Abstract

Bidirectional electric vehicle (EV) charging represents an opportunity to leverage EVs as flexible energy assets within the power system. By enabling controlled power flow in both directions, bidirectional charging unlocks a wide range of grid services, thereby enhancing grid stability as the energy sector decarbonizes. This paper presents a comprehensive experimental evaluation of bidirectional charging systems (EVCS), focusing on response dynamics and controllability delays critical for grid services. A real ISO 15118–20–enabled EV and an EV emulator were used to conduct tests across configurations, utilizing the Watt & Well 22 kW bidirectional charging bay. The study compares CCS2 and CHAdeMO protocols under varying configuration conditions. Results show that modern chargers achieve sub-second responsiveness, with local communication delays typically below 0.4 s and ramping times around 0.5 s. However, power flow reversals introduce an additional delay of approximately 1 s. These updated controllability metrics are essential for validating bidirectional charging in time-critical applications such as primary frequency regulation. The findings highlight the influence of voltage level and modular configuration on dynamic performance, underscoring the need to integrate external control path delays for full-stack validation. This work provides a foundation for modeling and deploying bidirectional EVCS in fast-response grid services.

Overview

CoChat Summary

TL;DR

This paper experimentally characterizes the response dynamics of a Watt & Well bidirectional EVSE under ISO 15118-20/CCS2 and CHAdeMO, finding sub-second communication and ramping but an additional ~1 s delay for power flow reversals. It provides updated controllability metrics for grid services and compares modern CCS2 with CHAdeMO and prior CHAdeMO results.

Key findings

  • Modern bidirectional EVCS achieved sub-second responsiveness: local communication delays were typically below 0.4 s and ramping times around 0.5 s; average response was less than 1 s when power flow direction remained unchanged, but more than 1 s when direction changed.
  • Power flow reversal (PFR) introduced an additional delay of approximately 1 s; measured t_PFR ranged from 0 to 1.7 s across configurations, with CCS2 mean t_PFR = 1.118 s (CV 0.312) and CHAdeMO mean t_PFR = 0.661 s (CV 0.679).
  • CCS2 showed lower communication latency and faster converter ramping than CHAdeMO: t_comm = 0.188 s vs 0.314 s, and P_conv = 30.916 kW/s vs 20.036 kW/s (CCS2 about 50% better as stated). Overall transition time t_total remained similar: CCS2 1.255 s vs CHAdeMO 1.254 s.
  • Voltage level and modular configuration influenced dynamics: nominal 400 V and 800 V configurations outperformed 575 V; series stacking at 800 V gave ramping rates up to 150% of a single power module and parallel stacking, while parallel stacking did not proportionally increase ramping. The paper also reports t_delay reduced from 4 s in a prior 2018 CHAdeMO study to approximately 0.4–0.5 s.

Methods

  • Experimental test of a Watt & Well 22 kW bidirectional DC EVSE with two 11 kW BMPU modules, EVIX board, CCS2/CHAdeMO connectors, controlled by a Raspberry Pi and PC GUI. EV side used a Keysight CDS emulator (SL1040A with SL1550A and SL1800A) for ISO 15118-20, a pre-production KIA EV9 (CCS2, SOC = 50%, V_batt = 575 V), and a Nissan Leaf (CHAdeMO, SOC = 80%, V_batt = 385 V).
  • Seven configurations (Table 3) across eight operational steps, including 0 to FPT, FPT to 0, 0 to RPT_1, RPT to 0_1, 0 to RPT_2, RPT to FPT, FPT to RPT, and RPT to 0_2; setpoints were held for 5 s, and three independent runs were performed per configuration.
  • DC current was sampled at 1 kHz with a Keysight oscilloscope, triggered by a Raspberry Pi GPIO signal after the EVI board confirmed receipt of the setpoint. KPIs included t_delay, t_ramp, t_total, and P_ramp; post-processing used t_5% and t_95%, and PFR transitions were excluded to isolate t_comm and P_conv, with t_PFR derived via equations.

