The DOI matches its Crossref record.
Lost Roots: How Project Management Came to Emphasize Control over Flexibility and Novelty
Abstract
The discipline of project management (PM) adheres to the dominant model of the project life cycle or phased stage-gate approach to executing projects. This implies a clear definition of mission and system are given at the outset (to reduce uncertainty), and subsequent execution in phases with decision gates. It contrasts with approach applied in the seminal projects that are credited with establishing the foundation of the discipline in the 1940s and 50s. Those projects started out with missions that were beyond the currently possible; any solutions had to emerge over time. They succeeded by a combination of parallel trials (from which the best would then be selected) and trial-and-error iteration (allowing for the modification of solutions pursued over a period of time). Although the success of these approaches was well documented and explained by scientific study in the 1950s, today they seem to fly in the face of accepted professional standards, making managers uncomfortable when they are encountered. The explanation for this contradiction has its roots in the 1960s, when the so-called McNamara revolution at the Department of Defense (DoD) gave a control orientation to the PM discipline. This shift was cemented by the codes and practices of the DoD and NASA, contemporary scientific writing, and the foundation of the Project Management Institute, a professional organization that translated the standard into the educational norm for a generation of project managers. The proj…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Ironically, however, it seems that project teams spend most of their time on the science structured parts, and only a small portion on the art parts [5].”
From What is Strategic Project Leadership? (2015) · cites this paper as [5]
In the citing paper
“Two influential studies by Williams [4] and Lenfile and Loch [5] have demonstrated specific shortcomings such as, sticking to an operational view based on the triple constraint, or the focus on excessive control of process, while neglecting to deal with uncertainty and change.”
From What is Strategic Project Leadership? (2015) · cites this paper as [5]
Citations
Cited by
Items 301–365 of 365
ARTETERAPIA COMO PROPOSTA INTERVENTIVA EM UM CENTRO DE ATENÇÃO PSICOSSOCIAL
Mariano, E. F., Félix, C. M., da Fonseca, A. N., Gregório, G. B. D. S., Corradini, V. M., & Grossi-Milani, R. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.64
TRATAMENTO DE EFLUENTE DE BIODIESEL APLICANDO ELETROFLOCULAÇÃO
Oliszeski, D. C. S., Banczek, É. D. P., Maia, G. A. R., Matheus, A. P. C., Larsson, L. F. G., Guareski, M. M. C., & Fürstenberger, C. B. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.118
A EXPANSÃO DA ENERGIA EÓLICA NO BRASIL: UM PANORAMA DA REGIÃO NORDESTE
Campos, A. F., & CAMPOS, G. A. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.31
Toledo, M. V. D. S., Lemos, K. D. D. C., & TOLEDO, M. V. D. S. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.6
COMPORTAMENTO DE CONSUMO DE USUÁRIOS DO FACEBOOK
CORREIA, A. C. B. S., Souki, G. Q., & Moura, L. R. C. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.19
Periotto, T. R. C., Urpia, A. G. B. D. C., & Andretto, L. B. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.25
Managing uncertainty (opportunities and threats) in megaprojects
Rickaby, B., Krystallis, I., & Davies, A. C. (2018) · UCL Discovery (University College London)
The role of KIBS in the clients’ knowledge absorption process: the case of exploration innovation
Chauvet, V., Imbert, G., & Mothe, C. (2013) · HAL
Digital Value-Added Services: Recommendations for Early Development
Matt, C., Huppatz, M., Dowling, M. J., & Heß, T. (2020) · Hawaii International Conference on System Sciences (HICSS) · doi:10.24251/hicss.2020.708
Skapelsen av et klyngeprosjekt: Innovasjonsprosesser i dannelsen av et klyngeprosjekt
