BIM and Digital Twin for Developing Convergence Technologies as Future of Digital Construction
Open accessThe DOI matches its Crossref record; 109 of the 109 references it cites were found in a registry or an index.
Abstract
The construction industry is slow to adopt new technologies. The implementation of digital technologies and remote operations using robots were considered farfetched affairs and unbelievable approaches. However, the effect of COVID-19 on clients and construction companies put high pressure on construction managers to seek digital solutions and justified the need for remote operating or distant controlling technologies. This paper aims to investigate the state of play in construction technology implementation and presents a roadmap for developing and implementing required technologies for the construction industry. The COVID-19 disruption required new methods of working safely and remotely and coincided with the advent of advanced automation and autonomous technologies. This paper aims to identify gaps and 11 disruptive technologies that may lead to upheaval and transformation of the construction sector, perhaps in this decade. A road map for technology implementation can be helpful in developing business strategies at the organizational level as a theoretical measure, and it can facilitate the technology implementation process at the industry level as a practical measure. The roadmap can be used as a framework for policymakers to set industry or company strategies for the next 10 years (2030).
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Lasi, H., Fettke, P., Kemper, H.-G., Feld, T., & Hoffmann, M. (2014) · Business & Information Systems Engineering · doi:10.1007/s12599-014-0334-4 · Cited by 4,276 · cited 1×
“0 refers to a German national innovation initiative for a planned fourth industrial revolution aiming to secure Germany’s position as the leading manufacturer of high-tech consumer goods [47].”
BackgroundPan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Baduge, S. K., Thilakarathna, S., Perera, J. S., Arashpour, M., Sharafi, P., Teodosio, B., Shringi, A., & Mendis, P. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104440 · Cited by 1,007
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853 · cited 1×
“…needs to be improved for FM; the industry foundation class (IFC) open standards need to be reviewed for the information demand of FM BIM and IoT devices integration [70] The real-time data from IoT are connected to BIM models and the research about integration of BIM and IoT in the initial stage.”
Leitão, P., Colombo, A. W., & Karnouskos, S. (2016) · Computers in Industry · doi:10.1016/j.compind.2015.08.004 · Cited by 672 · cited 1×
“CPS is a broader concept to enhance the information models like BIM; it was developed more than 15 years ago and advocates for the interaction of cyber and physical elements [79].”
BackgroundSemantic web technologies in AEC industry: A literature overview
Pauwels, P., Zhang, S., & Lee, Y.-C. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.10.003 · Cited by 522
The smart factory as a key construct of industry 4.0: A systematic literature review
Osterrieder, P., Budde, L., & Friedli, T. (2020) · International Journal of Production Economics · doi:10.1016/j.ijpe.2019.08.011 · Cited by 498 · cited 3×
“0 is an initiative developed progressively in Germany, where high-tech consumer goods manufacturing is well established and a key component of gross domestic product Figure 4 illustrates a possible model based on Oster-rieider’s et al. [48] four-layered smart factory concept.”
BackgroundInfluentialFrom BIM to extended reality in AEC industry
Alizadehsalehi, S., Hadavi, A., & Huang, J. C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103254 · Cited by 469 · cited 6×
“It been embracing the digital generation for a long time and seeking further development is a semantic web language that aims to describe complex knowledge, groups, and relations of things [66].”
BackgroundInfluentialBabiceanu, R. F., & Seker, R. (2016) · Computers in Industry · doi:10.1016/j.compind.2016.02.004 · Cited by 461 · cited 3×
“Also, the possibilities of cloud computing and the 5G network were explored with XR implementations, presenting alternatives for close real-time processing and visualization [11,81].”
BackgroundMethodCloud computing in construction industry: Use cases, benefits and challenges
Bello, S. A., Oyedele, L. O., Akinade, O. O., Bilal, M., Davila Delgado, J. M., Akanbi, L. A., Ajayi, A. O., & Owolabi, H. A. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103441 · Cited by 452 · cited 6×
“Bello et al. [11] suggested the use of cloud processing to overcome these limitations; however, in the light of proposing this, other issues arise, such as latency, data availability, band connectivity, security, and expensive charges for cloud usage.”
BackgroundMethodInfluentialLee, D., Lee, S. H., Masoud, N., Krishnan, M. S., & Li, V. C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103688 · Cited by 428 · cited 3×
“In another study, Lee et al. [34] integrated DT and BCT to provide traceable data transactions in near real-time for a prefabricated project.”
