The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
How Digital Information Transforms Project Delivery Models
Open accessAbstract
This study articulates how increasingly pervasive digital information transforms project delivery models. It builds on and extends the literature on innovation and knowledge codification, analyzing London’s evolving digital innovation ecosystem across 15 years of industry/government initiatives and infrastructure megaprojects. Findings suggest profound and ongoing changes in digitally enabled project delivery models. Novel contributions are: first, to identify new generations of integrated solutions; second, to articulate changes in supply chains and relationships with owners, operators, and end users; and third, to recognize the growing importance of digital workflows and analytics, rather than documents. There are implications for project management practice and scholarship.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Strategies for Theorizing from Process Data
Langley, A. (1999) · The Academy of Management Review · doi:10.5465/amr.1999.2553248 · Cited by 7,008 · cited 2×
“For this article, data analysis is informed by the emphasis of process studies on events, actions, and choices, using temporal bracketing and narrative analysis strategies (Langley, 1999).”
MethodChallenges of Big Data analysis
Fan, J., Han, F., & Liu, H. (2014) · National Science Review · doi:10.1093/nsr/nwt032 · Cited by 1,482
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Cited by
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“The deepening transformative impact of digital information on project delivery models in construction is already clearly evident (Whyte, 2019).”
BackgroundThe dynamics of systems integration: Balancing stability and change on London's Crossrail project
Muruganandan, K., Davies, A., Denicol, J., & Whyte, J. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.03.007 · Cited by 36
Self-citation
Metadata
- Authors
- Whyte, J.
- Venue
- Project Management Journal
- Publisher
- SAGE Publications
- Published
- 2019-02-05
- Volume
- 50
- Issue
- 2
- Pages
- 177-194
- ISSN
- 1938-9507 (ISSN-L)
- 8756-9728
- OpenAlex
- W2913114948
- Cited by
- 165
- References
- 3
- FWCI
- 11.45
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: How Digital Information Transforms Project Delivery Models. https://app.cochat.ai/papers/10.1177/8756972818823304
- The paper
- Whyte, J. (2019). How Digital Information Transforms Project Delivery Models. Project Management Journal. https://doi.org/10.1177/8756972818823304
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.