2), 31-48.
- [6]6. Adenuga, O.A., Ojelabi, R.A. and Tunji-Olayeni, P.F. (2019) "Time performance of construction projects in Nigeria," Journal of Construction in Developing Countries, 7.
- [7]7. Adewale, K., & Oke, A. (2016). A study on the causes of delays and time overruns in construction projects in Nigeria. Journal of Construction Engineering and Project Management, 6(2), 1-9.
- [8]8. Adeyinka, A. A., Ogunsemi, D. R., & Oyeyipo, O. (2018). Financing of construction projects in Nigeria: A survey of project financiers' perspective. International Journal of Construction Management, 18(2), 124-135.
- [11]11. Akanbi, L.A. and Akinmoladun, O.I. (2012) "Cost control and management in construction projects: A case study of Nigeria," Journal of Construction in Developing Countries, Vol. 17 No. 1, pp. 35-54.
- [12]12. Akinade, O. O., Oyedele, L. O., Ajayi, A. O., Bilal, M., Owolabi, H. A., & Kadiri, K. O. (2015). Cost escalation and schedule delays in road construction projects in Nigeria. Built Environment Project and Asset Management, 5(3), 266- 281.
- [13]13. Akinade, O. O., Oyedele, L. O., Bilal, M., & Ajayi, S. O. (2015). Cost escalation and schedule delays in road construction projects in Nigeria. Journal of Construction Engineering and Management, 141(8), 04015018.
- [15]15. Akintoye, A., Edwards, P. J., & Hardcastle, C. (2003). Critical success factors for construction procurement in Nigeria. Journal of Construction Procurement, 9(2), 7-17.
- [16]16. Alinaitwe, H. M., Apolot, R. R., & Tindiwensi, D. (2009). Key performance indicators for measuring construction success. Journal of Civil Engineering and Management, 15(4), 337-348. https://doi.org/10.3846/1392-3730.2009.15.337- 348 · DOI
- [17]17. Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2016). Quality issues in construction projects in Uganda: A case of public buildings. Journal of Construction in Developing Countries, 21(2), 35-54.
- [19]19. Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2016). Quality issues in construction projects in developing countries: Uganda as a case study. Journal of Engineering, Design and Technology, 14(2), 285-301.
- [20]20. Alinaitwe, H., Apolot, R. R., & Tindiwensi, D. (2009). Factors influencing effective project management in construction industry: A case of selected construction firms in Uganda. Journal of Civil Engineering and Construction Technology, 1(7), 139-150.
- [21]21. Alinaitwe, H., Apolot, R. R., & Tindiwensi, D. (2009). Factors influencing effective project management in construction industry: A case of selected construction firms in Uganda. Journal of Civil Engineering and Construction Technology, 1(7), 139-150. https://doi.org/10.5897/JCECT09.008 · DOI
- [22]22. Azhar, S., Khalfan, M., Maqsood, T., & Carillo, P. M. (2012). Building information modeling (BIM): A new paradigm for visual interactive modeling and simulation for construction projects. In Proceedings of the 2nd International Conference on Civil Engineering and Building Materials (pp. 93-97).
- [23]23. Azhar, S., Khalfan, M., Maqsood, T., & Carillo, P. M. (2012). Building information modeling (BIM): A new paradigm for visual interactive modeling and simulation for construction projects. In Proceedings of the 2nd International Conference on Civil Engineering and Building Materials (pp. 93-97). https://doi.org/10.1016/j.proeng.2011.11.462 · DOI
- [26]26. Fadugba, S. E., & Afolabi, A. O. (2017). Cost overruns in building construction projects in Nigeria. Journal of Construction in Developing Countries, 22(1), 77-92.
- [27]27. Fang, L., Marle, F., & Yan, X. (2015). Key factors for joint venture success in China: A perspective from foreign construction contractors. International Journal of Project Management, 33(2), 291-302.
- [31]31. Odeyinka, H. A., & Yusif, A. B. (2007). Ineffective communication in the construction industry: causes and possible solutions. Journal of Construction in Developing Countries, 12(1), 13-28.
- [32]32. Odeyinka, H. A., & Yusif, A. M. (1997). Problems and prospects of construction industry development in Nigeria. Journal of Construction Engineering and Management, 123(1), 45-50.
- [33]33. Odeyinka, H. A., & Yusif, A. M. (1997). Problems and prospects of construction industry development in Nigeria. Journal of Construction Engineering and Management, 123(1), 45-50.
- [34]34. Odeyinka, H. A., & Yusif, A. M. (1997). Project planning and control in the Nigerian construction industry. Journal of Construction Engineering and Management, 123(1), 59-66.
- [35]35. Odusami, K. T., Akinjare, V. A., & Ogunde, A. O. (2017). Factors affecting the success of construction projects in Nigeria. Journal of Construction Business and Management, 1(1), 14-26. doi: 10.18768/ijcbr.18412834.01.01.03 · DOI
- [36]36. Odusami, K. T., Oluwoye, J., & Oyewobi, L. O. (2017). Challenges and prospects of the Nigerian construction industry. International Journal of Civil Engineering and Technology, 8(8), 416-424.