BackgroundInfluentialDeng, M., Menassa, C. C., & Kamat, V. R. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.005 · Cited by 422 · cited 3×
“It integrates the physical world with a virtual platform to control the construction process and environmental monitoring [52].”
BackgroundIntegration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
Wang, H., Pan, Y., & Luo, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.005 · Cited by 384 · cited 1×
“[63] investigated BIM and GIS integration in sustainable built environments.”
BackgroundIndustry 4.0 as policy-driven discourse to institutionalize innovation systems in manufacturing
Reischauer, G. (2018) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2018.02.012 · Cited by 381 · cited 2×
“The initiative is composed of a complex network of government agencies, scientific institutions, and research projects established in central Germany after the 2011 Hanover Fair [1].”
BackgroundCircular Digital Built Environment: An Emerging Framework
Çetin, S., De Wolf, C., & Bocken, N. (2021) · Sustainability · doi:10.3390/su13116348 · Cited by 367 · cited 4×
“The future will include circular economy principles with sustainable construction to develop more energy-efficient buildings and net zero emissivity [26].”
BackgroundMethodInfluentialSepasgozar, S. M. E. (2021) · Buildings · doi:10.3390/buildings11040151 · Cited by 367 · cited 6×
“…[77] emphasized the crucial significance of technology integration of BIM, XR, and DRX for construction progress monitoring based on DT. Sepasgozar [14] implemented the integration utilization of VR, AR, IoT, and DT, in education use for students to acquire knowledge of running construction…”
BackgroundMethodInfluentialSelf-citationVisualization technology-based construction safety management: A review
Guo, H., Yu, Y., & Skitmore, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.10.004 · Cited by 363 · cited 2×
“With these digital environments, immersive technologies can produce new ways of interaction, incenting multiuser collaborations, and interactive equipment handling for complete training before going to the site [105].”
BackgroundVirtual reality applications for the built environment: Research trends and opportunities
Zhang, Y., Liu, H., Kang, S.-C., & Al-Hussein, M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103311 · Cited by 361 · cited 2×
“AI-assisted VR systems will improve substantially to replicate the randomized behavior of humans in a cyber environment, creating applications where multiple users can interact in real-time with close to no delay [113].”
BackgroundWang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357 · cited 4×
“The standardization of VR and AR practices will be developed, establishing metrics to assess their effectiveness and manage their implementation in the project life cycle [25,62].”
BackgroundMethodInfluentialSelf-citationGuerra, B. C., & Leite, F. (2021) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2021.105617 · Cited by 349 · cited 2×
“…essential to CE accomplishment, the integration of both is still immature and needs further integrative application frameworks and business models [148 The application of digital technologies can be fruitful at different stages of CE cycle resource strategies, namely Regenerate, Narrow, Slow, and…”
BackgroundMethodBuilding information modelling (BIM) for sustainable building design
Wong, K., & Fan, Q. (2013) · Facilities · doi:10.1108/02632771311299412 · Cited by 349 · cited 1×
“The sustainability concern for information modeling occupies important status in the future of construction [88,89].”
BackgroundA Review of 3D Printing in Construction and its Impact on the Labor Market
Hossain, M. A., Zhumabekova, A., Paul, S. C., & Kim, J. R. (2020) · Sustainability · doi:10.3390/su12208492 · Cited by 319 · cited 1×
“Using 3D printing as a backdrop, it can perform automatically, proficiently, more flexibly, and has strong mechanical properties, among others [123,124].”
MethodDigitisation in facilities management: A literature review and future research directions
Wong, J. K. W., Ge, J., & He, S. X. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.04.006 · Cited by 307
A framework for integrating BIM and IoT through open standards
Dave, B., Buda, A., Nurminen, A., & Främling, K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.022 · Cited by 284
Ghosh, A., Edwards, D. J., & Hosseini, M. R. (2020) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-04-2020-0271 · Cited by 275 · cited 2×
“The emerging 5G network integrated with edge cloud computing technologies presents an evolutionary path to XR’s based on the cloud [11,129].”
BackgroundSepasgozar, S. M. E. (2020) · Applied Sciences · doi:10.3390/app10134678 · Cited by 266 · cited 4×
“This mega-trend of advancing digital technologies and innovative solutions during the pandemic gives some hope to the construction industry that surviving COVID-19 may lead to an increase in productivity in the future [10].”
