Construction Industrialization (CI) tends to improve industrial performance and contributes substantially towards global sustainability. Considering these merits, many countries and regions, including Hong Kong, have released policies to promote CI uptake. However, those policy interventions ignore the dynamic influence of stakeholders and technologies, which significantly influence the efficient management of CI. In response, this study aimed to objectively depict a real socio-technical system of CI uptake based on a representative case study in Hong Kong. Further, this study identified the critical issues associated with the CI uptake and proposed policy-related recommendations to overcome the key issues. In addition, this study proposed a novel approach based on two-mode social network analysis to facilitate the analysis from a socio-technical perspective. Theoretically, this depicts the interactions of construction industry stakeholders and artifacts within a dynamic, complex socio-technical environment, indicating a new stance for construction management. Finally, this research also provides valuable implications for the government to anticipate the impact of different CI policies on promoting its uptake within the complex socio-technical system.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.3390/ijerph18179017

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

No references could be resolved yet.

Research works printed but not linked: 71

  1. Ekanayake, E., Shen, G.Q., Kumaraswamy, M., and Owusu, E.K. (2020). Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Eng. Constr. Arch. Manag. · DOI
  2. Xu, 2020, Comparative analysis of modular construction practices in mainland China, Hong Kong and Singapore, J. Clean. Prod., 245, 118861, 10.1016/j.jclepro.2019.118861 · DOI · Paper page
  3. Li, 2020, A new framework of industrialized construction in China: Towards on-site industrialization, J. Clean. Prod., 244, 118469, 10.1016/j.jclepro.2019.118469 · DOI
  4. Arif, 2010, Making a case for offsite construction in China, Eng. Constr. Arch. Manag., 17, 536, 10.1108/09699981011090170 · DOI
  5. Mak, Y.W. (1998). Prefabrication and Industrialization of Housing in Hong Kong. [Master’s Thesis, The Hong Kong Polytechnic University]. Available online: https://theses.lib.polyu.edu.hk/handle/200/3366.
  6. Luo, 2019, Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong, J. Manag. Eng., 35, 05018015, 10.1061/(ASCE)ME.1943-5479.0000675 · DOI · Paper page
  7. Seaden, 2001, Public policy and construction innovation, Build. Res. Inf., 29, 182, 10.1080/09613210010027701 · doi:10.1080/09613210010027701
  8. Mao, 2015, Major Barriers to Off-Site Construction: The Developer’s Perspective in China, J. Manag. Eng., 31, 04014043, 10.1061/(ASCE)ME.1943-5479.0000246 · DOI · Paper page
  9. Bijker, W.E., Hughes, T.P., and Pinch, T.J. (1987). The Social Construction of Technological Systems: New Directions in the Sociology and History of Technology, MIT Press.
  10. Xue, 2020, Influence of formal and informal stakeholder relationship on megaproject performance: A case of China, Eng. Constr. Arch. Manag., 27, 1505, 10.1108/ECAM-07-2019-0353 · DOI
  11. Geels, 2004, From sectoral systems of innovation to socio-technical systems: Insights about dynamics and change from sociology and institutional theory, Res. Policy, 33, 897, 10.1016/j.respol.2004.01.015 · DOI · Paper page
  12. Fang, 2006, Safety Climate in Construction Industry: A Case Study in Hong Kong, J. Constr. Eng. Manag., 132, 573, 10.1061/(ASCE)0733-9364(2006)132:6(573) · doi:10.1061/(asce)0733-9364(2006)132:6(573
  13. Schiffer, 2010, Net-map: Collecting social network data and facilitating network learning through participatory influence network mapping, Field Methods, 22, 231, 10.1177/1525822X10374798 · DOI · Paper page
