The DOI matches its Crossref record; 50 of the 51 references it cites were found in a registry or an index.
Developing strategies for managing construction and demolition wastes in Malaysia based on the concept of circular economy
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“For CDWW, recycling practices are still inefficient, resulting in a tremendous amount of wood waste being dumped into landfills legally or illegally without environmental protection [89].”
From Circular Economy of Construction and Demolition Wood Waste—A Theoretical Framework Approach (2022) · cites this paper as [89]
Citations
Cites
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
Creswell, J. W. (1994) · Cited by 35,213
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
Sloane-Seale, A. (2009) · Canadian Journal of University Continuing Education · doi:10.21225/d54s3d · Cited by 14,328
Analyzing the Past to Prepare for the Future: Writing a Literature Review
Webster, J., & Watson, R. T. (2002) · MIS Quarterly · doi:10.2307/4132319 · Cited by 7,449
The Circular Economy: A New Development Strategy in China
Yuan, Z., Bi, J., & Moriguichi, Y. (2006) · Journal of Industrial Ecology · doi:10.1162/108819806775545321 · Cited by 1,175
(2007) · Choice Reviews Online · doi:10.5860/choice.44-3366 · Cited by 921
Towards a national circular economy indicator system in China: an evaluation and critical analysis
Geng, Y., Fu, J., Sarkis, J., & Xue, B. (2011) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2011.07.005 · Cited by 919
Geng, Y., & Doberstein, B. (2008) · International Journal of Sustainable Development & World Ecology · doi:10.3843/susdev.15.3:6 · Cited by 859
Solid wastes generation in India and their recycling potential in building materials
Pappu, A., Saxena, M., & Asolekar, S. R. (2006) · Building and Environment · doi:10.1016/j.buildenv.2006.04.015 · Cited by 795
Systematic Reviews from Astronomy to Zoology: Myths and Misconceptions
Petticrew, M. (2001) · BMJ · doi:10.1136/bmj.322.7278.98 · Cited by 550
Architects’ perspectives on construction waste reduction by design
Osmani, M., Glass, J., & Price, A. D. F. (2007) · Waste Management · doi:10.1016/j.wasman.2007.05.011 · Cited by 496
Research works printed but not linked: 7
- Ping TS, Omran A, Pakir AHK (2009) Material waste in the malaysian construction industry. In: The International Conference on Economics and Administration, Faculty of Administration and Business
- Ekanayake LL, Ofori G (2000) Construction material waste source evaluation. In: Proceedings: Strategies for a Sustainable Built Environment, Pretoria, pp 23–25
- Preston F (2012) A global redesign? shaping the circular economy. Energy environment and resource governance. Chatham House, London
- Zhu DJ, Huang XF (2005) Building up a model for circular economy based on object, main body, and policy. Naikai Acad J 4:86–93
- Department of Statistics (2015) Quarterly construction statistics 2015. Department of Statistics, Editor. Malaysia
- Abdullah S, Abdul Razak A, Bakar A, Hassan A, Sarrazin I (2009) Towards producing best practice in the Malaysian construction industry: The Barriers in implementing the lean construction approach. In: International Conference of Construction Industry, 30 July 2009–1 August 2009. Padang, Indonesia
- CIDB (2003) IBS roadmap (2003–2010). Construction Industry Development Board (CIDB), Kuala Lumpur
Cited by
Sorted by citations
Items 101–200 of 276
Circular economy business model in the construction industry: a systematic review
Jayakodi, S., Senaratne, S., & Perera, S. (2024) · Buildings · doi:10.3390/buildings14020379 · Cited by 33
Ranasinghe, N., Domingo, N., & Kahandawa, R. (2024) · Journal of Building Engineering · doi:10.1016/j.jobe.2024.111136 · Cited by 33
