A Cradle to Handover Life Cycle Assessment of External Walls: Choice of Materials and Prognosis of Elements
Open accessThe DOI matches its Crossref record; 74 of the 75 references it cites were found in a registry or an index.
Abstract
This research focuses on a comparison of 20 external wall systems that are conventionally used in Spanish residential buildings, from a perspective based on the product and construction process stages of the life cycle assessment. The primary objective is to provide data that allow knowing the environmental behavior of walls built with materials and practices conventionally. This type of analysis will enable promoting the creation of regulations that encourage the use of combinations of materials that generate the most environmentally suitable result, and in turn, contribute to the strengthening of the embodied stages study of buildings and their elements. The results indicate that the greatest impact arises in the product stage (90.9%), followed by the transport stage (8.9%) and the construction process stage (<1%). Strategies (such as the use of large-format pieces and the controlled increase in thickness of the thermal insulation) can contribute to reducing the environmental impact; on the contrary, practices such as the use of small-format pieces and laminated plasterboard can increase the environmental burden. The prediction of the environmental behavior (simulation equation) allows these possible impacts to be studied in a fast and simplified way.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Figures








Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The check wasn’t confident either way, so it gives no verdict — never disputed.
In the citing paper
“the case of wood-concrete systems may differ as they in some cases exhibit even higher environmental impacts as they lack in optimized substitution of cement [52-57].”
From Integrating Regionalized Socioeconomic Considerations onto Life Cycle Assessment for Evaluating Bioeconomy Value Chains: A Case Study on Hybrid Wood–Concrete Ceiling Elements (2021) · cites this paper as [55]
Experimental — accuracy not yet measuredThe check wasn’t confident either way, so it gives no verdict — never disputed.
In the citing paper
“Whereas fully wood-based building systems outperform steel-reinforced concrete systems normally in the range of 10-55% in most environmental impact categories”
From Integrating Regionalized Socioeconomic Considerations onto Life Cycle Assessment for Evaluating Bioeconomy Value Chains: A Case Study on Hybrid Wood–Concrete Ceiling Elements (2021) · cites this paper as [55]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Recent developments in life cycle assessment
Finnveden, G., Hauschild, M. Z., Ekvall, T., Guinée, J., Heijungs, R., Hellweg, S., Koehler, A., Pennington, D., & Suh, S. (2009) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.06.018 · Cited by 3,444 · cited 2×
“The relevance of this analyses has been pointed out by several researchers [50,95–101], which contribute to focused research efforts and also provide support in the interpretation of LCA study results [102], particularly in studies when the input data of the LCI has not been documented or are unreliable [100,103].”
BackgroundResultCabeza, L. F., Rincón, L., Vilariño, V., Pérez, G., & Castell, A. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.08.037 · Cited by 1,455
Life cycle energy analysis of buildings: An overview
Ramesh, T., Prakash, R., & Shukla, K. K. (2010) · Energy and Buildings · doi:10.1016/j.enbuild.2010.05.007 · Cited by 1,408
Sustainability in the construction industry: A review of recent developments based on LCA
Ortiz, O., Castells, F., & Sonnemann, G. (2009) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2007.11.012 · Cited by 1,340
Zabalza Bribián, I., Valero Capilla, A., & Aranda Usón, A. (2011) · Building and Environment · doi:10.1016/j.buildenv.2010.12.002 · Cited by 1,287
Energy use in the life cycle of conventional and low-energy buildings: A review article
Sartori, I., & Hestnes, A. G. (2007) · Energy and Buildings · doi:10.1016/j.enbuild.2006.07.001 · Cited by 1,284 · cited 2×
“It has been established in previous studies that the operation phase must be included in the life cycle assessment (LCA) as a priority [20], but without omitting the rest of the phases, since the impact cannot be considered negligible [7,21].”