  14. Meng, 2012, The effect of relationship management on project performance in construction, Int. J. Proj. Manag., 30, 188, 10.1016/j.ijproman.2011.04.002 · doi:10.1016/j.ijproman.2011.04.002
  15. Zakaria, 2018, Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: A review, Archit. Eng. Des. Manag., 14, 3
  16. Gan, 2018, Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis, J. Clean. Prod., 201, 735, 10.1016/j.jclepro.2018.07.299 · DOI · Paper page
  17. Masood, 2021, Performance of the supply chains for New Zealand prefabricated house-building, Sustain. Cities Soc., 64, 102537, 10.1016/j.scs.2020.102537 · DOI
  18. Luo, 2015, Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system a case study from China, Eng. Constr. Archit. Manag., 22, 622, 10.1108/ECAM-04-2014-0048 · DOI
  19. Wang, 2019, Attitude of the Chinese public toward off-site construction: A text mining study, J. Clean. Prod., 238, 117926, 10.1016/j.jclepro.2019.117926 · DOI
  20. Latour, B. (1987). Science in Action: How to Follow Scientists and Engineers through Society, Harvard University Press.
  21. Freeman, R.E. (2010). Two—The Stakeholder Concept and Strategic Management. Strategic Management: A Stakeholder Approach, Cambridge University Press. · DOI · Paper page
  22. Leonardi, 2012, Materiality, Sociomateriality, and Socio-Technical Systems: What Do These Terms Mean? How Are They Different? Do We Need Them?, Mater. Organ., 25, 24
  23. Ekbia, 2009, Digital artifacts as quasi-objects: Qualification, mediation, and materiality, J. Am. Soc. Inf. Sci. Technol., 60, 2554, 10.1002/asi.21189 · DOI · Paper page
  24. Schmidt, 2004, Ordering systems: Coordinative practices and artifacts in architectural design and planning, Comput. Support. Coop. Work, 13, 349, 10.1007/s10606-004-5059-3 · DOI · Paper page
  25. Parmaxi, 2016, Enacting artifact-based activities for social technologies in language learning using a design-based research approach, Comput. Hum. Behav., 63, 556, 10.1016/j.chb.2016.05.072 · DOI
  26. Mitchell, 1997, Toward a Theory of Stakeholder Identification and Salience: Defining the principle of who and what really counts, Acad. Manag. Rev., 22, 853, 10.2307/259247 · DOI · Paper page
  27. Aaltonen, 2008, Stakeholder salience in global projects, Int. J. Proj. Manag., 26, 509, 10.1016/j.ijproman.2008.05.004 · DOI · Paper page
  28. 2017, How to assess stakeholders’ influence in project management? A proposal based on the Analytic Network Process, Int. J. Proj. Manag., 35, 451, 10.1016/j.ijproman.2017.01.001 · DOI
  29. Lin, 2017, Who should take the responsibility? Stakeholders’ power over social responsibility issues in construction projects, J. Clean. Prod., 154, 318, 10.1016/j.jclepro.2017.04.007 · DOI
  30. Wood, 2021, Stakeholder identification and salience after 20 years: Progress, problems, and prospects, Bus. Soc., 60, 196, 10.1177/0007650318816522 · DOI · Paper page
  31. Chen, 2010, Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization, Autom. Constr., 19, 665, 10.1016/j.autcon.2010.02.011 · DOI
  32. Safaa, 2019, Evaluation of the use of prefabricated bridge elements with Design for Manufacture and Assembly (DfMA) criteria, MATEC Web Conf., 270, 05006, 10.1051/matecconf/201927005006 · doi:10.1051/matecconf/201927005006
  33. Lu, 2018, Searching for an optimal level of prefabrication in construction: An analytical framework, J. Clean. Prod., 201, 236, 10.1016/j.jclepro.2018.07.319 · DOI
  34. Gibb, 2003, Re-engineering through pre-assembly: Client expectations and drivers, Build. Res. Inf., 31, 146, 10.1080/09613210302000 · DOI · Paper page