Limitations

  • Paper-stated: the timing reference relies on the Raspberry Pi pulling a GPIO high only after the EVI accepted the setpoint, so measured delay is a lower bound and actual communication latency can be higher. Measurements focused on the DC side; AC-side current and real-time battery voltage should also be recorded. The procedure used a limited set of step sizes and primarily full power transitions, so broader intermediate setpoints are needed. Voltage and power caps were not standardized across CCS2 and CHAdeMO comparisons, and broader validation across vehicle types and states of charge is recommended. TLS 1.3 was disabled during all CCS2 testing because the required PKI is not fully integrated, with the paper assuming negligible impact on active power transfer dynamics.
  • Evident from the text: the CCS2 vs CHAdeMO comparison is confounded by different configurations, voltage levels, power caps, and sample sizes (CCS2 includes six configurations while CHAdeMO includes one), so protocol effects are not fully isolated. The study uses one EVSE model and one real EV per protocol, with three runs per configuration. PFR delays are attributed to system-level control and communication overhead rather than BMPU hardware, based on the BMPU datasheet and stacked-module behavior.

Model-written summary. Check it against the paper before relying on it.

Integrity signals

Registry

Crossref · 10.3390/wevj16110636

Cites

25 of 26 references verified0 citation errors · 1 not checkable

Statistics

Nothing to recompute.