BackgroundMethodInfluentialSelf-citationNnaji, C., & Karakhan, A. A. (2020) · Journal of Building Engineering · doi:10.1016/j.jobe.2020.101212 · Cited by 254 · cited 2×
“Exoskeletons provide a shell covering on the wearer’s body to allow enhanced strength and endurance during arduous tasks [136].”
BackgroundArtificial intelligence in green building
Debrah, C., Chan, A. P. C., & Darko, A. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104192 · Cited by 250 · cited 1×
“For instance, For instance, in a recent study, Debrah et al. [23] reviewed Cluster one in in a recent study, Debrah et al. [23] reviewed for sustainable construction sustainable sustainability develop a proof sustainability in AI in green buildings.”
BackgroundEnabling a circular economy in the built environment sector through blockchain technology
Shojaei, A., Ketabi, R., Razkenari, M., Hakim, H., & Wang, J. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.126352 · Cited by 244 · cited 1×
“Due to this, professionals in the construction industry have found it hard to execute the theoretical principles of CE in original construction projects [147].”
BackgroundComparative analysis of modular construction practices in mainland China, Hong Kong and Singapore
Xu, Z., Zayed, T., & Niu, Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118861 · Cited by 242
Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction
Li, X., Lu, W., Xue, F., Wu, L., Zhao, R., Lou, J., & Xu, J. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002229 · Cited by 241 · cited 1×
“Li et al. [33] proposed a service-oriented BCT-enabled IoT-BIM platform (BIBP) in modular construction supply chain management.”
BackgroundDarko, A., Chan, A. P. C., Yang, Y., & Tetteh, M. O. (2020) · Computers in Industry · doi:10.1016/j.compind.2020.103327 · Cited by 240 · cited 1×
“BIM models include information about the building’s de-sign, construction, and operation and can be used for a variety of purposes, such as design coordination, construction planning, and facility management [16].”
BackgroundSaieg, P., Sotelino, E. D., Nascimento, D., & Caiado, R. G. G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.11.030 · Cited by 237 · cited 3×
“Saieg et al. [92] presented a literature review about the integration of BIM, Lean thinking of construction, and sustainability, especially in decision-making.”
BackgroundInfluentialDevelopment of BIM, IoT and AR/VR technologies for fire safety and upskilling
Chen, H., Hou, L., Zhang, G. (., & Moon, S. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103631 · Cited by 235 · cited 1×
“Some of these projects aim to resolve long-lasting risks associated with the industry, such as site injuries [66,104], inspection and maintenance [60], fire safety awareness [61], and overall accident reduction [105].”
BackgroundAlizadehsalehi, S., & Yitmen, I. (2023) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-01-2021-0016 · Cited by 227 · cited 6×
“Sepehr et al. [77] emphasized the crucial significance of technology integration of BIM, XR, and DRX for construction progress monitoring based on DT. Sepasgozar [14] implemented the integration utilization of VR, AR, IoT, and DT, in education use for students to acquire knowledge of running…”
BackgroundInfluentialBlockchain technology and BIM process: review and potential applications
Nawari, N. O., & Ravindran, S. (2019) · Journal of Information Technology in Construction · Cited by 219
BIM-enabled computerized design and digital fabrication of industrialized buildings: A case study
He, R., Li, M., Gan, V. J. L., & Ma, J. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.123505 · Cited by 210
Hussein, M., Eltoukhy, A. E. E., Karam, A., Shaban, I. A., & Zayed, T. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.127503 · Cited by 209
BIM for facilities management: A framework and a common data environment using open standards
Patacas, J., Dawood, N., & Kassem, M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103366 · Cited by 199 · cited 1×
“LBD refers to using ontology or semantic web technologies for building data in the form of RDF graphs [85].”
MethodA study of literature in modular integrated construction - Critical review and future directions
Abdelmageed, S., & Zayed, T. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.124044 · Cited by 190 · cited 2×
“The concept of off-site prefabrication has been around for several hundred years [46], and it was an essential element of the British colonial project, for example.”
BackgroundMannino, A., Dejaco, M. C., & Re Cecconi, F. (2021) · Applied Sciences · doi:10.3390/app11073062 · Cited by 188 · cited 2×
“In addition, the combined effect of BIM and AIoT in light of fast networks will facilitate the actualization of smart cities and infrastructure within the construction industry in the future [69].”
