Damages to reused building components can decrease the quality of the elements and affect their reusability.
“Damages to the reused building components can decrease the quality of the elements and affect their reusability (da Rocha and Sattler, 2009; Durão et al., 2014; Huuhka and Hakanen, 2015; Tatiya et al., 2017).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Permanent joints, composite joints, and hard-to-access connections can negatively affect deconstruction and make recovery of building components challenging.
“which can negatively affect deconstruction and make the recovery of the building components challenging (Huuhka et al., 2015).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka et al., 2015
Additional health and safety precautions necessary for deconstruction, component recovery, and reuse are technical barriers to reuse.
“Additional health and safety precautions necessary for deconstruction, component recovery, and reuse are some other technical barriers to reuse (Chileshe et al., 2015, 2016a; Huuhka and Hakanen, 2015; Rameezdeen et al., 2016; Sansom and Avery, 2014; Tingley et al., 2017; Yeung et al., 2015).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Damages to reused components can result from corrosion, post-production modifications, water, weather, fire, refurbishment, living organisms, fatigue, frost, degradation, type of joints, and storage/transportation.
“Damages can also happen as the result of corrosion (Chini and Acquaye, 2001; Huuhka et al., 2015; Yeung et al., 2015), post-production modifications (holes for ductwork, etc.) (Chini and Acquaye, 2001; Yeung et al., 2015), presence of water (Yeung et al., 2015; Tatiya et al., 2017), exposure to weather conditions (Huuhka and Hakanen, 2015), fire (Yeung et al., 2015; Tatiya et al., 2017), refurbis”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Lack of demand or uncertainty about the need for reused components causes scepticism about revenue from reused components resale.
“In contrast, lack of demand (Chileshe et al., 2016b; Huuhka and Hakanen, 2015; Rogers, 2011; Shaurette, 2006; Tingley et al., 2017) or uncertainty about the need for the reused components (Rose and Stegemann, 2018) causes scepticism about the revenue from the reused components resale (Chileshe et al., 2016a; Dunant et al., 2018; Rose and Stegemann, 2018; Yeung et al., 2015).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Other design challenges include designing with long spans, difference in loading requirements, and mismatch between old spans and new features.
“Other design challenges while reusing recovered building components are designing with long spans (because such elements might not be readily available) (Brütting et al., 2019; Gorgolewski et al., 2008; Huuhka and Hakanen, 2015), difference in the loading requirements of the old and the new buildings (Gorgolewski et al., 2008), and the mismatch between the old spans and the new features (Huuhka”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Unknown remaining capacity happens when information about characteristics, details, certificates and drawings of reused components are not available.
“The latter happens when the information about the characteristics, details, certificates and drawings of the reused components are not available (Gorgolewski, 2008; Gorgolewski et al., 2008; Huuhka and Hakanen, 2015; Rose and Stegemann, 2018; Tingley et al., 2017; Yeung et al., 2015).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Overdesign is because of lower strength of reused components or unknown remaining capacity of reused components.
“This is either because of the lower strength of the reused components or that the remaining capacity of the reused components is unknown (Huuhka and Hakanen, 2015; Yeung et al., 2015).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Negative perception of stakeholders about reused building components can act as a barrier to reuse.
“The negative perception of the stakeholders about the reused building components can act as a barrier to reuse (Chileshe et al., 2015, 2016a; Huuhka and Hakanen, 2015, Klang et al., 2003, MacKinnon, 2000, Rameezdeen et al., 2016 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
If the client does not support reuse, there is a much smaller chance that designers or contractors will risk the project by introducing reused components.
“However, if the client does not support reuse (Huuhka and Hakanen, 2015; Rameezdeen et al., 2016; Rose and Stegemann, 2018; Tingley et al., 2017), there is a much smaller chance that the designers or contractors will risk the project by introducing such components.”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Existing regulations do not support deconstruction and reuse.
“One of the challenges ahead of reuse is that the existing regulations do not support deconstruction and reuse (Chileshe et al., 2015, 2016b; Gorgolewski, 2008, Hglmeier et al., 2013; Huuhka and Hakanen, 2015; Huuhka et al., 2015; Rameezdeen et al., 2016 (among others)).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Stakeholders are unaware of the full benefits of deconstruction and reuse.
“One reason for such reluctance is because the stakeholders are unaware of the full benefits of deconstruction and reuse (Chileshe et al., 2015, 2016b; Gorgolewski, 2008; Huuhka and Hakanen, 2015; Rameezdeen et al., 2016).”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
There are concerns regarding adverse effects of reuse due to increased GHG emissions related to deconstruction activities and transportation of recovered elements.
“Although component reuse is identified as a sustainable end-of-life treatment of the superstructure of a building (Brütting et al., 2019; Klang et al., 2003; Tingley et al., 2017; Yeung et al., 2017), there are concerns regarding the adverse effects of this practise due to the increased GHG emissions related to deconstruction activities and the transportation of recovered elements (Brambilla et al”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huuhka and Hakanen, 2015
Ideas for reusing concrete panels from the walls of pre-fabricated buildings have been proposed, but potentials and issues are not yet well understood.
“Ideas for reusing concrete panels from the walls of pre-fabricated buildings have been proposed [87], but potentials and issues are not yet well understood.”
