Designing Buildings Using Reclaimed Steel Components
Open accessPublished version of a preprint
Abstract
The consumption of non-renewable resources and the creation of wastes have been identified as among the key issues that our society must address in order not to prejudice the opportunities of future generations. Yet the way we design and construct our buildings leads to huge volumes of waste being generated as well as the use of large amounts of materials, the extraction of which leads to considerable environmental damage. So, how can we design buildings in a way that creates closed loop materials systems that minimize waste generation and primary resourse use? The objective of this paper is to review work carried out at Ryerson University in Canada funded by NRCan and CISC to identify ways in which construction can set up reuse loops for steel components so that waste and the demand for primary steel are reduced. In particular, the design and construction issues related to the use of salvaged steel components will be reviewed, through a series of case studies to draw out lessons and conclusions about the implications of component reuse in construction. The case studies are of projects that reuse steel components from old buildings into new buildings. They suggest that opportunities for steel reuse are significant but the industry needs to establish appropriate structures and cyclical systems and methods to ensure that components can be easily reclaimed from old buildings for reuse. Furthermore, certain ingrained industry design processes need to be overcome for reuse of steel (and other components) to become more acceptable.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Integrating reuse in the design process of new projects is one method to increase reuse rates by organizations.
“One method to increase the reuse rates by the organizations is through integrating reuse in the design process of new projects (Gorgolewski, 2008; Gorgolewski et al., 2008; Rogers, 2011; Tingley et al., 2017 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract describes case studies of reusing steel from old buildings in new projects and says ingrained industry design processes must be overcome for reuse to become more acceptable. It supports addressing reuse during design, but does not establish that doing so increases organizations’ reuse rates. (LLM, conf=0.78)
Experimental — accuracy not yet measuredProper estimation of the required sizes and lengths at the beginning of the design phase promotes reuse.
“In projects with recovered building components, the proper estimation of the required sizes and lengths at the beginning of the design phase is reported to promote reuse (Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract says that changing ingrained design processes could make reuse of steel and other components more acceptable. It does not mention estimating required sizes and lengths or doing so at the beginning of the design phase, so the specific recommendation is unsupported by our copy. (LLM, conf=0.72)
Experimental — accuracy not yet measuredReusing recovered components, such as structural components, to serve the same purpose has a positive impact on the success of reuse.
“Some articles advise that reusing the recovered components, such as the structural components, to serve the same purpose (for instance, similar loads) has a positive impact on the success of this intervention (Gorgolewski, 2008; Gorgolewski et al., 2008; Pongiglione and Calderini, 2014).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract (no page given) describes case studies in which salvaged steel components from old buildings are reused in new buildings. It does not say that using components for the same purpose or under similar loads improves the success of reuse. (LLM, conf=0.76)
Experimental — accuracy not yet measuredWith an underdeveloped reuse market, the supply chain remains fragmented and information about supply and demand cannot be shared, which further decreases reuse rates.
“With an underdeveloped reuse market, the supply chain remains fragmented and information about the supply and demand cannot be shared, which further decreases the reuse rates (Gorgolewski et al., 2008; Rameezdeen et al., 2016; Rose and Stegemann, 2018).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract says that steel reuse requires the industry to establish appropriate structures and cyclical systems for reclaiming components. It does not say that the supply chain is fragmented, that supply-and-demand information cannot be shared, or that those conditions decrease reuse rates. (LLM, conf=0.78)
Experimental — accuracy not yet measuredDifficulty in designing with reused components is a barrier to widespread reuse of building components.
“Difficulty in designing with the reused components is another barrier to the widespread reuse of the building components (Brütting et al., 2019; Gorgolewski et al., 2008; Pongiglione and Calderini, 2014; Tingley et al., 2017).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The lower environmental impacts of building components reuse compared with recycling are primarily due to the significantly lower treatment and reprocessing required for building components reuse.
“It is primarily due to the significantly lower treatment and reprocessing required for building components reuse (BCR) in comparison with recycling (Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract says that reusing salvaged steel components could reduce waste and demand for primary steel. Searches for lower treatment or reprocessing and for an energy or environmental-impact comparison with recycling found no passage explaining the claimed difference; the available copy appears to contain only the abstract and site text. (LLM, conf=0.70)
Experimental — accuracy not yet measuredAvailability of information about the characteristics, details, certificates and drawings of recovered building components can positively contribute to increasing reuse rates.