Johansen, F. R. (2019) · VBN Forskningsportal (Aalborg Universitet) · doi:10.54337/aau306506380
How to expect the unexpected? : Boundaries of rational planning in projects
Eskola, A. (2020) · Osuva (University of Vaasa)
Связывание научных ресурсов: построение жизненного цикла их связи
МАЙЕРНИК, М., & Mayernik, M. S. (2020) · Международный форум по информации · doi:10.36535/0203-6460-2020-01-3
Controller Involvement in a Project Management Setting: Effects on Project Functions and PerformancePreprint
Malagueño, R., Gomez‐Conde, J., de Harlez, Y., & Hoffmann, O. (2020) · SSRN Electronic Journal · doi:10.2139/ssrn.3630994
Masson, P. L., Lenfle, S., & Weil, B. (2013) · HAL
Self-citationVirtual Visual Planning: A Methodology to Assess Digital Project Management Tools
Biazzo, S., Fabris, A., & Panizzolo, R. (2020) · International Journal of Applied Research in Management and Economics · doi:10.33422/ijarme.v3i4.505
Design of Services for the Management of Incremental Innovation in SMEs
Proença, J. J. C., & Jiménez‐Sáez, F. (2018) · DIGITAL.CSIC (Spanish National Research Council (CSIC))
Chapman, C. B., & Ward, S. C. (2012) · Wiley eBooks · doi:10.1002/9781119208587.refs
(2017) · Advances in business strategy and competitive advantage book series · doi:10.4018/978-1-5225-2503-5.ch004
Besio, C. (2019) · Springer eBooks · doi:10.1007/978-3-658-17671-6_34-1
Arbi, F. E., & Ahlemann, F. (2012) · Springer eBooks · doi:10.1007/978-3-642-34761-0_1
Reverdy, T. (2021) · Dunod eBooks · doi:10.3917/dunod.rever.2021.01.0275
Advancing Temporal Organizing: The Case for a Practising School in Project-Based Organizing
Antonacopoulou, E. P., Turner, N. W., Al‐Tabbaa, O., Michaelides, R., & Schuster, A. (2022) · Academy of Management Proceedings · doi:10.5465/ambpp.2022.12140abstract
Introduction to Innovation Project Management
Kerzner, H. (2022) · Wiley eBooks · doi:10.1002/9781119931270.ch1
Transforming Engineering Systems: Learnings from Organising Megaprojects
Geraldi, J. G., & Davies, A. C. (2023) · Springer eBooks · doi:10.1007/978-3-030-46054-9_23-3
Tobin-Littlewood, J. G., Sanchez‐Schmitz, G., & Pérez-Soltero, A. (2022) · Journal Industrial Organization · doi:10.35429/jio.2022.11.6.24.33
Digital-physical product development: towards a tentative theory
Hendler, S. (2021) · VBN Forskningsportal (Aalborg Universitet) · doi:10.54337/aau429194246
Evaluation of Project Management Education in Terms of Academic Stress Factors
Geylani, Ö., & Güner, A. F. (2023) · Journal of Turkish Studies · doi:10.7827/turkishstudies.67692
Beyond the boundary and scale of the construction project
Chan, P. (2023) · Edward Elgar Publishing eBooks · doi:10.4337/9781800375451.00012
Megaprojekty. Dylematy oceny i podejmowania decyzji
Inwestycji, K., Marcinek, K., Finansów, W., Foltyn-Zarychta, M., & Tomecki, M. (2023) · doi:10.22367/uekat.9788378758556
Bollinger, S. (2023) · Wiley eBooks · doi:10.1002/9781394255566.refs
A Model for Dealing with Epistemic Uncertainties in Agile Software Project ManagementPreprint
Barbosa, J. F., de Farias, I. H., Marinho, M., & de Moura, H. P. (2024) · SSRN Electronic Journal · doi:10.2139/ssrn.4848407
Project Pitch: utilização do design thinking no processo de seleção dos projetos
de Azevedo, P. H. D. D. A. M., Campos, A. G. F., & Mendes, A. M. (2024) · Revista Produção Online · doi:10.14488/1676-1901.v24i2.5108
Optimising Decision-Making: Devising a Framework Applicable to Project Management Practitioners
Kurtuk, I. C., & Polkinghorne, M. (2024) · Eurasian studies in business and economics · doi:10.1007/978-3-031-51212-4_4
An Ambidexterity Perspective on New Product DevelopmentPreprint
Xu, X., Fey, C. F., & Birkinshaw, J. (2025) · SSRN Electronic Journal · doi:10.2139/ssrn.5174218
Besio, C. (2025) · Springer eBooks · doi:10.1007/978-3-031-25143-6_23-1
Kiilerich, R. (2025) · OpenArchive@CBS (Copenhagen Business School) · doi:10.22439/phd.19.2025
Rethinking Schedule Quality Risk Assessment