Brandão, R., Hosseini, M. R., Macêdo, A. N., Melo, A. C. S., & Martek, I. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2020-0547 · Cited by 33
Asante, R., Agyemang, M., Faibil, D., & Osei‐Asibey, D. (2021) · Sustainable Production and Consumption · doi:10.1016/j.spc.2021.11.028 · Cited by 33
Circular economy in Brazilian construction industry: Current scenario, challenges and opportunities
Hentges, T. I., da Motta, E. A. M., Fantin, T. V. D. L., Moraes, D., Fretta, M. A., Pinto, M. F., & Böes, J. S. (2021) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x211045014 · Cited by 36
Alite, M., Abu-Omar, H., Agurcia, M. T., Jácome, M., Kenney, J., Tapia, A., & Siebel, M. A. (2023) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-022-01577-5 · Cited by 30
“Estimating the recoverable value of in-situ building materials”
Mollaei, A., Bachmann, C., & Haas, C. T. (2023) · Sustainable Cities and Society · doi:10.1016/j.scs.2023.104455 · Cited by 32
Rajaratnam, D., Stewart, R. A., Liu, T., & Vieira, A. S. (2023) · Resources Conservation & Recycling Advances · doi:10.1016/j.rcradv.2023.200144 · Cited by 32
Review of energy recovery from construction and demolition waste in Australia
Shooshtarian, S., Maqsood, T., Wong, P. S. P., Khalfan, M. M. A., & Yang, R. J. (2019) · Journal of Construction Engineering Management & Innovation · doi:10.31462/jcemi.2019.03112130 · Cited by 30
Developing a Hybrid Fuzzy Decision-Making Model for Sustainable Circular Contractor Selection
Koc, K., Ekmekcioğlu, Ö., & Işık, Z. (2023) · Journal of construction engineering and management · doi:10.1061/jcemd4.coeng-13305 · Cited by 18
Strategies for Enhancing Construction Waste Recycling: A Usability Analysis
Omer, M. M., Rahman, R. A., & Almutairi, S. (2022) · Sustainability · doi:10.3390/su14105907 · Cited by 28
Devaki, H., & Shanmugapriya, S. (2023) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-023-01631-w · Cited by 28
Sustainable Management of the Built Environment from the Life Cycle Perspective
Hill, W., Jalloul, H., Movahedi, M., & Choi, J. (2023) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-4759 · Cited by 29
Haque, S. E., Nahar, N., & Haque, M. S. (2024) · Environmental Monitoring and Assessment · doi:10.1007/s10661-024-12329-3 · Cited by 27
Terán-Valdez, A., & Guayasamin, J. M. (2010) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.195110 · Cited by 27
Sustainable waste management in the construction industry
Shajidha, H., & Mortula, M. M. (2025) · Frontiers in Sustainable Cities · doi:10.3389/frsc.2025.1582239 · Cited by 40
Zero Waste Systems: Barriers and Measures to Recycling of Construction and Demolition Waste
Abarca-Guerrero, L., Lobo-Ugalde, S., Méndez-Carpio, N., Rodríguez-Leandro, R., & Rudín-Vega, V. (2022) · Sustainability · doi:10.3390/su142215265 · Cited by 27
Swarnakar, V., & Khalfan, M. M. A. (2024) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-08-2024-0284 · Cited by 25
Nežerka, V., Prošek, Z., Trejbal, J., Pešta, J., Ferriz-Papi, J. A., & Tesárek, P. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.135711 · Cited by 25
Local scale dynamics to promote the sustainable management of construction and demolition waste
Ramos, M., Martinho, G., Vasconcelos, L. T., & Ferreira, F. (2023) · Resources Conservation & Recycling Advances · doi:10.1016/j.rcradv.2023.200135 · Cited by 25
Ghisellini, P., & Ulgiati, S. (2020) · Elsevier eBooks · doi:10.1016/b978-0-12-819055-5.00003-6 · Cited by 24
Making a case for sustainable building materials to promote carbon neutrality in Indian scenario
Sudarsan, J. S., Vaishampayan, S., & Parija, P. P. (2022) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-021-02251-4 · Cited by 24