From Material efficiency strategies to reducing greenhouse gas emissions associated with buildings, vehicles, and electronics—a review (2019) · cites this paper as [87]
Cites
Designing with reused building components: some challenges
Gorgolewski, M. (2008) · Building Research & Information · doi:10.1080/09613210701559499 · Cited by 220 · see citing works
Harvesting urban resources towards more resilient cities
Agudelo-Vera, C., Leduc, W. R. W. A., Mels, A. R., & Rijnaarts, H. H. M. (2012) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2012.01.014 · Cited by 178 · see citing works
Understanding obsolescence: a conceptual model for buildings
Thomsen, A. F., & van der Flier, K. (2011) · Building Research & Information · doi:10.1080/09613218.2011.576328 · Cited by 132 · see citing works
da Rocha, C. G., & Sattler, M. A. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.07.004 · Cited by 126 · see citing works
Hiete, M., Stengel, J., Ludwig, J., & Schultmann, F. (2011) · Building Research & Information · doi:10.1080/09613218.2011.576849 · Cited by 116 · see citing works
(2006) · Cited by 110 · see citing works
Statistical and geographical study on demolished buildings
Huuhka, S., & Lahdensivu, J. (2014) · Building Research & Information · doi:10.1080/09613218.2014.980101 · Cited by 96 · see citing works
Self-citationMaterial savings through structural steel reuse: A case study in Genoa
Pongiglione, M., & Calderini, C. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2014.02.011 · Cited by 69 · see citing works
Durability demands related to frost attack for Finnish concrete buildings in changing climate
Pakkala, T. A., Köliö, A., Lahdensivu, J., et al. (2014) · Building and Environment · doi:10.1016/j.buildenv.2014.07.028 · Cited by 57 · see citing works
Self-citationHousing stock shrinkage: vacancy and demolition trends in Germany
Deilmann, C., Effenberger, K.-H., & Banse, J. (2009) · Building Research & Information · doi:10.1080/09613210903166739 · Cited by 41 · see citing works
Homogenous homes of Finland: ‘standard’ flats in non-standardized blocks
Kaasalainen, T., & Huuhka, S. (2015) · Building Research & Information · doi:10.1080/09613218.2015.1055168 · Cited by 28 · see citing works
Self-citationDesigning Buildings Using Reclaimed Steel Components
Gorgolewski, M., Straka, V, Edmonds, J., & Sergio-Dzoutzidis, C. (2008) · Journal of Green Building · doi:10.3992/jgb.3.3.97 · Cited by 28 · see citing works
Durability Properties and Actual Deterioration of Finnish Concrete Facades and Balconies
Lahdensivu, J. (2012) · Tampere University Institutional Repository (Tampere University) · Cited by 24 · see citing works
Self-citationCorrosion of Reinforcement in Existing Concrete Façades
Lahdensivu, J., Mäkelä, H. M., & Pirinen, P. (2013) · Building pathology and rehabilitation · doi:10.1007/978-3-642-37475-3_10 · Cited by 10 · see citing works
Self-citationReuse of hollow core slabs from office buildings to residential buildings
Naber, N. (2012) · Research Repository (Delft University of Technology) · Cited by 5 · see citing works
The "Donor Skelet": Designing with reused structural concrete elements
Glias, A. (2013) · Research Repository (Delft University of Technology) · Cited by 5 · see citing works
De kop is eraf: Evaluatie van de aftopping van een flat in Middelburg
Coenen, M., Lentz, G., & Prak, N. L. (1990) · Research Repository (Delft University of Technology) · Cited by 3 · see citing works
Lahdensivu, J., Tietäväinen, H., & Pirinen, P. (2011) · Nordic Concrete Research/Nordic concrete research · Cited by 2 · see citing works
Self-citation
Flagged first, then by citations
Cited by
Sorted by citations
Hertwich, E. G., Ali, S., Ciacci, L., Fishman, T., Heeren, N., Masanet, E., Asghari, F. N., Olivetti, E., Pauliuk, S., Tu, Q., et al. (2019) · Environmental Research Letters · doi:10.1088/1748-9326/ab0fe3 · Cited by 477 · see citing works
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 167 · see citing works
“Damages can also happen as the result of corrosion (Chini and Acquaye, 2001; Huuhka et al., 2015; Yeung et al., 2015), postproduction modifications (holes for ductwork, etc.) (Chini and Acquaye, 2001; Yeung et al., 2015), presence of water (Yeung et al., 2015; Tatiya et al., 2017), exposure to…”
BackgroundInfluentialCharacterising existing buildings as material banks (E-BAMB) to enable component reuse
Rose, C. M., & Stegemann, J. A. (2019) · Proceedings of the Institution of Civil Engineers - Engineering Sustainability · doi:10.1680/jensu.17.00074 · Cited by 78 · see citing works
- Authors
- Huuhka, S., Kaasalainen, T., Hakanen, J. H., & Lahdensivu, J.
- Affiliations
- Tampere University of Technology (FI)
- Corresponding author
- Huuhka, S.
- Venue
- Resources, Conservation and Recycling
- Publisher
- Elsevier BV
- Published
- 2015-08
- Volume
- 101
- Pages
- 105-121
- ISSN
- 0921-3449 (ISSN-L)
- OpenAlex
- W642396393
- Cited by
- 82
- References
- 18
- Citations by year
- 2026: 9 · 2025: 13 · 2024: 12 · 2023: 5 · 2022: 11 · 2021: 7 · 2020: 10 · 2019: 1 · 2018: 6 · 2017: 2 · 2016: 6
- FWCI
- 6.35
- Type
- journal article
- Language
- en
- Open access
- green
- trepo.tuni.fi
- Licence
- Locations
- Resources Conservation and Recycling (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Tampere University Institutional Repository (Tampere University) (submittedVersion, cc-by-nc-nd)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- precast concrete panels, mass housing, hollow core slabs, precast concrete construction, building demolition, concrete waste, Waste Framework Directive, single-family house, architectural design
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review