“According to Gorgolewski (2008), Gorgolewski et al. (2008) and Pongiglione and Calderini (2014), the availability of information about the characteristics, details, certificates and drawings of the recovered building components can positively contribute to increasing the reuse rates as well.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al. (2008)
The available Abstract says that steel reuse requires structures, cyclical systems and changes to industry design processes. It does not address whether information about recovered components’ characteristics, details, certificates or drawings increases reuse rates; searches for those terms returned no relevant passage. (LLM, conf=0.68)
Experimental — accuracy not yet measuredIntegrating reuse in contractual requirements will increase reuse rates.
“some articles suggest that by integrating reuse in the contractual requirements, reuse rates will increase (Gorgolewski, 2008; Gorgolewski et al., 2008; MacKinnon, 2000).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract says the industry needs structures and methods that make steel components easier to reclaim, but it does not discuss contractual requirements or say they would increase reuse rates. Searches for contractual requirements and procurement specifications found no passage addressing that mechanism; the available copy does not establish the claim. (LLM, conf=0.72)
Experimental — accuracy not yet measuredDeconstruction instead of demolition can enhance the reusability of the recovered components.
“Based on the reviewed articles, deconstruction instead of demolition can enhance the reusability of the recovered components (Gorgolewski et al., 2008; Hglmeier et al., 2013; Pongiglione and Calderini, 2014; Yeung et al., 2015 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract discusses reclaiming steel components from old buildings for reuse, but does not compare deconstruction with demolition or say which improves the reusability of recovered components. Searches for that comparison and for careful dismantling returned no passage addressing it. (LLM, conf=0.70)
Experimental — accuracy not yet measuredThe design team needs to put in extra efforts to find reused elements, and the design needs to remain as flexible as possible.
“It is because the design team needs to put in extra efforts to find the reused elements (Gorgolewski et al., 2008), and the design needs to remain as flexible as possible (Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract (page not provided) discusses challenges in reusing steel components and the need to overcome established design processes. It does not say that design teams must make extra efforts to find reused elements or keep designs as flexible as possible; searches for both phrases returned no more specific passage. (LLM, conf=0.72)
Experimental — accuracy not yet measuredDeconstruction is believed to be more labour intensive.
“Although deconstruction can increase the reusability of the recovered building components (Addis, 2006; Munroe et al., 2006), it is believed to be more labour intensive (Chileshe et al., 2015; Gorgolewski et al., 2008; Rameezdeen et al., 2016).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract discusses reclaiming and reusing steel components but does not compare the labour required for deconstruction with other methods. Searches for “deconstruction more labour intensive” and “labour labor intensive demolition deconstruction salvage steel” returned only abstract text and site material, so the claim cannot be verified from our copy. (LLM, conf=0.68)
Experimental — accuracy not yet measuredAnother economic barrier to BCR is the higher cost of design with reused components.
“Another economic barrier to the BCR is the higher cost of design with the reused components (Dunant et al., 2017; Gorgolewski, 2008; Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract discusses design-process barriers to reusing steel components, but it does not say that designing with reused components costs more. Searches for higher design costs and economic barriers found no passage addressing that point. (LLM, conf=0.70)
Experimental — accuracy not yet measuredSometimes it is required to purchase identified reused components early in the project to cope with uncertainty about the timely availability of the desired elements.
“Sometimes it is required to purchase the identified reused components early in the project (Gorgolewski, 2008; Gorgolewski et al., 2008) to cope with uncertainty about the timely availability of the desired elements (Chileshe et al., 2015; Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract (no page indicated) discusses design and construction issues in reusing salvaged steel, but does not address buying identified components early or uncertainty about their timely availability. Searches for early purchasing, procurement, and availability returned no passage addressing that point. (LLM, conf=0.72)
Experimental — accuracy not yet measuredThe time required for deconstruction and reuse, and the consequent project scheduling, is one of the main barriers to reuse.
