Real-Time Analysis of Time-Critical Messages in IEC 61850 Electrical Substation Communication Systems
Open accessThe DOI matches its Crossref record; 28 of the 31 references it cites were found in a registry or an index; 4 of the 35 sources its claims cite were checked for support.
Abstract
IEC 61850 is a standard for the design and operation of electrical Substation Automation Systems (SAS) that defines how data may be transferred among Intelligent Electronic Devices (IEDs). The defined data models can be mapped into application protocols, such as SV or GOOSE, which may run upon high speed Ethernet LANs bridged by IEEE 802.1Q compliant switches. The communication system must cope with the timing requirements associated to protective relaying strategies. Given the time constrained nature of SAS applications, a thorough analysis of its timing behavior is required. In this paper, we propose an analytical model for the timing assessment of SV and GOOSE message exchanges in an IEC 61850 process bus. The proposed model allows the communication timing assessment, by analyzing the response time of each message stream of the SAS. This feature is an advantage for the expansion of the SAS, as it allows the evaluation at design time of the maximum number of IEDs that can be supported by the underlying communication system. The results from the proposed analytical model were validated for a typical IEC 61850 communication scenario, both through simulation and through an experimental assessment with IEC 61850 compliant equipment.
Overview
CoChat Summary
## TL;DR
The paper proposes a worst-case response-time analysis for IEC 61850 process-bus SV and GOOSE message streams in substation automation systems, using fixed-priority real-time scheduling ideas. It validates the model against simulation and an experimental IEC 61850 setup, and then extends it to higher-load and 1 Gbps scenarios.
## Key findings
- For the T1-1 case study at 100 Mbps, the analytical model found worst-case response times of 26.92 µs (T7), 40.68 µs (T6), 54.44 µs (T5), and 54.44 µs (T4), and concluded the set is schedulable because Ri ≤ Di for all streams.
- Simulation for the same scenario gave maximum response times of 25.38 µs, 25.92 µs, 37.92 µs, and 38.4 µs for T7, T6, T5, T4, respectively; the paper says the analytical results are slightly longer, as expected for worst-case analysis.
- In the experimental assessment, the maximum end-to-end delays were 26.50 µs, 26.00 µs, 39.80 µs, and 38.50 µs, and the analytical model differed by 1.54 µs, 2.60 µs, 2.76 µs, and 2.28 µs from those measurements.
- For scalability, a utilization-based necessary test suggested the system is not schedulable for more than 17 MUs, while response-time analysis showed the system is not feasible with 17 MUs but feasible with 16 MUs; for 16 MUs, the paper reports R4 = 625.96 µs and total utilization U = 0.94.
## Methods
- The paper builds a worst-case response-time analysis for IEC 61850 process-bus communications by mapping message streams to non-preemptive fixed-priority real-time tasks and using Rate Monotonic (RM) priority assignment.
- The main case study is the T1-1 substation with 100 Mbps Ethernet, 3 bays, 1 MU per bay, and 3 P&C devices per bay; message parameters are taken from the case study tables, with SV modeled as periodic and GOOSE modeled as sporadic but treated as periodic with 31,000 µs period.
- The analytical model is checked against a simulation model in OMNeT++/INET and a physical experimental setup using IEC 61850-compliant equipment; Section 6 extends the analysis to PTP background traffic and 1 Gbps links.
## Limitations
- The paper states that utilization-based tests are only “necessary but not sufficient” and can be too optimistic, because they cannot determine the exact maximum number of MUs or confirm schedulability at the upper bound.
- The authors note that analytical results are slightly longer/pessimistic than simulation and experiments; this is stated in the paper as expected because simulation and prototypes may be optimistic.
- Evident from the text: the main case study assumes no background traffic in the baseline analysis and uses a simplified model that treats GOOSE as periodic, which the paper itself describes as pessimistic.
Model-written summary. Check it against the paper before relying on it.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
3 Valid · 5 Not valid · 12 Not checked · 54 Own results and interpretations
The sources with a verdict support this claim; the rest weren’t checked yet, have no full text we could read, or their verdicts aren’t rated yet.
In the paper
“In this paper is presented an analytical assessment tool that is based on legacy response time analysis research works [3-6] previously proposed for the analysis of CAN (Controller Area Network) communication.”