BackgroundBig data architecture for construction waste analytics (CWA): A conceptual framework
Bilal, M., Oyedele, L. O., Akinade, O. O., Ajayi, S. O., Alaka, H. A., Owolabi, H. A., Qadir, J., Pasha, M., & Bello, S. A. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2016.03.002 · Cited by 181 · cited 1×
“The construction industry’s current processes, products, and business models are responsible for depleting an enormous amount of energy, virgin materials, greenhouse gases, landfill wastes, and non-biodegradable yields, among other potential threats [146].”
BackgroundBIM security: A critical review and recommendations using encryption strategy and blockchain
Das, M., Tao, X., & Cheng, J. C. P. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103682 · Cited by 181
Digital Twin Research in the AECO-FM Industry
Ozturk, G. B. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102730 · Cited by 180 · cited 2×
“It must be autonomous in nature to maximize the gains from the digital twin, including AI techniques, machine learning, and deep learning models to process the data, enabling it to generate new knowledge and insights [78,82].”
BackgroundNiu, Y., Lu, W., Chen, K., Huang, G. G., & Anumba, C. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000550 · Cited by 180
Li, C. Z., Zhao, Y., Xiao, B., Yu, B., Tam, V. W. Y., Chen, Z., & Ya, Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121458 · Cited by 175
Teisserenc, B., & Sepasgozar, S. (2021) · Buildings · doi:10.3390/buildings11120670 · Cited by 171 · cited 2×
“Recent advances in distributed ledger technologies (DLT), also called blockchain technology (BCT) prove to be a solution to these challenges [30].”
BackgroundSelf-citationNawari, N., & Ravindran, S. (2019) · Buildings · doi:10.3390/buildings9060149 · Cited by 169
Significant roles of 4D printing using smart materials in the field of manufacturing
Haleem, A., Javaid, M., Singh, R. P., & Suman, R. (2021) · Advanced Industrial and Engineering Polymer Research · doi:10.1016/j.aiepr.2021.05.001 · Cited by 166
Khan, A. A., Sepasgozar, S. M. E., Liu, T., & Yu, R. (2021) · Buildings · doi:10.3390/buildings11030126 · Cited by 166 · cited 6×
“Researchers have carried out SWOT analyses for immersive technologies, identifying these major impacts on stakeholders, design analysis, construction planning, facilities management, and education/training [22].”
BackgroundMethodInfluentialSelf-citationBIM compatibility and its differentiation with interoperability challenges as an innovation factor
Shirowzhan, S., Sepasgozar, S. M. E., Edwards, D. J., Li, H., & Wang, C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103086 · Cited by 164
Self-citationBIM-based augmented reality inspection and maintenance of fire safety equipment
Chen, Y.-J., Lai, Y.-S., & Lin, Y.-H. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103041 · Cited by 160 · cited 3×
“Some of these projects aim to resolve long-lasting risks associated with the industry, such as site injuries [66,104], inspection and maintenance [60], fire safety awareness [61], and overall accident reduction [105].”
BackgroundInsights into Blockchain Implementation in Construction: Models for Supply Chain Management
Tezel, A., Febrero, P., Papadonikolaki, E., & Yitmen, İ. (2021) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000939 · Cited by 160 · cited 1×
“…the effectiveness of BCT in the construction industry, especially in generating BIM-integrated smart contracts, information sharing in onsite assembly tasks of modular construction, BIM-BCT-based design collaboration issues, reducing construction disputes, and integrated project delivery [32].”
BackgroundTowards next generation cyber-physical systems and digital twins for construction
Akanmu, A. A., Anumba, C. J., & Ogunseiju, O. O. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.027 · Cited by 159 · cited 4×
“It must be autonomous in nature to maximize the gains from the digital twin, including AI techniques, machine learning, and deep learning models to process the data, enabling it to generate new knowledge and insights [78,82].”
BackgroundMethodInfluentialCyber physical system for safety management in smart construction site
Jiang, W., Ding, L., & Zhou, C. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-10-2019-0578 · Cited by 156
Niu, S., Pan, W., & Zhao, Y. (2016) · Sustainable Cities and Society · doi:10.1016/j.scs.2016.03.010 · Cited by 154 · cited 1×
“In addition, the characterization of a green façade with laser scanners [109], offsite data capturing of assemblies with DTs [54], facilities management with AR/MR approaches [56], and behavioral analysis of occupants with VR [110] have represented examples of data extraction and interpretation.”