BackgroundLife cycle sustainability assessment of products: (with Comments by Helias A. Udo de Haes, p. 95)
Kloepffer, W. (2008) · The International Journal of Life Cycle Assessment · doi:10.1065/lca2008.02.376 · Cited by 1,129
Sustainable development and climate change initiatives
Damtoft, J. S., Lukasik, J., Herfort, D., Sorrentino, D., & Gartner, E. M. (2008) · Cement and Concrete Research · doi:10.1016/j.cemconres.2007.09.008 · Cited by 1,094
Towards Life Cycle Sustainability Assessment
Finkbeiner, M., Schau, E. M., Lehmann, A., & Traverso, M. (2010) · Sustainability · doi:10.3390/su2103309 · Cited by 915
Green house gas emissions due to concrete manufacture
Flower, D. J. M., & Sanjayan, J. G. (2007) · The International Journal of Life Cycle Assessment · doi:10.1065/lca2007.05.327 · Cited by 912 · cited 2×
“rates [90], being a fundamental component in the manufacture of mortar.”
BackgroundEmbodied energy of common and alternative building materials and technologies
Venkatarama Reddy, B. V., & Jagadish, K. S. (2003) · Energy and Buildings · doi:10.1016/s0378-7788(01)00141-4 · Cited by 829
Scheuer, C., Keoleian, G. A., & Reppe, P. (2003) · Energy and Buildings · doi:10.1016/s0378-7788(03)00066-5 · Cited by 728
Lloyd, S. M., & Ries, R. (2007) · Journal of Industrial Ecology · doi:10.1162/jiec.2007.1136 · Cited by 582
The changing role of life cycle phases, subsystems and materials in the LCA of low energy buildings
Blengini, G. A., & Di Carlo, T. (2010) · Energy and Buildings · doi:10.1016/j.enbuild.2009.12.009 · Cited by 568
Life cycle assessment in the construction sector: A review
Buyle, M., Braet, J., & Audenaert, A. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.05.001 · Cited by 558
Life cycle primary energy analysis of residential buildings
Gustavsson, L., & Joelsson, A. (2010) · Energy and Buildings · doi:10.1016/j.enbuild.2009.08.017 · Cited by 449
The effect of material choice on the total energy need and recycling potential of a building
Thormark, C. (2006) · Building and Environment · doi:10.1016/j.buildenv.2005.04.026 · Cited by 431
Mirrahimi, S., Mohamed, M. F., Haw, L. C., Ibrahim, N. L. N., Yusoff, W. F. M., & Aflaki, A. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.09.055 · Cited by 407
Lei, J., Yang, J., & Yang, E.-H. (2016) · Applied Energy · doi:10.1016/j.apenergy.2015.10.031 · Cited by 382
Comparative life cycle analysis for green façades and living wall systems
Ottelé, M., Perini, K., Fraaij, A. L. A., Haas, E. M., & Raiteri, R. (2011) · Energy and Buildings · doi:10.1016/j.enbuild.2011.09.010 · Cited by 354
Huijbregts, M. A. J., Gilijamse, W., Ragas, A. M. J., & Reijnders, L. (2003) · Environmental Science & Technology · doi:10.1021/es020971+ · Cited by 353
Asdrubali, F., Baldassarri, C., & Fthenakis, V. (2013) · Energy and Buildings · doi:10.1016/j.enbuild.2013.04.018 · Cited by 351
Relevance of simplifications in LCA of building components
Kellenberger, D., & Althaus, H.-J. (2009) · Building and Environment · doi:10.1016/j.buildenv.2008.06.002 · Cited by 263
Ortiz, O., Pasqualino, J. C., & Castells, F. (2010) · Waste Management · doi:10.1016/j.wasman.2009.11.013 · Cited by 245
Robertson, A. B., Lam, F. C. F., & Cole, R. J. (2012) · Buildings · doi:10.3390/buildings2030245 · Cited by 238
Erlandsson, M., & Borg, M. (2003) · Building and Environment · doi:10.1016/s0360-1323(03)00031-3 · Cited by 220
Life cycle energy assessment of a typical office building in Thailand
Kofoworola, O. F., & Gheewala, S. H. (2009) · Energy and Buildings · doi:10.1016/j.enbuild.2009.06.002 · Cited by 211
(2015) · LCA Compendium – The Complete World of Life Cycle Assessment · doi:10.1007/978-94-017-9744-3 · Cited by 201