Bottle house: utilising appreciative inquiry to develop a user acceptance model
Adefila, A., Abuzeinab, A., Whitehead, T., & Oyinlola, M. A. (2020) · Built Environment Project and Asset Management · doi:10.1108/bepam-08-2019-0072 · Cited by 23
Salleh, H., Ying, C. K., Hanid, M., Abdul-Samad, Z., Sabli, N. A. M., & Khuzzan, S. M. S. (2022) · PLANNING MALAYSIA · doi:10.21837/pm.v20i24.1216 · Cited by 23
Mohammed, M., Shafiq, N., Al‐Mekhlafi, A. A., Al‐Fakih, A., Zawawi, N. A. W. A., Mohamed, A. M., Khallaf, R., Abualrejal, H. M., Shehu, A. A., & Al-Nini, A. (2022) · Sustainability · doi:10.3390/su14063410 · Cited by 24
Kazmi, R., & Chakraborty, M. (2023) · Journal of Engineering and Applied Science · doi:10.1186/s44147-023-00251-3 · Cited by 26
Application of circular economy in the Indonesia construction industry
Adi, T. J. W., & Wibowo, P. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/849/1/012049 · Cited by 21
Górecki, J., & Núñez-Cacho, P. (2022) · Applied Sciences · doi:10.3390/app12126132 · Cited by 17
Soyinka, O. A., Jayantha, W. M., Abeydeera, L. H. U. W., & Oladinrin, O. T. (2022) · Environment Development and Sustainability · doi:10.1007/s10668-022-02537-7 · Cited by 23
Boonkanit, P., & Suthiluck, K. (2023) · Sustainability · doi:10.3390/su15129672 · Cited by 20
Wu, H., Chen, R., Yuan, H., Yong, Q., Weng, X., Zuo, J., & Zillante, G. (2024) · Waste Management · doi:10.1016/j.wasman.2024.04.047 · Cited by 20
Dräger, P., & Letmathe, P. (2023) · Sustainability · doi:10.3390/su15097110 · Cited by 23
Victar, H. C., & Waidyasekara, A. S. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-06-2023-0608 · Cited by 19
Wikurendra, E. A., Fertő, I., Nagy, I. V., & Nurika, G. (2022) · Environmental Quality Management · doi:10.1002/tqem.21846 · Cited by 19
Victar, H. C., & Waidyasekara, K. G. A. S. (2023) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x231206988 · Cited by 33
Shukla, B. K., Yadav, H., Singh, S. P., Verma, S., Shukla, A. K., & Sharma, C. (2025) · Construction Materials · doi:10.3390/constrmater5030067 · Cited by 20
The Need for a Proper Waste Management Plan for the Construction Industry: A Case Study in Lebanon
Saad, A. N., Bal, M., & Khatib, J. (2022) · Sustainability · doi:10.3390/su141912783 · Cited by 18
Keena, N., Rondinel-Oviedo, D. R., Acevedo-De-los-Ríos, A., Sarmiento-Pastor, J., Lira-Chirif, A., Raugei, M., & Dyson, A. H. (2023) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2023.100684 · Cited by 19
Nikolaou, I. E., & Stefanakis, A. I. (2021) · Elsevier eBooks · doi:10.1016/b978-0-12-819817-9.00001-6 · Cited by 18
Construction and demolition waste management in Australia: A mini-review
Zhao, X., Webber, R. J., Kalutara, P., Browne, W. R., & Pienaar, J. (2022) · Figshare · Cited by 18
Preliminary Study on the GWP Benchmark of Office Buildings in Poland Using the LCA Approach
Rucińska, J., Komerska, A., & Kwiatkowski, J. (2020) · Energies · doi:10.3390/en13133298 · Cited by 17
Nguyen, T. L., Tuấn, N. V., Nguyen, H. G., Matsuno, A., Sakanakura, H., & Kawamoto, K. (2022) · Sustainability · doi:10.3390/su14084854 · Cited by 17
Metinal, Y. B., & Ayalp, G. G. (2025) · Sustainability · doi:10.3390/su17041381 · Cited by 19
Gembali, V., Kumar, A., & Sarma, P. R. S. (2024) · Annals of Operations Research · doi:10.1007/s10479-024-05864-2 · Cited by 22
Masseck, T., Viviana, O. P., Habibi, S. R., & Pons, O. (2024) · Journal of Building Engineering · doi:10.1016/j.jobe.2024.109024 · Cited by 16
Ha, H. T., Huong, N. T., Lee, B., Đức, Đ. S., Dan, L. L., Trung, V. B., Kiên, T. T., Anh, N. H., Minh, N. Q., & Minh, T. D. (2020) · Research on Chemical Intermediates · doi:10.1007/s11164-020-04238-0 · Cited by 15