BackgroundThe dark corners of industry 4.0 – Grounding economic governance 2.0
Kovács, O. (2018) · Technology in Society · doi:10.1016/j.techsoc.2018.07.009 · Cited by 152 · cited 1×
“11 of 34 On that basis, academics such as Oti-Sarpong et al.[41], and Kovacs [51] rightly call for an incremental yet expeditious approach to reform, and the old adage, “festina lente” (dili-gent haste) may serve as a useful touchstone.”
BackgroundHow methodological frameworks are being developed: evidence from a scoping review
McMeekin, N., Wu, O., Germeni, E., & Briggs, A. (2020) · BMC Medical Research Methodology · doi:10.1186/s12874-020-01061-4 · Cited by 140 · cited 3×
“The most influential journals are AiC, ECAM, Buildings, CI, and JCLP, and they are some of the highest-ranked journals in the AEC and construction and engineering management (CEM) research areas [20].”
BackgroundMethodInfluentialImage-Based Technologies for Constructing As-Is Building Information Models for Existing Buildings
Lu, Q., & Lee, S. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000652 · Cited by 140 · cited 2×
“Future immersive technologies will be integrated with other applications to create meaningful results, such as more realistic scenarios through cloud points, lower latency with 5G signals, data processing automation with machine learning, and site analyses with DTs [12,73].”
BackgroundA review of the circularity gap in the construction industry through scientometric analysis
Antwi-Afari, P., Ng, S. T., & Hossain, M. U. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.126870 · Cited by 136 · cited 1×
“The linear economy method of take-make-dispose is the culprit as around 100 billion tons of material is consumed annually, which is estimated to reach around 170–184 billion tons in the year 2050 if the businesses tend to run in a typical and traditional manner [143].”
MethodIdentifying the Challenges to Adopting Robotics in the US Construction Industry
Pradhananga, P., ElZomor, M., & Kasabdji, G. S. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002007 · Cited by 136 · cited 2×
“Studies related to application metrics of the exoskeletons are required that can provide a detailed explanation of factors such as ease of use, comfortabil-ity, investment willingness, and implantation guidelines, among others [135].”
BackgroundZhu, J., Wang, X., Chen, M., Wu, P., & Kim, M. J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102859 · Cited by 135 · cited 1×
“BIM and GIS: IFC geometry transformation [75] To realize efficient data exchange for the integration of BIM and GIS, this work enhances the open-source approach (E-OSA), by developing an automatic multipitch generation (E-AMG) algorithm.”
MethodImproving construction safety with virtual-design construction technologies – a review
Afzal, M., Shafiq, M. T., & Jassmi, H. A. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.018 · Cited by 135 · cited 4×
“This needs better financial impact analyses to suit tight project deadlines and specifica-tions [103,104].”
BackgroundInfluentialA review of integrated applications of BIM and related technologies in whole building life cycle
Meng, Q., Zhang, Y., Li, Z., Shi, W., Wang, J., Sun, Y., Xu, L., & Wang, X. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-09-2019-0511 · Cited by 135
The hype factor of digital technologies in AEC
Bosch‐Sijtsema, P. M., Claeson-Jonsson, C., Johansson, M., & Roupé, M. (2021) · Construction Innovation · doi:10.1108/ci-01-2020-0002 · Cited by 133 · cited 7×
“However, there are currently many ambiguities and a lack of investigation into future directions and what construction workers should expect in the latter half of the 21st century [12].”
BackgroundMethodInfluentialUsing virtual reality to facilitate communication in the AEC domain: a systematic review
Wen, J., & Gheisari, M. (2020) · Construction Innovation · doi:10.1108/ci-11-2019-0122 · Cited by 128 · cited 1×
“AI and multiuser applications will be developed to create new ways of interaction, enhancing training and learning processes with the aid of VR [113,127].”
BackgroundBIM2MAR: An Efficient BIM Translation to Mobile Augmented Reality Applications
Williams, G., Gheisari, M., Chen, P.-J., & Irizarry, J. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000315 · Cited by 127
State-of-the-Art Review on Mixed Reality Applications in the AECO Industry
Cheng, J. C. P., Chen, K., & Chen, W. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001749 · Cited by 123 · cited 1×
“The contribution of new technologies, such as remote-control machines and survey-collecting systems, will transform how data is managed, implementing cloud elements to visualize it in real-time with the aid of 5G signals [128].”
BackgroundCybersecurity for digital twins in the built environment: current research and future directions
Alshammari, K., Beach, T., & Rezgui, Y. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.010 · Cited by 122 · cited 1×
“DT provides a penitential realization of CPSs, on the scale of monitoring, simulation, optimization, and prediction [80].”