Inventory analysis of LCA on steel- and concrete-construction office buildings
Xing, S., Xu, Z., & Jun, G. (2008) · Energy and Buildings · doi:10.1016/j.enbuild.2007.10.016 · Cited by 198
Wei, W., Larrey-Lassalle, P., Faure, T., Dumoulin, N., Roux, P., & Mathias, J.-D. (2015) · Environmental Science & Technology · doi:10.1021/es502128k · Cited by 198
Methods for global sensitivity analysis in life cycle assessment
Groen, E. A., Bokkers, E. A. M., Heijungs, R., & de Boer, I. J. M. (2017) · The International Journal of Life Cycle Assessment · doi:10.1007/s11367-016-1217-3 · Cited by 193
The application of air layers in building envelopes: A review
Zhang, T., Tan, Y., Yang, H., & Zhang, X. (2016) · Applied Energy · doi:10.1016/j.apenergy.2015.12.108 · Cited by 183
Iddon, C. R., & Firth, S. K. (2013) · Energy and Buildings · doi:10.1016/j.enbuild.2013.08.041 · Cited by 182
Cass, D., & Mukherjee, A. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000349 · Cited by 180
Zhang, X., Shen, L., & Zhang, L. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2012.09.024 · Cited by 170
Jia Wen, T., Chin Siong, H., & Noor, Z. Z. (2015) · Energy and Buildings · doi:10.1016/j.enbuild.2014.12.002 · Cited by 170
Gong, X., Nie, Z., Wang, Z., Cui, S., Gao, F., & Zuo, T. (2012) · Journal of Industrial Ecology · doi:10.1111/j.1530-9290.2011.00415.x · Cited by 163
BEPAS—a life cycle building environmental performance assessment model
Zhang, Z., Wu, X., Yang, X., & Zhu, Y. (2006) · Building and Environment · doi:10.1016/j.buildenv.2005.02.028 · Cited by 162
Life-Cycle Assessment Modeling of Construction Processes for Buildings
Bilec, M. M., Ries, R. J., & Matthews, H. S. (2010) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000022 · Cited by 160
Sustainability based on LCM of residential dwellings: A case study in Catalonia, Spain
Ortiz, O., Bonnet, C., Bruno, J. C., & Castells, F. (2008) · Building and Environment · doi:10.1016/j.buildenv.2008.05.004 · Cited by 150
Wall insulation measures for residential villas in Dubai: A case study in energy efficiency
Friess, W. A., Rakhshan, K., Hendawi, T. A., & Tajerzadeh, S. (2011) · Energy and Buildings · doi:10.1016/j.enbuild.2011.10.005 · Cited by 148
Sandanayake, M. S., Lokuge, W. P., Zhang, G., Setunge, S., & Tushar, Q. (2017) · Sustainable Cities and Society · doi:10.1016/j.scs.2017.12.017 · Cited by 145
Environmental Analysis of Petrol, Diesel and Electric Passenger Cars in a Belgian Urban Setting
Hooftman, N., Oliveira, L., Messagie, M., Coosemans, T., & Van Mierlo, J. (2016) · Energies · doi:10.3390/en9020084 · Cited by 141
Chang, Y., Ries, R. J., & Lei, S. (2012) · Energy and Buildings · doi:10.1016/j.enbuild.2012.10.019 · Cited by 139
Energy and environmental assessment of two high energy performance residential buildings
Thiers, S., & Peuportier, B. (2011) · Building and Environment · doi:10.1016/j.buildenv.2011.11.018 · Cited by 108
Chang, Y., Ries, R. J., & Wang, Y. (2011) · Energy Policy · doi:10.1016/j.enpol.2011.07.033 · Cited by 106
Comparative pavement life cycle assessment with parameter uncertainty
Noshadravan, A., Wildnauer, M., Gregory, J. R., & Kirchain, R. (2013) · Transportation Research Part D Transport and Environment · doi:10.1016/j.trd.2013.10.002 · Cited by 106
An approach to LCSA: the case of concrete recycling
Hu, M., Kleijn, R., Bozhilova-Kisheva, K. P., & Maio, F. D. (2013) · The International Journal of Life Cycle Assessment · doi:10.1007/s11367-013-0599-8 · Cited by 102
Heinonen, J. T., Säynäjoki, A., Junnonen, J., Pöyry, A., & Junnila, S. (2015) · Building and Environment · doi:10.1016/j.buildenv.2015.09.006 · Cited by 102
Tsai, W.-H., Lin, S., Liu, J.-Y., Lin, W., & Lee, K.-C. (2011) · Energy · doi:10.1016/j.energy.2011.02.046 · Cited by 98