Figures

Figure 1 Control system architecture for EV grid services. The external controller monitors grid conditions and sends setpoint (sp) signals to the EVSE, where the supply equipment charging controller (SECC) communicates with the electric vehicle charging controller (EVCC) to monitor and manage the power flow.
Figure 1 Control system architecture for EV grid services. The external controller monitors grid conditions and sends setpoint (sp) signals to the EVSE, where the supply equipment charging controller (SECC) communicates with the electric vehicle charging controller (EVCC) to monitor and manage the power flow.CC-BY · From the PDF
Figure 2 Bidirectional charging hardware readiness level: The ladder illustrates the progression of products (EVs, EVSEs) from basic hardware capabilities to full interoperability with third-party systems, highlighting the required steps of the industrial manufacturer for effective grid integration. This figure applies to both AC and DC charging systems.
Figure 2 Bidirectional charging hardware readiness level: The ladder illustrates the progression of products (EVs, EVSEs) from basic hardware capabilities to full interoperability with third-party systems, highlighting the required steps of the industrial manufacturer for effective grid integration. This figure applies to both AC and DC charging systems.CC-BY · From the PDF
Figure 3 Time-domain categorization of bidirectional charging services. Fast grid services, such as frequency regulation, require response times in seconds, while energy management services operate on longer timescales.
Figure 3 Time-domain categorization of bidirectional charging services. Fast grid services, such as frequency regulation, require response times in seconds, while energy management services operate on longer timescales.CC-BY · From the PDF
Figure 4 Communication flow for setpoint change during active DC power transfer (according to Section 8.3 [27]). The SECC validates the new setpoint from an external controller and awaits a cyclic request from the EVCC. Upon receiving it, SECC responds with the new target, which the EVCC may accept or reject. If accepted, the SECC forwards the setpoint to the power modules.
Figure 4 Communication flow for setpoint change during active DC power transfer (according to Section 8.3 [27]). The SECC validates the new setpoint from an external controller and awaits a cyclic request from the EVCC. Upon receiving it, SECC responds with the new target, which the EVCC may accept or reject. If accepted, the SECC forwards the setpoint to the power modules.CC-BY · From the PDF
Figure 5 Photograph of the test setup used in the experiments. The Watt & Well bidirectional EVSE, with measurements done internally, is connected with the CCS2 cable to the Keysight CDS, which emulates EV behavior and communication.
Figure 5 Photograph of the test setup used in the experiments. The Watt & Well bidirectional EVSE, with measurements done internally, is connected with the CCS2 cable to the Keysight CDS, which emulates EV behavior and communication.CC-BY · From the PDF
Figure 6 KPIs for the test sequence, including communication latency, and ramping time from 5% to 95% of the full response.
Figure 6 KPIs for the test sequence, including communication latency, and ramping time from 5% to 95% of the full response.CC-BY · From the PDF
Figure 7 The timeseries of setpoint changes imposed on the EVCS. The setpoint remains stable at each setpoint for 5 s. The priming ensures consistency of preconditions. Throughout this work, maximum forward power transfer (FPT) and maximum reverse power transfer (RPT) are defined in accordance with the respective system configurations.
Figure 7 The timeseries of setpoint changes imposed on the EVCS. The setpoint remains stable at each setpoint for 5 s. The priming ensures consistency of preconditions. Throughout this work, maximum forward power transfer (FPT) and maximum reverse power transfer (RPT) are defined in accordance with the respective system configurations.CC-BY · From the PDF
Figure 8 Hardware setup showing the Watt & Well bidirectional EVSE with dual BMPU modules, CCS2 and CHAdeMO connectors, and control interfaces. The Raspberry Pi provides setpoint control through the Ethernet connection, and the EVSE can connect to only one vehicle at a time-either CDS, EV9, or Leaf.
Figure 8 Hardware setup showing the Watt & Well bidirectional EVSE with dual BMPU modules, CCS2 and CHAdeMO connectors, and control interfaces. The Raspberry Pi provides setpoint control through the Ethernet connection, and the EVSE can connect to only one vehicle at a time-either CDS, EV9, or Leaf.CC-BY · From the PDF
Figure 9 Measurement setup showing the DC-side power measurements using a KeySight oscilloscope. The Raspberry Pi's GPIO signal triggers the measurement sequence after confirming receipt of the setpoint by the EVI board. DC current measurements of the combined current from the BMPUs to either CCS2 or CHAdeMO plug.
Figure 9 Measurement setup showing the DC-side power measurements using a KeySight oscilloscope. The Raspberry Pi's GPIO signal triggers the measurement sequence after confirming receipt of the setpoint by the EVI board. DC current measurements of the combined current from the BMPUs to either CCS2 or CHAdeMO plug.CC-BY · From the PDF
Figure 10 Full test sequence with eight steps starts with the red signal. The used configuration includes a single BMPU at 400 V connected to the CDS on ISO 15118-20 with CCS2.
Figure 10 Full test sequence with eight steps starts with the red signal. The used configuration includes a single BMPU at 400 V connected to the CDS on ISO 15118-20 with CCS2.CC-BY · From the PDF
Figure 11 Focused view of step transitions showing initial delay and ramping behavior for the first run with the configuration of two BMPU in parallel configuration connected to the CDS at 400 V. I sp indicates the setpoint with transition measured by the Oscilloscope. In contrast, the I meas shows the measured power response. The four plots show: ( a ) 0 to FPT ( b ) 0 to RPT (from a state of RPT, with no power flow reversal (PFR)). ( c ) 0 to RPT (from a state of FPT, and thus includes a PFR). ( d ) FPT to RPT Direct transition from fully charging to fully discharging.
Figure 11 Focused view of step transitions showing initial delay and ramping behavior for the first run with the configuration of two BMPU in parallel configuration connected to the CDS at 400 V. I sp indicates the setpoint with transition measured by the Oscilloscope. In contrast, the I meas shows the measured power response. The four plots show: ( a ) 0 to FPT ( b ) 0 to RPT (from a state of RPT, with no power flow reversal (PFR)). ( c ) 0 to RPT (from a state of FPT, and thus includes a PFR). ( d ) FPT to RPT Direct transition from fully charging to fully discharging.CC-BY · From the PDF
Figure 12 t delay means of each step and configuration. The heatmap shows the reaction time of the EVCS to a setpoint change. The color intensity indicates the mean reaction time in seconds. The results highlight significant differences in response times across configurations, particularly for transitions involving changes in power flow direction.
Figure 12 t delay means of each step and configuration. The heatmap shows the reaction time of the EVCS to a setpoint change. The color intensity indicates the mean reaction time in seconds. The results highlight significant differences in response times across configurations, particularly for transitions involving changes in power flow direction.CC-BY · From the PDF
Figure 13 t ramp means of each steps and configuration. The steps of direct change of power flow are obviously longer.
Figure 13 t ramp means of each steps and configuration. The steps of direct change of power flow are obviously longer.CC-BY · From the PDF
Figure 14 ˙ P ramp means of each steps and configuration. The heatmap shows the rate of change of power ( ˙ I ramp · V batt ) during the ramping phase, indicating the EVCS adjusting to new setpoints. The results suggest that operating at nominal voltages yields better performance, while transitions involving changes in power flow direction exhibit slower rates due to additional control delays.
Figure 14 ˙ P ramp means of each steps and configuration. The heatmap shows the rate of change of power ( ˙ I ramp · V batt ) during the ramping phase, indicating the EVCS adjusting to new setpoints. The results suggest that operating at nominal voltages yields better performance, while transitions involving changes in power flow direction exhibit slower rates due to additional control delays.CC-BY · From the PDF

