The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
Abstract
Classical Economic Manufacturing Quantity (EMQ) models have usually ignored the possibility of process deterioration and the existence of defective items in the production lot. Moreover, the use of machine inspection for maintenance and restoration purposes has not been considered. On the other hand, past studies on maintenance models do not consider the length of a production run to be a decision variable. This paper addresses the problem of joint control of production cycles or manufacturing quantities and maintenance by inspection. A simple relationship has been developed to determine the effectiveness of maintenance by inspection. Furthermore, when maintenance by inspection is adopted, it is shown that the optimal inspection intervals are equally-spaced. The problem of simultaneous determination of EMQ and the inspection schedules is solved by using an approximation to the cost function. The resulting EMQ is found to be an adjustment to the classical EMQ. Finally, the relationships between different parameter values and the magnitudes of the cost penalty for using the classical EMQ are examined.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mathematical Theory of Reliability
Basu, A. P., Barlow, R. E., & Proschan, F. (1966) · Econometrica · doi:10.2307/1909951 · Cited by 2,695
Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
Porteus, E. L. (1986) · Operations Research · doi:10.1287/opre.34.1.137 · Cited by 1,158
Economic Production Cycles with Imperfect Production Processes
Rosenblatt, M. J., & Lee, H. L. (1986) · IIE Transactions · doi:10.1080/07408178608975329 · Cited by 1,049
Self-citationA survey of maintenance models: The control and surveillance of deteriorating systems
Pierskalla, W. P., & Voelker, J. A. (1976) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800230302 · Cited by 678
Maintenance Policies for Stochastically Failing Equipment: A Survey
McCall, J. J. (1965) · Management Science · doi:10.1287/mnsc.11.5.493 · Cited by 465
Cited by
Economic production quantity model for items with imperfect quality
Salameh, M. K., & Jaber, M. Y. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00044-4 · Cited by 1,048
Dynamic model for a defective production system with Poka-Yoke
Tsou, J.-C., & Chen, J.-M. (2005) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601877 · Cited by 32
Metadata
- Authors
- Lee, H. L., & Rosenblatt, M. J.
- Venue
- Management Science
- Published
- 1987-09
- Volume
- 33
- Issue
- 9
- Pages
- 1125-1136
- ISSN
- 0025-1909 (ISSN-L)
- 1526-5501
- OpenAlex
- W2047170952
- Cited by
- 416
- References
- 5
- FWCI
- 12.93
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System. https://app.cochat.ai/papers/10.1287/mnsc.33.9.1125
- The paper
- Lee, H. L., & Rosenblatt, M. J. (1987). Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System. Management Science. https://doi.org/10.1287/mnsc.33.9.1125
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.