Model for Cradle-to-Gate Life Cycle Assessment of Clinker Production
Boesch, M. E., Koehler, A., & Hellweg, S. (2009) · Environmental Science & Technology · doi:10.1021/es900036e · Cited by 92
Ortiz, O., Pasqualino, J., Díez, G., & Castells, F. (2010) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2010.01.002 · Cited by 80
A multi-objective life cycle approach for optimal building design: A case study in Finnish context
Pal, S. K., Takano, A., Alanne, K., Palonen, M., & Sirén, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.12.018 · Cited by 80
Environmental performance of ceramic tiles: Improvement proposals
Bovea, M. D., Díaz-Albo, E., Izquierdo, A. G., Mendoza, F. J. C., & Mira, J. S. (2009) · Materials & Design (1980-2015) · doi:10.1016/j.matdes.2009.07.021 · Cited by 77
Radhi, H., & Sharples, S. (2012) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2012.06.009 · Cited by 74
Serrano, Á., Borreguero, A. M., Garrido, I., Rodríguez, J. F., & Carmona, M. (2016) · Applied Thermal Engineering · doi:10.1016/j.applthermaleng.2016.04.098 · Cited by 69
Smith, S. H., & Durham, S. A. (2016) · International Journal of Sustainable Built Environment · doi:10.1016/j.ijsbe.2016.01.001 · Cited by 68
Comparative “from Cradle to Gate” Life Cycle Assessments of Hot Mix Asphalt (HMA) Materials
Moretti, L., Mandrone, V., D’Andrea, A., & Caro, S. (2017) · Sustainability · doi:10.3390/su9030400 · Cited by 61
Life Cycle Energy and Environmental Analysis of Partition Wall Systems in the UK
Broun, R., & Menzies, G. F. (2011) · Procedia Engineering · doi:10.1016/j.proeng.2011.11.2088 · Cited by 59
Assessment of Life-Cycle Benefit-Cost of Composites in Construction
Hastak, M., & Halpin, D. W. (2000) · Journal of Composites for Construction · doi:10.1061/(asce)1090-0268(2000)4:3(103 · Cited by 58
Han, B., Wang, R., Liang, Y., Liu, H., & Wang, Z. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.03.032 · Cited by 56
Evaluation of the environmental and human health impact of road construction activities
Moretti, L., Mandrone, V., D’Andrea, A., & Caro, S. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.250 · Cited by 53
Ferrández-García, A., Ibáñez‐Forés, V., & Bovea, M. D. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.07.136 · Cited by 52
Benchmarking the Life-Cycle Environmental Performance of Buildings
Gervásio, H., Dimova, S., & Pinto, A. (2018) · Sustainability · doi:10.3390/su10051454 · Cited by 44
A multivariable regression tool for embodied carbon footprint prediction in housing habitat
Gardezi, S. S. S., Shafiq, N., Zawawi, N. A. W. A., Khamidi, M. F., & Farhan, S. A. (2015) · Habitat International · doi:10.1016/j.habitatint.2015.11.005 · Cited by 42
Pathways to Decarbonise the European Car Fleet: A Scenario Analysis Using the Backcasting Approach
Höltl, A., Macharis, C., & Brucker, K. D. (2017) · Energies · doi:10.3390/en11010020 · Cited by 42
A model for the sustainable selection of building envelope assemblies
Huedo, P., Mulet, E., & López-Mesa, B. (2015) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2015.11.005 · Cited by 34
Embodied impacts of traditional clay versus modern concrete houses in a tropical regime
Utama, N. A., McLellan, B. C., Gheewala, S. H., & Ishihara, K. N. (2012) · Building and Environment · doi:10.1016/j.buildenv.2012.06.006 · Cited by 32
A Framework for Life-Cycle Cost Assessment of Composites in Construction
Hastak, M., Mirmiran, A., & Richard, D. N. (2003) · Journal of Reinforced Plastics and Composites · doi:10.1177/073168403035586 · Cited by 31
“Team Play” between Renewable Energy Sources and Vehicle Fleet to Decrease Air Pollution
Longo, M., Yaïci, W., & Zaninelli, D. (2015) · Sustainability · doi:10.3390/su8010027 · Cited by 30