“According to the reviewed articles, the time required for deconstruction and reuse, and the consequent project scheduling, is one of the main barriers to reuse (Dantata et al., 2005; Gorgolewski, 2008; Gorgolewski et al., 2008; MacKinnon, 2000; Shaurette, 2006 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The available Abstract (no page indicated) discusses obstacles to reclaiming and reusing steel, including ingrained design processes, but does not address deconstruction time or project scheduling. Searches for time, scheduling, delays, and barriers returned no passage supporting the specific claim. (LLM, conf=0.72)
Experimental — accuracy not yet measuredDesign of new buildings with reused components needs to remain flexible to accommodate alternative dimensions due to uncertainty in availability of desired sections.
“the design of the new buildings with reused building components needs to remain flexible. This is because the design should be able to accommodate alternative dimensions of the reused components due to the uncertainty in the availability of the desired sections (Gorgolewski, 2008; Gorgolewski et al., 2008).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract discusses design issues in reusing salvaged steel and says ingrained design processes need to be overcome. It does not address flexible dimensions or uncertainty about the availability of desired sections; searches for those terms and for alternative steel-section sizes found no supporting passage in our copy. (LLM, conf=0.72)
Experimental — accuracy not yet measuredOther design challenges include designing with long spans, difference in loading requirements, and mismatch between old spans and new features.
“Other design challenges while reusing recovered building components are designing with long spans (because such elements might not be readily available) (Brütting et al., 2019; Gorgolewski et al., 2008; Huuhka and Hakanen, 2015), difference in the loading requirements of the old and the new buildings (Gorgolewski et al., 2008), and the mismatch between the old spans and the new features (Huuhka”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Gorgolewski et al., 2008
The Abstract (page unavailable) says the paper reviews design issues in reusing salvaged steel, but does not identify long-span availability or differences between old and new loading requirements. Searches for both points returned no passages addressing them. The span-to-feature mismatch is attributed to a different citation in the printed sentence. (LLM, conf=0.70)
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
No references could be resolved yet.
Research works printed but not linked: 3
- Kröll, Kristina Viktoria, Schröder, Torsten, Bekkering, Juliette, and Fivet, Corentin, 2026, "Design with reuse in the architectural design process: practice-based review of changes, challenges, and work routines" Frontiers in Built Environment Vol. 11, 2297-3362
- Ghailani, Hend, Zaidan, A.A., Qahtan, Sarah, Alsattar, Hassan A., Al-Emran, Mostafa, Deveci, Muhammet, and Delen, Dursun, 2023, "Developing sustainable management strategies in construction and demolition wastes using a q-rung orthopair probabilistic hesitant fuzzy set-based decision modelling approach" Applied Soft Computing Vol. 145, pp 110606, 15684946
- Bartsch, Helen, 2025, "Reuse of reclaimed steel components in construction: A systematic review of potential, challenges and future directions" Structures Vol. 80, pp 110057, 23520124
Cited by
Sorted by citations
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 167 · see citing works
“It is primarily due to the significantly lower treatment and reprocessing required for building components reuse (BCR) in comparison with recycling (Gorgolewski et al., 2008).”
BackgroundMethodResultInfluentialReusing concrete panels from buildings for building: Potential in Finnish 1970s mass housing
Huuhka, S., Kaasalainen, T., Hakanen, J. H., & Lahdensivu, J. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.017 · Cited by 82 · see citing works
- Authors
- Gorgolewski, M., Straka, V, Edmonds, J., & Sergio-Dzoutzidis, C.
- Affiliations
- Toronto Metropolitan University (CA)
- Hilditch Architect.
- Morrison Hershfield Consulting Engineers.
- ORCID
- Gorgolewski, M
- Venue
- Journal of Green Building
- Publisher
- College Publishing
- Published
- 2008
- Volume
- 3
- Issue
- 3
- Pages
- 97-107
- ISSN
- 1552-6100 (ISSN-L)
- 1943-4618
- OpenAlex
- W1982364121
- Cited by
- 28
- References
- 0
- Citations by year
- 2026: 2 · 2025: 5 · 2024: 5 · 2023: 4 · 2022: 4 · 2021: 3 · 2020: 1 · 2019: 1 · 2015: 1 · 2012: 2
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- hybrid
- doi.org
- Licence
- Locations
- Journal of Green Building (publishedVersion, cc-by-nc)
- Topics
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Engineering › Building and Construction › Sustainable Design and Development
- Keywords
- construction waste reduction, construction and demolition waste
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review