BackgroundReview and analysis of augmented reality (AR) literature for digital fabrication in architecture
Song, Y., Koeck, R., & Luo, S. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103762 · Cited by 120 · cited 1×
“This involves the creation of protocols to test the quality of simulations, reviewing and optimizing them to increase processing data and thus reducing hardware expenses with smarter AI algorithms [114,115].”
MethodA BIM and machine learning integration framework for automated property valuation
Su, T., Li, H., & An, Y. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102636 · Cited by 116 · cited 1×
“BIM and machine learning integration [76] To improve information exchange for AEC projects and leverage data interpretation, the work proposed a system for property valuation.”
MethodSelf-citationOlanrewaju, O. I., Kineber, A. F., Chileshe, N., & Edwards, D. J. (2021) · Sustainability · doi:10.3390/su13168887 · Cited by 116
Shi, Y., & Xu, J. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103611 · Cited by 114 · cited 1×
“Construction and demolition waste (CDW) is thus a very important topic as the proper information system establishment for reducing CDW could decrease environmental damage [90,91].”
BackgroundLiu, G., Yang, H. M., Fu, Y., Mao, C., Xu, P., Hong, J., & Li, R. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119059 · Cited by 109 · cited 1×
“Investigations were done with the application of installation control for prefabricated modules, risk control of blind hoists, safety management, and so on [82–84].”
MethodTeisserenc, B., & Sepasgozar, S. M. E. (2021) · Buildings · doi:10.3390/buildings11120626 · Cited by 109 · cited 1×
“BCT’s expected benefits are increased collaboration, disintermediation, quick immutable process, low human error, traceability and provenance, and workflow improvements, among others [31].”
BackgroundSelf-citationMarocco, M., & Garofolo, I. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103917 · Cited by 108 · cited 2×
“Additional explorations are also proposed regarding cloud points and software processing optimization, such as DTs, AI, IoT, ML, and cognitive computing processes [77,111].”
BackgroundAlaloul, W. S., Qureshi, A. H., Musarat, M. A., & Saad, S. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102877 · Cited by 104 · cited 6×
“Finally, empirical experience and professional expertise will be fundamental inputs for realistic VR prototype implementations, integrating the information with high-detail cloud points obtained from photogrammetry and laser scanning [60,103].”
BackgroundMethodInfluentialCharef, R., Lu, W., & Hall, D. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.132421 · Cited by 99
Factors Affecting 3D Printing Technology Adaptation in Construction
Besklubova, S., Skibniewski, M. J., & Zhang, X. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002034 · Cited by 97 · cited 1×
“Using 3D printing as a backdrop, it can perform automatically, proficiently, more flexibly, and has strong mechanical properties, among others [123,124].”
MethodBuilding Information Modelling for Smart Built Environments
Zhang, J., Seet, B., & Lie, T. T. (2015) · Buildings · doi:10.3390/buildings5010100 · Cited by 92
Malagnino, A., Montanaro, T., Lazoi, M., Sergi, I., Corallo, A., & Patrono, L. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.127716 · Cited by 90
Transforming the construction sector: an institutional complexity perspective
Oti‐Sarpong, K., Parn, E. A., Burgess, G., & Zaki, M. (2021) · Construction Innovation · doi:10.1108/ci-04-2021-0071 · Cited by 87 · cited 2×
“11 of 34 On that basis, academics such as Oti-Sarpong et al.[41], and Kovacs [51] rightly call for an incremental yet expeditious approach to reform, and the old adage, “festina lente” (dili-gent haste) may serve as a useful touchstone.”
BackgroundCONCEPTUAL FRAMEWORK FOR INTEGRATING BIM AND AUGMENTED REALITY IN CONSTRUCTION MANAGEMENT
Machado, R. L., & Vilela, C. A. D. C. (2020) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2020.11803 · Cited by 85 · cited 3×
“Future research gaps are integration interoperability solutions, standardization, model processing, data exchange etc. BIM and AR [72] The methods adopted in data capture for building site construction are fiducial markers, GIS, GPS, laser scanning, and photogrammetry.”