Roh, S., Tae, S., & Kim, R. (2018) · Sustainability · doi:10.3390/su10061693 · Cited by 29
Low carbon Buildings: Sensitivity of Thermal Properties of Opaque Envelope Construction and Glazing
Dowd, R. M., & Mourshed, M. M. (2015) · Energy Procedia · doi:10.1016/j.egypro.2015.07.189 · Cited by 25
Some aspects of energy efficient building envelope in high latitude countries
Chwieduk, D. A. (2016) · Solar Energy · doi:10.1016/j.solener.2016.03.068 · Cited by 24
Using Eco-Indicator 99 to Evaluate Building Technologies under Life Cycle Assessment Uncertainties
Pushkar, S. (2013) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000143 · Cited by 22
Research works printed but not linked: 1
- Hauschild, M.Z., and Huijbregts, M.A.J. (2015). Introducing the Life Cycle Impact Assessment. Life Cycle Assessment, Springer. · DOI · Paper page
Cited by
Dong, S., Li, C., & Xian, G. (2021) · Polymers · doi:10.3390/polym13010154 · Cited by 67
A Review of Residential Buildings’ Sustainability Performance Using a Life Cycle Assessment Approach
Janjua, S. Y., Sarker, P. K., & Biswas, W. K. (2019) · Journal of Sustainability Research · doi:10.20900/jsr20190006 · Cited by 63
Initial approximation of the implications for architecture due to climate change
Andrić, I., Corre, O. L., Lacarrière, B., Ferrão, P., & Al‐Ghamdi, S. G. (2019) · Advances in Building Energy Research · doi:10.1080/17512549.2018.1562980 · Cited by 42
Rodrigo-Bravo, A., Cuenca-Romero, L. A., Calderón, V., Sáiz, Á. R., & González, S. G. (2022) · Energy and Buildings · doi:10.1016/j.enbuild.2022.111867 · Cited by 34
Muneron, L. M., Hammad, A. W. A., Najjar, M. K., HADDAD, A. N., & Vazquez, E. G. (2021) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2021.100243 · Cited by 42
Metadata
- Authors
- Gámez-García, D. C., Gómez-Soberón, J. M., Corral-Higuera, R., Saldaña-Márquez, H., Gómez-Soberón, M. C., & Arredondo-Rea, S. P.
- Affiliations
- Universitat Politècnica de Catalunya (ES)
- Mochis Faculty of Engineering, Autonomous University of Sinaloa, no number Fuente de Poseidón y Ángel Flores, 81210 Los Mochis, Mexico
- Universidad Autónoma Metropolitana (MX)
- Universidad Autónoma de Sinaloa (MX)
- Corresponding author
- Gómez-Soberón, José Manuel
- ORCID
- Venue
- Sustainability
- Publisher
- MDPI AG
- Published
- 2018-08-03
- Volume
- 10
- Issue
- 8
- Pages
- 2748
- ISSN
- 2071-1050 (ISSN-L)
- OpenAlex
- W2887828317
- Semantic Scholar
- dea0637c6d362995b607e9e512943dacca118501
- Cited by
- 35
- References
- 75
- Citations by year
- 2025: 3 · 2024: 5 · 2023: 9 · 2022: 3 · 2021: 6 · 2020: 2 · 2019: 3 · 2018: 4
- FWCI
- 1.88
- Type
- journal article
- Language
- en
- Open access
- gold
- dx.doi.org
- Licence
- Locations
- Sustainability (publishedVersion, cc-by)
- LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) (acceptedVersion, cc-by-nc-nd)
- RECERCAT (Consorci de Serveis Universitaris de Catalunya) (acceptedVersion, other-oa)
- RePEc: Research Papers in Economics (submittedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- UPCommons institutional repository (Universitat Politècnica de Catalunya) (submittedVersion, cc-by-nc-nd)
- Topics
- Physical Sciences › Environmental Science › Environmental Engineering › Environmental Impact and Sustainability
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Physical Sciences › Engineering › Building and Construction › Building energy efficiency and sustainability
- Keywords
- exterior walls, life cycle assessment, embodied environmental impacts, residential buildings, material selection, construction process, thermal insulation, environmental impact prediction
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.