  35. Liu, 2019, Evaluation of social life-cycle performance of buildings: Theoretical framework and impact assessment approach, J. Clean. Prod., 213, 792, 10.1016/j.jclepro.2018.12.200 · DOI
  36. Jaillon, 2010, Design issues of using prefabrication in Hong Kong building construction, Constr. Manag. Econ., 28, 1025, 10.1080/01446193.2010.498481 · DOI · Paper page
  37. Liang, 2015, Improving Management of Green Retrofits from a Stakeholder Perspective: A Case Study in China, Int. J. Environ. Res. Public Health, 12, 13823, 10.3390/ijerph121113823 · doi:10.3390/ijerph121113823
  38. Yang, 2014, Stakeholder-associated risks and their interactions in complex green building projects: A social network model, Build. Environ., 73, 208, 10.1016/j.buildenv.2013.12.014 · DOI · Paper page
  39. Li, 2016, Schedule risks in prefabrication housing production in Hong Kong: A social network analysis, J. Clean. Prod., 134, 482, 10.1016/j.jclepro.2016.02.123 · DOI · Paper page
  40. Freeman, 1978, Centrality in social networks conceptual clarification, Soc. Netw., 1, 215, 10.1016/0378-8733(78)90021-7 · DOI · Paper page
  41. Meghanathan, N. (2017). Graph Tools for Social Network Analysis. Graph Theoretic Approaches for Analyzing Large-Scale Social Networks, IGI Global. · doi:10.4018/978-1-5225-2814-2
  42. Faust, 1997, Centrality in affiliation networks, Soc. Netw., 19, 157, 10.1016/S0378-8733(96)00300-0 · DOI · Paper page
  43. Borgatti, 1997, Network analysis of 2-mode data, Soc. Netw., 19, 243, 10.1016/S0378-8733(96)00301-2 · DOI · Paper page
  44. Yang, 2016, Modelling stakeholder-associated risk networks in green building projects, Int. J. Proj. Manag., 34, 66, 10.1016/j.ijproman.2015.09.010 · DOI · Paper page
  45. Yu, 2017, Managing social risks at the housing demolition stage of urban redevelopment projects: A stakeholder-oriented study using social network analysis, Int. J. Proj. Manag., 35, 925, 10.1016/j.ijproman.2017.04.004 · DOI · Paper page
  46. Li, 2017, Schedule risk modeling in prefabrication housing production, J. Clean. Prod., 153, 692, 10.1016/j.jclepro.2016.11.028 · DOI
  47. Xu, 2018, Cloud-based fleet management for prefabrication transportation, Enterp. Inf. Syst., 13, 87, 10.1080/17517575.2018.1455109 · doi:10.1080/17517575.2018.1455109
  48. Li, 2017, Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction, J. Clean. Prod., 165, 1048, 10.1016/j.jclepro.2017.07.156 · DOI · Paper page
  49. Chiang, 2006, Prefabrication and barriers to entry—A case study of public housing and institutional buildings in Hong Kong, Habitat Int., 30, 482, 10.1016/j.habitatint.2004.12.004 · DOI · Paper page
  50. Li, 2016, SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong, Habitat Int., 57, 74, 10.1016/j.habitatint.2016.07.002 · DOI
  51. Zhou, 2021, Customization of on-site assembly services by integrating the internet of things and BIM technologies in modular integrated construction, Autom. Constr., 126, 103663, 10.1016/j.autcon.2021.103663 · DOI
  52. Luo, 2020, Supply Chain Management for Prefabricated Building Projects in Hong Kong, J. Manag. Eng., 36, 05020001, 10.1061/(ASCE)ME.1943-5479.0000739 · DOI
  53. Slaughter, 2000, Implementation of construction innovations, Build. Res. Inf., 28, 2, 10.1080/096132100369055 · DOI
  54. Li, L., Li, Z., Wu, G., and Li, X. (2018). Critical success factors for project planning and control in prefabrication housing production: A China study. Sustainability, 10. · DOI
  55. 2007, Enabling distributed multi-disciplinary design of complex products: A knowledge based engineering approach, J. Des. Res., 5, 333
  56. Perkins, 2015, Three-dimensional printing in the construction industry: A review, Int. J. Constr. Manag., 15, 1
  57. Steel, 2012, Model interoperability in building information modelling, Softw. Syst. Model., 11, 99, 10.1007/s10270-010-0178-4 · DOI · Paper page