Different Waste Management Methods, Applications, and Limitations
Barati, B., Zafar, F. F., & Wang, S. (2022) · Springer eBooks · doi:10.1007/978-3-030-91570-4_2 · Cited by 16
Strieder, H. L., Schreinert, G. G., Matuella, M. F., Fedrigo, W., Delongui, L., Rutzen, D., & Núñez, W. P. (2023) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2023.133698 · Cited by 15
Schleier, J., & Walther, G. (2024) · International Journal of Production Research · doi:10.1080/00207543.2024.2302041 · Cited by 16
Tleuken, A., Orel, D., Iskakova, A., Varol, H. A., & Karaca, F. (2024) · Journal of Industrial Ecology · doi:10.1111/jiec.13502 · Cited by 15
Tetteh, F. K., Kwateng, K. O., & Yeboah, H. O. (2025) · Property Management · doi:10.1108/pm-09-2024-0096 · Cited by 14
Шевченко, Т., Çetin, S., Yannou, B., Kirchherr, J., & Saidani, M. (2025) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2025.146478 · Cited by 17
Applying EU Level(s) framework indicators to improve circularity: A case study
Honic, M., & Wolf, C. D. (2023) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1196/1/012041 · Cited by 14
Ding, Z., Wen, X., Teng, Y., & Wu, H. (2025) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2025.108161 · Cited by 13
Circular economy design strategies in mass timber construction: a systematic literature review
Abad, F., Rameezdeen, R., & Chileshe, N. (2024) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-05-2024-0183 · Cited by 17
Environmental impact assessment framework for product packaging
Singh, S., Kumar, J., & Rao, P. V. (2018) · Management of Environmental Quality An International Journal · doi:10.1108/meq-10-2017-0105 · Cited by 13
Estimating the use of materials and their GHG emissions in the German building sector
Rheude, F., & Röder, H. (2022) · Cleaner Environmental Systems · doi:10.1016/j.cesys.2022.100095 · Cited by 13
Environmental indicators proposal for construction solid waste management plans assessment
Filho, J. A. P., Bezerra, C. M. D. S., & Dias, A. G. (2020) · Management of Environmental Quality An International Journal · doi:10.1108/meq-07-2019-0153 · Cited by 12
Balanay, R., Varela, R., & Halog, A. B. (2022) · Circular Economy and Sustainability · doi:10.1016/b978-0-12-821664-4.00016-9 · Cited by 10
Self-citationWaste-Energy-Climate Nexus Perspective Towards Circular Economy: A Mini-Review
Manaf, N. A., Shadzalli, Z. F. M., & Kamaruzaman, N. (2022) · Journal of Advanced Research in Applied Sciences and Engineering Technology · doi:10.37934/araset.26.1.3141 · Cited by 12
McNeil-Ayuk, N., & Jrade, A. (2024) · Open Journal of Civil Engineering · doi:10.4236/ojce.2024.142009 · Cited by 15
Kouka, D., Cardinali, G. D., Messina, G., & Barreca, F. (2025) · Results in Engineering · doi:10.1016/j.rineng.2025.105150 · Cited by 10
Durability Performance of Concrete Debris and Bottom Ash as an Alternative Track Ballast Material
Youventharan, D., Ramandhansyah, P. J., Jeevithan, K. M., Rokiah, O., Arif, S. M., & Yaacob, H. (2021) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/682/1/012053 · Cited by 10
Marinho, A. J. C., Couto, J. P., & Camões, A. F. (2022) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2022.16447 · Cited by 10
Use of construction and demolition solid wastes for basket gabion filling
Filho, J. A. P., Camelo, D. G., de CARVALHO, D., Dias, A. G., & Versolatto, B. A. M. (2020) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20922591 · Cited by 9
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2021) · The World Conference on Waste Management · doi:10.17501/26510251.2021.1102 · Cited by 10
Ali, N. H. S. M., Lee, Y. S., Alias, A. R., & Rahman, R. A. (2024) · PLANNING MALAYSIA · doi:10.21837/pm.v22i32.1497 · Cited by 10