Verification

Claims the paper makes

0 Valid · 1 Not valid · 23 Not checked · 73 Own results and interpretations

46 more claims

Create a free account to see all 97 claims and every source verdict.

See all claims — free account
  • Probably not a substantial claim. 21
  • It may state two separate claims as one. 35

Create a free account to see these claims.

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

Each contradiction between two passages listed here was confirmed by an independent check.

5 of 5

Citations

Cites

Research works printed but not linked: 3

  1. Waechter, N.; Eugster, P.; Piffaretti, M.; Christensen, B. Advancing Global Interoperability for Vehicle-to-Grid (V2G) Technology: Insights from Task 53. In Proceedings of the 38th International Electric Vehicle Symposium and Exhibition, Göteborg, Sweden, 15-18 June 2025.
  2. European Parliment. Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the Deployment of Alternative Fuels Infrastructure, and Repealing Directive 2014/94/EU. Off. J. Eur. Union 2024, 234, 1-47.
  3. Sevdari, K.; Knudsen, R.M.; Fabbri, G.; Pedersen, K.L.; Alami, A.; Marinelli, M. Demonstration of Bidirectional Charging Using ISO 15118-20. In Proceedings of the 38th International Electric Vehicle Symposium and Exhibition, Göteborg, Sweden, 15-18 June 2025.

Metadata

Authors
Pedersen, K. L., Knudsen, R. M., Marinelli, M., Secchi, M., & Sevdari, K.
Affiliations
  • Technical University of Denmark (DK)
  • Monta, Strandboulevarden 122, 2100 Copenhagen, Denmark
Corresponding author
Pedersen, Kristoffer Laust
Venue
World Electric Vehicle Journal
Publisher
MDPI AG
Published
2025-11-20
Volume
16
Issue
11
Pages
636
ISSN
2032-6653 (ISSN-L)
OpenAlex
W4416409851
Cited by
5
References
24
Citations by year
2026: 4 · 2025: 1
FWCI
0.84
Type
journal article
Language
en
Open access
Locations
  • World Electric Vehicle Journal (publishedVersion, cc-by)
  • Preprints.org (submittedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion)
  • Zenodo (CERN European Organization for Nuclear Research) (submittedVersion, cc-by)
Funders
  • EV4EU (101056765)
  • FLOW (101056730)
Topics
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Vehicles and Infrastructure
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Smart Grid Energy Management
  • Physical Sciences › Energy › Energy Engineering and Power Technology › Power Systems and Renewable Energy
Keywords
bidirectional EV charging, grid services, CHAdeMO, response dynamics, primary frequency control, reverse power flow, voltage levels

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

A language model drew the claims from the paper on 2026-11-25, under version 3 of the claim definition (model deepseek-v4.1-flash, prompt extract-v3).

A second model labelled each claim on 2026-11-25 (model jev-1.13-20260917, definition revision gold-guideline-v0.2).

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).