Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong

Luo, Lizi, Qiping Shen, Geoffrey, Xu, Gangyan, Liu, Yunlin, Wang, Yingjie · 2019 · Journal of Management in Engineering
Cited by 236

The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.

Abstract

Prefabricated building projects (PBPs) have contributed significantly to addressing Hong Kong’s serious housing shortage and accommodate almost half of the residents in this densely populated city. The supply chains of PBPs involve large numbers of stakeholders, including clients, designers, main contractors, transporters, and assembly subcontractors, all of which need to interact with each other by frequent information exchanges. However, cross-border supply chains are found to be quite complex, resulting in risks that significantly affect the performance of PBPs. Supply chain risks (SCRs) are closely associated with the stakeholders involved and have high interdependency with each other. This paper adopts social network analysis (SNA) to develop the risk network of the supply chain of a PBP in Hong Kong to prioritize the stakeholder-associated SCR. The research findings show that poor planning of resources and schedule, poor control of working flows, and poor information sharing between stakeholders are the major challenges to the supply chains of PBPs. This is the first study to consider the dynamic risk interdependency and associated stakeholders in SCRs. By providing a greater understanding of the risks embedded across the supply chains of PBPs in Hong Kong, this study could assist practitioners dealing with such risks more effectively and efficiently.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)me.1943-5479.0000675

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

Metadata

Authors
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y.
Venue
Journal of Management in Engineering
Published
2019-03
Volume
35
Issue
2
ISSN
  • 0742-597X (ISSN-L)
  • 1943-5479
OpenAlex
W2905852799
Cited by
236
References
2
FWCI
12.19
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000675
The paper
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019). Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000675

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.