Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 587

The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.

Projected Costs of Generating Electricity 2010

OECD, Nuclear Energy Agency, International Energy Agency·2010·Projected Costs of Generating Electricity

Abstract

This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1787/9789264084315-en

Cites

11 of 11 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 11 references

Cited by

Metadata

Authors
OECD, Nuclear Energy Agency, & International Energy Agency
Venue
Projected Costs of Generating Electricity
Publisher
OECD
Published
2010-03-24
ISSN
  • 2079-8385 (ISSN-L)
  • 2079-8393
OpenAlex
W2796365934
Cited by
587
References
11
FWCI
25.20
Type
book
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Projected Costs of Generating Electricity 2010. https://app.cochat.ai/papers/10.1787/9789264084315-en
The paper
OECD, Nuclear Energy Agency, & International Energy Agency. (2010). Projected Costs of Generating Electricity 2010. Projected Costs of Generating Electricity. https://doi.org/10.1787/9789264084315-en

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.