What the sources say
- Not checked — no full text of the sourcecites [3] Tindell, K.W., Hansson, H., and Wellings, A.J. (1994, January 7–9). Analysing real-time communications: Controller area network (CAN). Proceedings of the Real-Time Systems Symposium, San Juan, Puerto Rico. source
- Not checked — no full text of the sourcecites [4] Pinho, L.M., and Vasques, F. (2001, January 13–15). Timing Analysis of Reliable Real-Time Communication in CAN Networks. Proceedings of the IEEE Computer Society 13th Euromicro Conference on Real-Time Systems, Delft, The Netherlands. source
- Supportedcites [5] Davis, 2007, Controller Area Network (CAN) schedulability analysis: Refuted, revisited and revised, Real Time Syst. source
Section 3 (p. 12) sets out response-time analysis for CAN messages, and the Summary (p. 30) says this paper provides revised analysis for calculating their worst-case response times. It therefore fits the cited role of prior CAN response-time analysis research; the source need not describe the citing authors’ tool. (LLM, conf=0.90)
- Not checked — no full text of the sourcecites [6] Carreiro, F.B., Moraes, R., Fonseca, J.A., and Vasques, F. (2005, January 19–22). Real-time communication in unconstrained shared Ethernet networks: The virtual token-passing approach. Proceedings of the 2005 IEEE Conference on Emerging Technologies and Factory Automation, Catania, Italy. source
plainstates a cause- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
The sources with a verdict support this claim; the rest weren’t checked yet, have no full text we could read, or their verdicts aren’t rated yet.
In the paper
“The response time analysis for a non-preemptive fixed-priority system, as proposed in [3-5], can be adapted to estimate the maximum response time of message exchanges in an IEC 61850 process bus communication system Equation (1).”
What the sources say
- Not checked — no full text of the sourcecites [3] Tindell, K.W., Hansson, H., and Wellings, A.J. (1994, January 7–9). Analysing real-time communications: Controller area network (CAN). Proceedings of the Real-Time Systems Symposium, San Juan, Puerto Rico. source
- Not checked — no full text of the sourcecites [4] Pinho, L.M., and Vasques, F. (2001, January 13–15). Timing Analysis of Reliable Real-Time Communication in CAN Networks. Proceedings of the IEEE Computer Society 13th Euromicro Conference on Real-Time Systems, Delft, The Netherlands. source
- Supportedcites [5] Davis, 2007, Controller Area Network (CAN) schedulability analysis: Refuted, revisited and revised, Real Time Syst. source
Section 3 (p. 12) states that CAN implements fixed-priority, non-preemptive message scheduling and presents an analysis for calculating worst-case message response times. The citation supports the identification of that analysis; the citing authors present its adaptation to an IEC 61850 process bus as their own proposal. (LLM, conf=0.90)
plainstates a possible cause- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“The performed comparison highlights its ability to map real IEC 61850 implementations.”
plainstates an association- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“it was obtained in the simulator the maximum measured response time of 37.92 µ s.”
plainSingle case- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper states — it cites no source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“Similarly, for a GOOSE message of 160 bytes, this calculation results in Ci = 13.76 µ s.”
plain- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
35 more claims
Create a free account to see all 74 claims and to verify the 1 reference still open.
- Probably not a substantial claim. 23
- It may state two separate claims as one. 12
- The quote only partly states this claim. 3
Citations
Cites
Controller Area Network (CAN) schedulability analysis: Refuted, revisited and revised
Davis, R. I., Burns, A., Bril, R. J., & Lukkien, J. J. (2007) · Real-Time Systems · doi:10.1007/s11241-007-9012-7 · Cited by 786 · cited 3×
“It is well-known that there is no optimal priority assignment policy when the system is non-preemptive and the tasks have arbitrary deadlines (deadlines that can be greater than the periods) [5].”
BackgroundMethodInfluentialAnalysing real-time communications: controller area network (CAN)
Tindell, Hansson, & Wellings (1994) · Proceedings Real-Time Systems Symposium REAL-94 · doi:10.1109/real.1994.342710 · Cited by 427 · cited 3×
“In the timeline, it is also assumed the critical instant concept [3], where all streams ( T 7 , T 6 , T 5 and T 4 ) are simultaneously released at time instant 0.”
BackgroundMethodInfluentialOverview of IEC 61850 and Benefits
Mackiewicz, R. E. (2006) · 2006 IEEE PES Power Systems Conference and Exposition · doi:10.1109/psce.2006.296392 · Cited by 160
Reliability Modeling and Analysis of IEC 61850 Based Substation Protection Systems
Lei, H., Singh, C., & Sprintson, A. (2014) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2014.2314616 · Cited by 110 · cited 1×
“The IEC 61850 standard defines a networking architecture for SAS with three automation levels—station, bay and process—connected through two communication buses (Figure 1) [8,10,11].”
BackgroundCommunication networks and systems in substations
(2004) · doi:10.3403/03052127 · Cited by 93
Real-Time Co-Simulation Platform for Smart Grid Volt-VAR Optimization Using IEC 61850
Manbachi, M., Sadu, A., Farhangi, H., Monti, A., Palizban, A., Ponci, F., & Arzanpour, S. (2016) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2016.2569586 · Cited by 92 · cited 1×
“Other works, as in [24], used the so-called Real-Time Digital Simulator (RTDS) to assess the behavior of SAS close to real situations.”
MethodAnalytical Modeling of Traffic Flow in the Substation Communication Network
Zhang, Y., Cai, Z., Li, X., et al. (2014) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2014.2377475 · Cited by 51 · cited 2×
“In [18], assuming a specific service model, a network calculus-based algorithm is proposed to evaluate the maximum delay of messages in an SAS communication bus.”
