Cited by 6BIM and Construction IntegrationDigital Transformation in IndustryConstruction Project Management and Performance

DIGITAL TWIN APPLICATION IN CONSTRUCTION COST MANAGEMENT

Open access
Che Haron, Roziha, Muhd Zafir, Nurnaqueisha Balqis·2025·PLANNING MALAYSIA

Abstract

In line with the current construction revolution, it is time for the construction industry to embrace innovation and technology. This is corresponding with the National Construction Policy 2030 (NCP 2030) that comes out with the aim to digitalize the entire construction industry towards the IR 4.0. The focus is to boost the nation's construction industry's competitiveness and recognition worldwide. The construction industry has undergone a significant transformation in recent years such as BIM, IoT including Digital Twin due to the incorporation of digital technologies. A digital twin is a virtual representation of a physical asset. It is still a relatively new concept in the construction industry, but it offers an innovative method for improving cost management strategies in construction projects. Applications of the digital twin in construction cost management have the potential to revolutionize conventional methods. Therefore, this study seeks to determine the level of understanding of construction industry players on the concept of digital twin applications in construction cost management by providing the concept and to explore the challenges and strategies in implementing the digital twin applications in construction cost management. This research employed a mixed-method approach by means of questionnaire survey and interview for data collection. 35 samples that consist of construction industry players from different organizations participated in this study. The data collected from the survey and interview are analyses through descriptive and content analysis. Overall, the findings find out the understanding of digital twin applications with its challenges and strategies to overcome it. This research contributes to the body of knowledge regarding digital twin applications and construction cost management.

Integrity signals

Registry

Crossref · 10.21837/pm.v23i35.1665

Cites

5 of 5 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Cites

Flagged first, then by citations

Cited by

Sorted by citations

Authors
Che Haron, R., & Muhd Zafir, N. B.
Venue
PLANNING MALAYSIA
Published
2025-02-05
Volume
23
ISSN
  • 0128-0945 (ISSN-L)
  • 1675-6215
OpenAlex
W4407181369
Cited by
6
References
5
Citations by year
2026: 3 · 2025: 3
FWCI
2.51
Type
journal article
Language
en
Open access
Locations
  • PLANNING MALAYSIA (publishedVersion, cc-by-nc-nd)
  • The International Islamic University Malaysia Repository (The International Islamic University Malaysia) (submittedVersion)
Funders
International Islamic University Malaysia
Topics
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
  • Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
Keywords
digital twin, construction cost control, construction industry, Industry 4.0, digitalization of construction, implementation barriers, implementation strategies, building information modeling, Internet of Things

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review