A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
Open accessThe DOI matches its Crossref record.
Abstract
The intense competition between the Iranian construction companies has led them to take all appropriate measures to decrease the costs as much as possible. Hence, due to the pivotal role of human resources in construction projects cost, a major part of Iranian construction companies seek their profitability and survival in maximizing the productivity of their operatives. Because of the widespread belief among contractors about the low productivity of daily workers and operatives with basic salary, they commit a major part of their projects activities to sub-contractors. Deployment of sub-contractors by construction firms has become largely conventional in country's construction projects. The aims of this paper is defined as determining the factors and grounds affecting sub-contractors productivity and evaluate their overall negative side effects on project productivity via a structured questionnaire. A total of 31 factors selected and were divided into 7 broad categories. The perceptions of companies managers were asked about the level of effect brought about by the mentioned factors and groups upon productivity on a time based criterion. The analysis indicated that the most important grounds affecting sub-contractors productivity in descending order include: Materials/Tools, Construction technology and method, Planning, Supervision system, Reworks, Weather, and Jobsite condition. Project managers should focus on the identified major grounds and relevant factors in order to improve productivity as long as they commit construction activities to sub-contractors.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Banihashemi, S., Hosseini, M. R., Golizadeh, H., & Sankaran, S. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.01.014 · Cited by 441
Self-citationIslam, M. S., Nepal, M. P., & Skitmore, M. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001593 · Cited by 60
Hosseini, M. R., Banihashemi, S., Rameezdeen, R., Golizadeh, H., Arashpour, M., & Ma, L. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.08.200 · Cited by 48
“In recent years, developing countries such as Iran have invested substantial amounts of money on construction activities, triggered by rapid economic growth and urbanization (Ghoddousi and Hosseini, 2012; Namini et al., 2013; Gan et al., 2015).”
BackgroundSelf-citation
Metadata
- Authors
- Ghoddousi, P., & Hosseini, M. R.
- Venue
- Technological and Economic Development of Economy
- Published
- 2012-04-10
- Volume
- 18
- Issue
- 1
- Pages
- 99-116
- ISSN
- 1392-8619 (ISSN-L)
- 2029-4913
- 2029-4921
- OpenAlex
- W1987499565
- Cited by
- 175
- References
- 0
- FWCI
- 7.16
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.