Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies
Open accessThe DOI matches its Crossref record; 40 of the 40 references it cites were found in a registry or an index.
Abstract
Successful application of concurrent development processes (concurrent engineering) requires tight coordination. To speed development, tasks often proceed in parallel by relying on preliminary information from other tasks, information that has not yet been finalized. This frequently causes substantial rework using as much as 50% of total engineering capacity. Previous studies have either described coordination as a complex social process, or have focused on the frequency, but not the content, of information exchanges. Through extensive fieldwork in a high-end German automotive manufacturer, we develop a framework of preliminary information that distinguishes information precision and information stability. Information precision refers to the accuracy of the information exchanged. Information stability defines the likelihood of changing a piece of information later in the process. This definition of preliminary information allows us to develop a time-dependent model for managing interdependent tasks, producing two alternative strategies: iterative and set-based coordination. We discuss the trade-offs in choosing a coordination strategy and how they change over time. This allows an organization to match its problem-solving strategy with the interdependence it faces. Set-based coordination requires an absence of ambiguity, and should be emphasized if either starvation costs or the cost of pursuing multiple design alternatives in parallel are low. Iterative coordination should be emphasized if the downstream task faces ambiguity, or if starvation costs are high and iteration (rework) costs are low.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Building Theories from Case Study Research
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.2307/258557 · Cited by 17,455
(2008) · Biostatistics and Microbiology: A Survival Manual · doi:10.1007/978-0-387-77282-0_6 · Cited by 17,371
The Knowledge-Creating Company
Nonaka, I. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50016-1 · Cited by 14,619
Software Engineering Economics
Boehm, B. W. (2001) · Pioneers and Their Contributions to Software Engineering · doi:10.1007/978-3-642-48354-7_5 · Cited by 5,981
The Collapse of Sensemaking in Organizations: The Mann Gulch Disaster
Weick, K. E. (1993) · Administrative Science Quarterly · doi:10.2307/2393339 · Cited by 5,000
Product development: Past research, present findings and future directions
Brown, S. L., & Eisenhardt, K. M. (1995) · The Academy of Management Review · doi:10.2307/258850 · Cited by 3,777 · cited 3×
“Coordination strategies outlined in the existing organizational literature have primarily focused on finding appropriate organizational structures to respond to uncertainty and interdependencies (Brown and Eisenhardt 1995).”
BackgroundMicromotives and Macrobehavior
Eaton, B. C., & Schelling, T. C. (1981) · The Canadian Journal of Economics · doi:10.2307/134812 · Cited by 3,758
The role of product architecture in the manufacturing firm
Ulrich, K. (1995) · Research Policy · doi:10.1016/0048-7333(94)00775-3 · Cited by 2,885
Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry
Eisenhardt, K. M., & Tabrizi, B. N. (1995) · Administrative Science Quarterly · doi:10.2307/2393701 · Cited by 2,426
Product development performance: strategy, organization, and management in the world auto industry
(1991) · Choice Reviews Online · doi:10.5860/choice.29-1591 · Cited by 2,389
Cited by
The Misalignment of Product Architecture and Organizational Structure in Complex Product Development
Sosa, M. E., Eppinger, S. D., & Rowles, C. M. (2004) · Management Science · doi:10.1287/mnsc.1040.0289 · Cited by 656
Product architecture assessment: a tool to link product, process, and supply chain design decisions
Fixson, S. K. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.08.006 · Cited by 491
Swink, M., & Song, M. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2006.03.001 · Cited by 331
Technology‐Based New Product Development Partnerships*
Ettlie, J. E., & Pavlou, P. A. (2006) · Decision Sciences · doi:10.1111/j.1540-5915.2006.00119.x · Cited by 308
Sauser, B. J., Reilly, R. R., & Shenhar, A. J. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.01.004 · Cited by 285
Problem–Solving Oscillations in Complex Engineering Projects
Mihm, J., Loch, C., & Huchzermeier, A. (2003) · Management Science · doi:10.1287/mnsc.49.6.733.16021 · Cited by 280
Self-citationCROSSROADS—Identifying Viable “Need–Solution Pairs”: Problem Solving Without Problem Formulation
von Hippel, E., & von Krogh, G. (2016) · Organization Science · doi:10.1287/orsc.2015.1023 · Cited by 239
Perspectives on iteration in design and development
Wynn, D. C., & Eckert, C. M. (2017) · Research in Engineering Design · doi:10.1007/s00163-016-0226-3 · Cited by 222
A Survey of Activity Network‐Based Process Models for Managing Product Development Projects
Browning, T. R., & Ramasesh, R. V. (2007) · Production and Operations Management · doi:10.1111/j.1937-5956.2007.tb00177.x · Cited by 210
“In the context of activity overlapping, Terwiesch, Loch, and Meyer (2002) present a framework for communicating the accuracy and stability of preliminary information, and in contexts of low ambiguity recommend a set-based approach (Sobek, Ward, and Liker 1999) wherein each activity maintains a set…”
BackgroundDu, L., Zhang, Z., & Feng, T. (2018) · Business Strategy and the Environment · doi:10.1002/bse.2223 · Cited by 209
Understanding the Impact of Collaboration Software on Product Design and Development
Banker, R. D., Bardhan, I., & Asdemir, O. (2006) · Information Systems Research · doi:10.1287/isre.1060.0104 · Cited by 185
“As Terwiesch et al. (2002) observed, early detection and correction of design errors improves downstream manufacturing flexibility and reduces design adjustment costs later if the product information is unstable.”
InfluentialLean Product Development Research: Current State and Future Directions
León, H. C. M., & Farris, J. A. (2011) · Engineering Management Journal · doi:10.1080/10429247.2011.11431885 · Cited by 160
Hierarchical Structure and Search in Complex Organizations
Mihm, J., Loch, C. H., Wilkinson, D., & Huberman, B. A. (2010) · Management Science · doi:10.1287/mnsc.1100.1148 · Cited by 154
“Sometimes, certain subproblems are considered more important or certain departments are more powerful and have more status than others (Terwiesch et al. 2002)—in some companies, marketing has this status; in others, it is engineering or manufacturing.”
BackgroundSelf-citation
Metadata
- Authors
- Terwiesch, C., Loch, C. H., & Meyer, A. D.
- Venue
- Organization Science
- Published
- 2002-08
- Volume
- 13
- Issue
- 4
- Pages
- 402-419
- ISSN
- 1047-7039 (ISSN-L)
- 1526-5455
- OpenAlex
- W2123253589
- Cited by
- 300
- References
- 40
- FWCI
- 17.12
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.