MethodGheisari, M., & Irizarry, J. (2016) · Facilities · doi:10.1108/f-04-2014-0040 · Cited by 84
Shkundalov, D., & Vilutienė, T. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103757 · Cited by 83
Impact of COVID-19 on Construction Projects: The Case of India
Rani, H. A., Farouk, A. M., Anandh, K. S., Almutairi, S., & Rahman, R. A. (2022) · Buildings · doi:10.3390/buildings12060762 · Cited by 82
BIM-Based Tools for Managing Construction and Demolition Waste (CDW): A Scoping Review
Nikmehr, B., Hosseini, M. R., Wang, J., Chileshe, N., & Rameezdeen, R. (2021) · Sustainability · doi:10.3390/su13158427 · Cited by 78
Shan, M., Hwang, B., & Zhu, L. (2017) · Sustainability · doi:10.3390/su9122347 · Cited by 78 · cited 1×
“Decades of debate, subsidies, and all manner of financial incentives [42] have failed to produce the kind of efficient allocation of resources needed to avert disaster because the construction industry has, for centuries, evolved as a project-based economy that is, ironically, extremely sensitive to…”
BackgroundA Systematic Review of Architectural Design Collaboration in Immersive Virtual Environments
Yu, R., Gu, N., Lee, G., & Khan, A. A. (2022) · Designs · doi:10.3390/designs6050093 · Cited by 75 · cited 1×
“From BIM 4D planning to integrating extended realities (XR) such as virtual reality (VR), augmented reality (AR), and mixed reality (MR), the tasks at different stages of a construction project have improved holistically [35].”
BackgroundSelf-citationSepasgozar, S. M. E., Ghobadi, M., Shirowzhan, S., Edwards, D. J., & Delzendeh, E. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-10-2020-0880 · Cited by 73 · cited 1×
“All these aspects are paramount to achieving the vision researchers have about the future of immersive technologies, putting an emphasis on the cultural background of stakeholders to suit their individual needs for an effective adoption in the AEC industry [116].”
BackgroundSelf-citationKhan, A. A., Yu, R., Liu, T., Guan, H., & Oh, E. (2022) · Buildings · doi:10.3390/buildings12050637 · Cited by 73 · cited 1×
“Further, the rise in sustainable construction methods, such as offsite and modular integrated construction, was seen in developing and developed countries to culminate in affordable housing issues [24].”
BackgroundSelf-citationFactors affecting BIM implementation: evidence from countries with different income levels
Al-Mohammad, M. S., Haron, A. T., Esa, M. B., Aloko, M. N., Alhammadi, Y., Anandh, K. S., & Rahman, R. A. (2022) · Construction Innovation · doi:10.1108/ci-11-2021-0217 · Cited by 68 · cited 1×
“The BIM models can be used throughout the entire building lifecycle, from the design phase to the construction phase, to the operation and maintenance phase of a building [17].”
MethodRausch, C., Lu, R., Talebi, S., & Haas, C. T. (2021) · International Journal of Construction Management · doi:10.1080/15623599.2021.1896942 · Cited by 66 · cited 2×
“In addition, the characterization of a green façade with laser scanners [109], offsite data capturing of assemblies with DTs [54], facilities management with AR/MR approaches [56], and behavioral analysis of occupants with VR [110] have represented examples of data extraction and interpretation.”
BackgroundMethodSepasgozar, S. M. E. (2020) · Construction Innovation · doi:10.1108/ci-02-2020-0020 · Cited by 59 · cited 5×
“The future of the AEC industry depends on disruptive technologies due to rapid growth in digitization and digitalization of the industry [2].”
BackgroundMethodInfluentialSelf-citationEngineering Brain: Metaverse for future engineering
Wang, X., Wang, J., Wu, C., Xu, S., & Ma, W. (2022) · AI in Civil Engineering · doi:10.1007/s43503-022-00001-z · Cited by 56 · cited 4×
“In a recent study, Wang et al. [130] proposed three aspects that will govern the Metaverse’s suitability in the AEC industry, namely “intelligent combination of smart technologies”, “intelligent recognition reasoning and decision making based on knowledge graphs”, and “multi-machine…”
BackgroundInfluentialUse of augmented reality technology to enhance comprehension of construction assemblies
Bademosi, F. M., Blinn, N., & Issa, R. R. A. (2019) · Journal of Information Technology in Construction · Cited by 52
Manzoor, B., Othman, I., Kang, J., & Geem, Z. W. (2021) · Applied Sciences · doi:10.3390/app11167626 · Cited by 50 · cited 1×
“Construction and demolition waste (CDW) is thus a very important topic as the proper information system establishment for reducing CDW could decrease environmental damage [90,91].”