- [38]38. Ogunsemi, D. R., & Oladapo, A. A. (2011). Assessment of factors affecting contractors' bidding decisions in Nigeria. Journal of Construction in Developing Countries, 16(2), 19-35.
- [39]39. Ogunsemi, D. R., & Oladapo, A. A. (2011). Assessment of factors affecting contractors' bidding decisions in Nigeria. Journal of Construction in Developing Countries, 16(2), 19-35.
- [40]40. Ogunsemi, D. R., Oluwakiyesi, T. A., Adeaga, O., & Afolabi, A. (2018). Critical factors influencing the performance of construction projects in Nigeria. Journal of Construction Engineering and Management, 144(1), 04017111.
- [41]41. Olanrewaju, A. S., & Ogunsanmi, O. E. (2015). Regulatory framework for construction industry in Nigeria: An assessment of the building code. Journal of Engineering and Applied Sciences, 10(4), 194-200.
- [43]43. Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526.
- [44]44. Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526.
- [45]45. Osemenam, E. A., Igwe, P. A., & Nwulu, N. I. (2020). Effects of unskilled labour on construction project delivery in Nigeria. Journal of Construction in Developing Countries, 25(2), 41-58.
- [47]47. Oyedele, L. O., Owolabi, H. A., Akinade, O. O., & Ajayi, A. O. (2019). Addressing poor workmanship in construction projects in developing 49. Oyegoke, A. S. (2012). Factors affecting construction project performance in Nigeria. Journal of Construction Project Management and Innovation, 2(2), 295-311.
- [49]49. Oyegoke, A. S., Otun, J. A., & Adetunji, I. O. (2017). An assessment of project management practices and its impact on construction project performance in Nigeria. Journal of Construction in Developing Countries, 22(1), 67-83.
- [50]50. Oyewobi, L. O., & Ijimdiya, T. S. (2020). Assessment of the regulatory framework for construction industry in Nigeria. Journal of Construction in Developing Countries, 25(2), 13-25.
- [52]52. Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.). Project Management Institute.
- [55]55. Ujaddughe, A. (2017). Poor project management practices: The bane of construction industry in Nigeria. International Journal of Engineering and Technology, 7(3), 141-144.
- [57]57. Yisa, S. B., & Odesola, I. A. (2011). Project procurement and delivery challenges in the Nigerian construction industry. Journal of Construction Project Management and Innovation, 1(1), 40-54.
Cited by
Sorted by citations
Flawed Institutional Structures: Project Managers Underutilized in Nigeria’s Construction Industry
Iroha, E. V., Watanabe, T., & Tsuchiya, S. (2024) · Buildings · doi:10.3390/buildings14030807 · Cited by 22 · see citing works
“Lack of project management experience as well as improper planning, poor site management, and lack of motivational support were identified as causes of project delay in the NCI [10,18,19].”
Evaluating Governmental Constraints on Construction in Nigeria: A ReviewPreprint
Babalola, O. D., Ugah, U. U. K., & Ndimako, O. O. (2024) · Preprints.org · doi:10.20944/preprints202408.1636.v1 · Cited by 1 · see citing works
Examining Procurement Methods and Practices for Private Construction Projects in Abuja, Nigeria
Omoegbe, O. E., Odu, T. Y., & Obianyo, I. I. (2026) · Construction technologies and architecture · doi:10.4028/p-i0iy40
“Procurement management and time performance, procurement management and cost performance, time performance and quality performance, and communication management and time performance have been found to have the strongest relationships, in that order [21].”
BOBAI, I. A., Nuru, G., MUSA, M. S., et al. (2025) · Kaduna State University Environmental Sciences Journal · doi:10.66884/kesj.2025.4wt34pnz
Ada-okungbowa, O., Akindeinde, A., Adedeji, O. T., et al. (2025) · Journal of Building Design and Environment · doi:10.70401/jbde.2025.0008
Valuation of Project Managers to Enhance Project Performance in Nigeria’s Construction Industry
Iroha, E. V., Watanabe, T., & Tsuchiya, S. (2024) · Buildings · doi:10.3390/buildings14092668 · Cited by 1 · see citing works
- Authors
- Unegbu, H. C. O., Yawas, D., & Dan-asabe, B.
- Affiliations
- Ahmadu Bello University (NG)
- Venue
- Jurnal mekanikal
- Publisher
- Penerbit UTM Press
- Published
- 2023-06-25
- Pages
- 27-38
- ISSN
- 2289-3873 (ISSN-L)
- OpenAlex
- W4382794790
- Cited by
- 6
- References
- 19
- Citations by year
- 2026: 1 · 2025: 2 · 2024: 3
- FWCI
- 1.10
- Type
- journal article
- Language
- en
- Open access
- diamond
- doi.org
- Locations
- Jurnal MEKANIKAL (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Keywords
- construction project performance, Nigerian construction industry, project planning and scheduling, risk management, corruption, stakeholder management, project management, cost overruns, construction delays, moral norms
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Claims read by deepseek-v4.1-flash under definition version 3 (extract-v3) on 2026-10-11.
Classified by jev-1.13-20260917 (gold-guideline-v0.2) on 2026-10-11.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review