  58. Bamana, 2019, Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles, J. Constr. Eng. Manag., 145, 05019005, 10.1061/(ASCE)CO.1943-7862.0001654 · doi:10.1061/(asce)co.1943-7862.0001654
  59. Jiang, Y., Zhao, D., Wang, D., and Xing, Y. (2019). Sustainable Performance of Buildings through Modular Prefabrication in the Construction Phase: A Comparative Study. Sustainability, 11. · DOI
  60. Gao, 2020, Prefabrication policies and the performance of construction industry in China, J. Clean. Prod., 253, 120042, 10.1016/j.jclepro.2020.120042 · DOI
  61. Wuni, 2020, Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies, J. Clean. Prod., 249, 119347, 10.1016/j.jclepro.2019.119347 · DOI
  62. Jiang, W., Luo, L., Wu, Z., Fei, J., Antwi-Afari, M.F., and Yu, T. (2019). An investigation of the effectiveness of prefabrication incentive policies in China. Sustainability, 11. · doi:10.3390/su11195149
  63. Gan, 2018, Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach, J. Clean. Prod., 197, 8, 10.1016/j.jclepro.2018.06.184 · DOI
  64. Jiang, W., Huang, Z., Peng, Y., Fang, Y., and Cao, Y. (2020). Factors affecting prefabricated construction promotion in China: A structural equation modeling approach. PLoS ONE, 15. · doi:10.1371/journal.pone.0227787
  65. Gan, 2019, Exploring the interactions among factors impeding the diffusion of prefabricated building technologies: Fuzzy cognitive maps, Eng. Constr. Archit. Manag., 26, 535, 10.1108/ECAM-05-2018-0198 · DOI
  66. Si, T., Li, H.X., Hosseini, M.R., Ji, Y., and Liu, C. (2020, January 8–10). A Solution to Just-in-Time Delivery for Off-Site Construction: A Conceptual Model. Proceedings of the Construction Research Congress (CRC) on Construction Research and Innovation to Transform Society, Tempe, AZ, USA. · DOI
  67. Jiang, L., Li, Z., Li, L., and Gao, Y. (2018). Constraints on the Promotion of Prefabricated Construction in China. Sustainability, 10. · doi:10.3390/su10072516
  68. Xu, 2021, Stakeholders’ power over the impact issues of building energy performance gap: A two-mode social network analysis, J. Clean. Prod., 289, 125623, 10.1016/j.jclepro.2020.125623 · DOI
  69. Li, 2020, Smart work packaging-enabled constraint-free path re-planning for tower crane in prefabricated products assembly process, Adv. Eng. Inform., 43, 101008, 10.1016/j.aei.2019.101008 · doi:10.1016/j.aei.2019.101008
  70. Li, 2021, Two-layer Adaptive Blockchain-based Supervision model for off-site modular housing production, Comput. Ind., 128, 103437, 10.1016/j.compind.2021.103437 · DOI
  71. Ekanayake, 2021, Identifying supply chain capabilities of construction firms in industrialized construction, Prod. Plan. Control, 32, 303, 10.1080/09537287.2020.1732494 · DOI

Cited by

See all 19

Metadata

Authors
Jin, X., Shen, G. Q. P., & Ekanayake, E. M. A. C.
Venue
International Journal of Environmental Research and Public Health
Publisher
MDPI AG
Published
2021-08-26
Volume
18
Issue
17
Pages
9017
ISSN
1660-4601
Cited by
19
References
0
Language
en
Funders
Public Policy Research Funding Scheme from the Policy Innovation and Co-ordination Office of the Government of the Hong Kong Special Administrative Region (2017.A6.107.18B)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Improving Construction Industrialization Practices from a Socio-Technical System Perspective: A Hong Kong Case. https://app.cochat.ai/papers/10.3390/ijerph18179017
The paper
Jin, X., Shen, G. Q. P., & Ekanayake, E. M. A. C. (2021). Improving Construction Industrialization Practices from a Socio-Technical System Perspective: A Hong Kong Case. International Journal of Environmental Research and Public Health. https://doi.org/10.3390/ijerph18179017

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.