Wheels Within Wheels: Mapping the Genealogy of circular Economy using Machine Learning
Hachaichi, M., & Bourdin, S. (2023) · Circular Economy and Sustainability · doi:10.1007/s43615-023-00260-7 · Cited by 8
Pagotto, M., Halog, A., Costa, D. F. A., & Lu, T. (2021) · Environmental footprints and eco-design of products and processes · doi:10.1007/978-981-16-4562-4_2 · Cited by 9
Self-citationRisk Level of Design and Procurement Factors Causing Construction Waste Generation
Bachayo, A., Memon, A. H., Hussain, M., Rahman, I. B. A., & Ahmed, S. J. (2022) · Journal of Applied Engineering Sciences · doi:10.2478/jaes-2022-0002 · Cited by 8
Barriers and Enablers Towards Integrating Circular Economy in the Construction Industry in India
Kazmi, R., & Chakraborty, M. (2025) · Journal of The Institution of Engineers (India) Series A · doi:10.1007/s40030-025-00888-8 · Cited by 9
Haque, S. E., Nahar, N., Chowdhury, N. N., Gazi-Khan, L., Sayanno, T. K., Muktadir, M. A., & Haque, M. S. (2025) · Environmental Monitoring and Assessment · doi:10.1007/s10661-025-14081-8 · Cited by 9
Green building practices: a literature review of barriers and solutions for sustainable development
Tetteh, F. K., & Kwateng, K. O. (2025) · Journal of Facilities Management · doi:10.1108/jfm-10-2024-0126 · Cited by 7
Rayhan, D. S. A., & Bhuiyan, I. U. (2024) · International Journal of Construction Management · doi:10.1080/15623599.2024.2337083 · Cited by 8
A Project Life-Cycle Readiness Approach to Manage Construction Waste in Jordan
Zighan, S. M., & Abualqumboz, M. (2021) · Construction Economics and Building · doi:10.5130/ajceb.v21i3.7628 · Cited by 7
Sustainable use of construction and demolition wastes in a circular economy perspective
Koda, E., & Podlasek, A. (2023) · Elsevier eBooks · doi:10.1016/b978-0-323-95278-1.00027-9 · Cited by 7
The need to improve current waste management practices in the area of construction waste reduction
Mbadugha, L. C., Ozumba, A. O. U., & Shakantu, W. M. (2021) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/654/1/012008 · Cited by 10
Chokshi, H., Agrawal, R., Samadhiya, A., & Kumar, A., V (2023) · International Journal of Mathematical Engineering and Management Sciences · doi:10.33889/ijmems.2023.8.6.061 · Cited by 8
Construction waste reduction measures for high-rise buildings in India – a stakeholder’s perspective
Viswalekshmi, B. R., & Bendi, D. (2024) · Construction Innovation · doi:10.1108/ci-09-2023-0228 · Cited by 6
Aftab, U., Aslam, M., Ulhaq, A., Jaleel, F., Malik, M. S. A., & Zahoor, H. (2025) · PLoS ONE · doi:10.1371/journal.pone.0322295 · Cited by 6
Jacob, C., Nandra, A., & Gupta, J. (2024) · Circular Economy and Sustainability · doi:10.1007/s43615-024-00466-3 · Cited by 6
Overcoming Challenges Associated with Circular Economy in Real Estate Development
Owojori, O. M., & Okoro, C. S. (2022) · Springer eBooks · doi:10.1007/978-3-030-90973-4_5 · Cited by 6
Strategies for Enhancing Construction Waste Recycling: A Fuzzy Synthetic Evaluation
Omer, M. M., Rahman, R. A., & Almutairi, S. (2022) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784483978.069 · Cited by 6
Prioritising materials procurement and construction waste management attributes
Chidiobi, C. C., Booth, C. A., & Lamond, J. E. (2023) · Proceedings of the Institution of Civil Engineers - Waste and Resource Management · doi:10.1680/jwarm.22.00013 · Cited by 7
Knowledge management approach for sustainable waste management: evolving a conceptual framework
Abila, B., Abila, N., & Kantola, J. (2023) · International Journal of Environment and Waste Management · doi:10.1504/ijewm.2023.130546 · Cited by 6