BackgroundGovernance, Standards and Regulation: What Construction and Mining Need to Commit to Industry 4.0
Smith, K. I., & Sepasgozar, S. M. E. (2022) · Buildings · doi:10.3390/buildings12071064 · Cited by 45 · cited 1×
“…Industrial Revolution objectives instead of its socio-political objectives or the regulatory means to achieve them, which is understandable given the concept’s high-tech Furthermore, even in Germany, the concept has achieved only modest penetration in the construction sector thus far. appeal [49].”
BackgroundSelf-citationVentura, S. M., Castronovo, F., & Ciribini, A. L. C. (2020) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2020.014 · Cited by 43 · cited 1×
“This involves the creation of protocols to test the quality of simulations, reviewing and optimizing them to increase processing data and thus reducing hardware expenses with smarter AI algorithms [114,115].”
MethodVirtual generative BIM workspace for maximising AEC conceptual design innovation
Abrishami, S., Goulding, J. S., Rahimian, F. P., & Ganah, A. A. (2015) · Construction Innovation · doi:10.1108/ci-07-2014-0036 · Cited by 43
Teisserenc, B., & Sepasgozar, S. M. E. (2022) · Buildings · doi:10.3390/buildings12091447 · Cited by 41 · cited 2×
“While BIM is considered a “single source of truth” for geometrical and non-geometrical information in the construction industry, DT is perceived as a “single version of the truth” encompassing BIM’s physical and dynamic representation, particularly with the integration of blockchain [15].”
BackgroundSelf-citationHirsch, P. B. (2021) · Journal of Business Strategy · doi:10.1108/jbs-08-2021-0141 · Cited by 29 · cited 1×
“…industry services in any given economy, will also seek to enhance productivity in terms of the economy’s ability to optimally use scarce resources [40] by adjusting public policy settings, creating tax incentives to adopt technology, directing resources to the education system, and funding…”
BackgroundBig data in building design: a review
Loyola, M. (2018) · Journal of Information Technology in Construction · Cited by 28
3D characterization of a Boston Ivy double-skin green building facade using a LiDAR system
Pérez, G., Escolà, A., Rosell-Polo, J. R., Coma, J., Arasanz, R., Marrero, B., Cabeza, L. F., & Gregorio, E. (2021) · Building and Environment · doi:10.1016/j.buildenv.2021.108320 · Cited by 28 · cited 1×
“In addition, the characterization of a green façade with laser scanners [109], offsite data capturing of assemblies with DTs [54], facilities management with AR/MR approaches [56], and behavioral analysis of occupants with VR [110] have represented examples of data extraction and interpretation.”
BackgroundYi, H. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2021-0428 · Cited by 23 · cited 1×
“However, a recent study by Hwang Yi [126] implemented 4D printing to develop a prototype of a parametric smart façade that can acquire self-shaping skin and could be significant in adaptive building design and construction.”
BackgroundTowards the implementation of immersive technology in construction – a SWOT Analysis
Gontier, J. C., Wong, P. S. P., & Teo, P. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.020 · Cited by 17 · cited 2×
“Strengths such as better perception and productivity are also mentioned, highlighting weaknesses due to hardware limitations and field usability of immersive headsets [112].”
BackgroundSemantic Data Management for a Virtual Factory Collaborative Environment
Nazarenko, A. A., Sarraipa, J., Camarinha-Matos, L. M., Garcia, O., & Jardim‐Gonçalves, R. (2019) · Applied Sciences · doi:10.3390/app9224936 · Cited by 13 · cited 1×
“It is also worth noting that semantics and ontology are the fundamental concepts for the DT and CPS, which could provide dynamic data flows at different scales [18,87].”
BackgroundLightweight Neural Networks-Based Safety Evaluation for Smart Construction Devices
Wang, G., & Zhou, J. (2022) · Computational Intelligence and Neuroscience · doi:10.1155/2022/3192552 · Cited by 3 · cited 1×
“Conventionally, it can be regarded ashuman–machine interaction and collaboration to streamline construction tasks and operations [140].”
Background
Metadata
- Authors
- Sepasgozar, S., Khan, A., Smith, K., Romero, J., Shen, X., Shirowzhan, S., Li, H., & Tahmasebinia, F.
- Venue
- Buildings
- Publisher
- MDPI AG
- Published
- 2023-02-04
- Volume
- 13
- Issue
- 2
- Pages
- 441
- ISSN
- 2075-5309 (ISSN-L)
- OpenAlex
- W4319316047
- Cited by
- 162
- References
- 109
- FWCI
- 19.40
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.