Oliver, M. E., & Rodjom, P. T. (2025) · Beyond the Project Horizon Journal of the Center for Project Management Innovation · doi:10.59964/2993-2556.1023
Voyages of Discovery: Balancing Leadership, Control, and Capabilities in Megaproject Delivery
Vine, R., Kortantamer, D., & Davies, A. C. (2025) · Cambridge University Press eBooks · doi:10.1017/9781009322737.005
Guiding Principles: What Is Project Behavior and Why It Matters
Ika, L. A., & Pinto, J. K. (2025) · Cambridge University Press eBooks · doi:10.1017/9781009322737.002
Value Trade-Offs in Matching Functions: Evidence From Online Labor Markets
Alshalfan, A., Qi, L., & Baveja, A. (2025) · International Journal of E-Business Research · doi:10.4018/ijebr.396248
Flening, E. (2023) · KTH Publication Database DiVA (KTH Royal Institute of Technology)
Baldursdóttir, E. B. (2021) · Skemman
Reducing Project Uncertainty through Data-Driven Management: A Bibliometric Analysis
Salykova, L., & Zhandos, M. (2026) · The economy strategy and practice · doi:10.51176/1997-9967-2025-4-97-113
Tikkanen, L. (2024) · Tampere University Institutional Repository (Tampere University)
Contribution to a general theory of design
Huysentruyt, J. (2013) · theses.fr (ABES) · doi:10.70675/3f09fbc7z0f8cz4610zb4e3zf12d04d19e16
Process modeling of innovative design using systems engineering
ZHANG, Q. (2014) · theses.fr (ABES) · doi:10.70675/a4040cd3zce0ez4cfcz9866zc39bc9fc4ac3
Identification et structuration des champs d'innovation dans une business unit
Lepers, T. (2016) · theses.fr (ABES) · doi:10.70675/50787a1bzda7dz452fz8866zdbe0529e1abc
Conception innovante de lignées de services complexes dans l’industrie d’armement européenne
Nicolaÿ, A. (2017) · theses.fr (ABES) · doi:10.70675/ffff2a61zcf71z47e1z81dbzb8b3986eb4a5
Bollinger, S. (2019) · theses.fr (ABES) · doi:10.70675/26464f7azae8cz4c64za205z1b44a59778ad
La capacité d'improvisation en équipe : le cas de la phase de pré-implémentation d’un projet en SI
Bouakaz, K. (2022) · theses.fr (ABES) · doi:10.70675/39000f63zfe1bz4cf8zbc26z6e09b9971e46
Industrial qualitative diagnosis support system
Fouqué, A. (2021) · theses.fr (ABES) · doi:10.70675/05df5a20z304fz4d46zba8bzbef41141d84b
Jiang, K., Le, Y., Denicol, J., Zheng, X., Liu, R., & Zhang, X. (2026) · International Journal of Project Management · doi:10.1016/j.ijproman.2026.102852
Rémondeau, E. (2023) · theses.fr (ABES) · doi:10.70675/83536a6czaaa2z474az86e1z045c9cc73a39
Institutions, projets, réseaux : le management de l’innovation dedéfense en perspectives
Colin, L. (2025) · theses.fr (ABES) · doi:10.70675/d74d2718zf0afz478dz8426z9c8bafd7b264
Customer-side governance in engineer-to-order procurement: Evidence from capital equipment projects
Käkelä, N. (2026) · International Journal of Production Economics · doi:10.1016/j.ijpe.2026.110099
Wilczak, A. (2019) · ReIn UW (University of Warsaw)
Görgün, A. (2026) · Iğdır üniversitesi sosyal bilimler dergisi · doi:10.54600/igdirsosbilder.1921565
Metadata
- Authors
- Lenfle, S., & Loch, C.
- Venue
- California Management Review
- Publisher
- SAGE Publications
- Published
- 2010-11
- Volume
- 53
- Issue
- 1
- Pages
- 32-55
- ISSN
- 0008-1256 (ISSN-L)
- 2162-8564
- OpenAlex
- W2054262764
- Cited by
- 348
- References
- 0
- Citations by year
- 2026: 8 · 2025: 15 · 2024: 22 · 2023: 20 · 2022: 25 · 2021: 30 · 2020: 27 · 2019: 27 · 2018: 40 · 2017: 26 · 2016: 25 · 2015: 19 · 2014: 20 · 2013: 22 · 2012: 15
- FWCI
- 18.75
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- journals.sagepub.com/page/policies/text-and-data-mining-license (tdm)
- Locations
- California Management Review (publishedVersion)
- HAL (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Management Theory and Practice
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Management and Organizational Studies
- Keywords
- project management, control, flexibility, novelty, organizational change
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.