Shrinidhi, D., Adarsh, K. L., Mamatha, K. H., & Dinesh, S. V. (2025) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-025-02172-0 · Cited by 5
Economia circular: o caso dos resíduos da construção civil caririense
Alves, J. L., Borges, I. B., Ramos, M. A., de Nadae, J., & Grangeiro, R. D. R. (2020) · Revista Produção Online · doi:10.14488/1676-1901.v20i2.3825 · Cited by 5
Victar, H. C., & Waidyasekara, K. G. A. S. (2023) · World Construction Symposium (WCS) · doi:10.31705/wcs.2023.33 · Cited by 5
Construction and Demolition Waste and Its Management Challenges in Iran: A Case Study in Tabriz City
Taghipour, H., Taghizadeh, R., Dehghanzadeh, R., Jafarabadi, M. A., Mohammadi, M. M., & Ghayebzadeh, M. (2019) · Health Scope · doi:10.5812/jhealthscope.62313 · Cited by 5
Assessment on the Circular Economy for Waste Minimization in the Construction Industry
Esa, M. R., EDWARD, W. A. S. E. S., & Halog, A. (2021) · Built Environment Journal · doi:10.24191/bej.v18i2.13695 · Cited by 5
Self-citationCaldera, S., Ryley, T. J., & Zatyko, N. (2020) · Griffith Research Online · Cited by 5
Nguyen, P. H., Cao, Q. K. N., & Bui, L. T. (2022) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/964/1/012015 · Cited by 6
Cossar, L. C., Hytten, K. F., Hannon, J., & Mercader, F. D. M. (2026) · Cleaner Production Letters · doi:10.1016/j.clpl.2025.100115 · Cited by 4
Rajendran, R., & Shanmugavel, N. (2025) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-025-02223-6 · Cited by 4
Xiong, Y., Liu, H., Li, D., Xie, W., Wang, Z., Fang, X., Wang, J., Chen, W., Du, X., Li, Y., et al. (2025) · Agriculture · doi:10.3390/agriculture15131386 · Cited by 4
Urbinati, A., Chiaroni, D., Maccarrone, P., Petruzzelli, A. M., & Frattini, F. (2022) · Corporate Social Responsibility and Environmental Management · doi:10.1002/csr.2294 · Cited by 4
Circular economy and construction demolition waste management: a scientometric perspective
Bhavsar, V., Sridharan, S. R., Sudarsan, J. S., Gedam, V. V., & Padhan, H. (2025) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-07-2024-0261 · Cited by 5
Kanno, R., Waskow, R. P., & Tubino, R. M. C. (2020) · MIX Sustentável · doi:10.29183/2447-3073.mix2020.v6.n1.67-75 · Cited by 4
A review of the causes of construction waste generation in Nigeria and recommendations
Chidiobi, C. C., Booth, C. A., & Lamond, J. E. (2021) · Proceedings of the Institution of Civil Engineers - Waste and Resource Management · doi:10.1680/jwarm.20.00020 · Cited by 7
Victar, H. C., & Waidyasekara, K. G. A. S. (2023) · Lecture notes in civil engineering · doi:10.1007/978-981-99-3471-3_27 · Cited by 5
Metadata
- Authors
- Esa, M. R., Halog, A., & Rigamonti, L.
- Affiliations
- The University of Queensland (AU)
- Politecnico di Milano (IT)
- Corresponding author
- Esa, Mohd Reza
- Venue
- Journal of Material Cycles and Waste Management
- Published
- 2016-06-01
- Volume
- 19
- Issue
- 3
- Pages
- 1144-1154
- ISSN
- 1438-4957 (ISSN-L)
- 1611-8227
- OpenAlex
- W2460974938
- Cited by
- 275
- References
- 51
- Citations by year
- 2026: 18 · 2025: 35 · 2024: 33 · 2023: 49 · 2022: 40 · 2021: 42 · 2020: 32 · 2019: 11 · 2018: 7 · 2017: 6 · 2016: 1
- FWCI
- 9.16
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Journal of Material Cycles and Waste Management (publishedVersion)
- Virtual Community of Pathological Anatomy (University of Castilla La Mancha) (submittedVersion)
- Funders
- Universiti Teknologi MARA
- Kementerian Pendidikan Malaysia
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Keywords
- construction and demolition waste, circular economy, waste minimization, waste management strategy, theoretical framework, stakeholder interaction, environmental impact mitigation, Malaysia
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review