BackgroundMethodSystem-Level Tests of Transformer Differential Protection Using an IEC 61850 Process Bus
Ingram, D. M. E., Schaub, P., Taylor, R., et al. (2014) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2013.2291789 · Cited by 47 · cited 1×
“In [23], electrical signal generators, IED emulators and network traffic capture boards were used to study the interaction between time synchronization protocols and IEC 61850 communication protocols.”
MethodPerformance evaluation of time-critical communication networks for Smart Grids based on IEC 61850
Georg, H., Dorsch, N., Putzke, M., & Wietfeld, C. (2013) · IEEE Conference on Computer Communications Workshops (INFOCOM WKSHPS) · doi:10.1109/infcomw.2013.6562906 · Cited by 45
A Bounded Model of the Communication Delay for System Integrity Protection Schemes
Huang, C., Li, F. F., Ding, T., et al. (2016) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2016.2528281 · Cited by 44 · cited 3×
“However, as almost all above-mentioned works [13–15, 19, In this paper, we aim to explore the advantages of using a combination of these methodologies, in order to obtain a more accurate assessment of the messages’ timing behavior for different IEC 61850 based communication scenarios.”
BackgroundMethod
Cited by
Effects of Communication Signal Delay on the Power Grid: A Review
Muyizere, D., Letting, L. K., & Munyazikwiye, B. B. (2022) · Electronics · doi:10.3390/electronics11060874 · Cited by 54
A new delay attack detection algorithm for PTP network in power substation
Moradi, M., & Jahangir, A. H. (2021) · International Journal of Electrical Power & Energy Systems · doi:10.1016/j.ijepes.2021.107226 · Cited by 26
Automatic whitelist generation system for ethernet based in-vehicle network
Jo, W., Kim, S.-J., Kim, H., Shin, Y., & Shon, T. (2022) · Computers in Industry · doi:10.1016/j.compind.2022.103735 · Cited by 20
Tobar-Rosero, O. A., Roa, O., Carvajal, G., Leal, E. A., Botero, J. F., Gutiérrez, S. A., Branch, J. W., & Zapata, G. (2024) · Energies · doi:10.3390/en17236098 · Cited by 19
“In this section, we will outline the communication protocols used in the operation of DSs, according to the IEC 61850 standard [18,23].”
Design and Evaluation of a Low-Latency CPC Environment for Virtual IEDs
Carvalho, R., Antunes, M., Barraca, J. P., et al. (2022) · IEEE International Conference on Cloud Networking · doi:10.1109/cloudnet55617.2022.9978874 · Cited by 9
“A real-time analysis of IEC 61850 protocols in substation communication systems is presented in [6].”
Method
Metadata
- Authors
- León, H., Montez, C., Valle, O., & Vasques, F.
- Affiliations
- General Electric (United States) (US)
- Universidade Federal de Santa Catarina (BR)
- Instituto Federal de Educação, Ciência e Tecnologia de Santa Catarina (BR)
- Universidade do Porto (PT)
- Corresponding author
- Vasques, Francisco
- Venue
- Energies
- Publisher
- MDPI AG
- Published
- 2019-06-13
- Volume
- 12
- Issue
- 12
- Pages
- 2272
- ISSN
- 1996-1073 (ISSN-L)
- OpenAlex
- W2949864632
- Cited by
- 35
- References
- 31
- Citations by year
- 2026: 5 · 2025: 5 · 2024: 6 · 2023: 2 · 2022: 6 · 2021: 9 · 2020: 2
- FWCI
- 2.33
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Energies (publishedVersion, cc-by)
- RePEc: Research Papers in Economics (submittedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Funders
- Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES Print Program 698503P)
- Topics
- Physical Sciences › Computer Science › Computer Networks and Communications › Network Time Synchronization Technologies
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Power Systems and Technologies
- Physical Sciences › Computer Science › Hardware and Architecture › Real-Time Systems Scheduling
- Keywords
- IEC 61850, time-critical communication, geese, IEEE 802.1Q, Ethernet switches, power system protection, intelligent electronic devices, process bus
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
The claim verdicts this report counts are experimental: their accuracy is not yet measured.
A language model drew the claims from the paper on 2026-10-10, under version 3 of the claim definition (model deepseek-v4.1-flash, prompt extract-v3).
A second model labelled each claim on 2026-10-10 (model jev-1.13-20260917, definition revision gold-guideline-v0.2).
Cited sources are checked with a language model’s help (gpt-6-sol).
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Real-Time Analysis of Time-Critical Messages in IEC 61850 Electrical Substation Communication Systems. https://app.cochat.ai/papers/10.3390/en12122272
- The paper
- León, H., Montez, C., Valle, O., & Vasques, F. (2019). Real-Time Analysis of Time-Critical Messages in IEC 61850 Electrical Substation Communication Systems. Energies. https://doi.org/10.3390/en12122272
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.