The DOI matches its Crossref record; 28 of the 28 references it cites were found in a registry or an index.
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Concept of a Linguistic Variable and Its Application to Approximate Reasoning—I
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90036-5 · Cited by 12,187
The concept of a linguistic variable and its application to approximate reasoning-III
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90017-1 · Cited by 12,139
Multiple Attribute Decision Making
Hwang, C.-L., & Yoon, K. (1981) · Lecture Notes in Economics and Mathematical Systems · doi:10.1007/978-3-642-48318-9 · Cited by 8,526
Fuzzy Logic with Engineering Applications
Ross, T. J. (2010) · Wiley eBooks · doi:10.1002/9781119994374 · Cited by 6,597
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP
Kutlu, A. C., & Ekmekçioğlu, M. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.06.044 · Cited by 594
Identifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537
Fuzzy hierarchical TOPSIS for supplier selection
Wang, J.-W., Cheng, C., & Huang, K.-C. (2008) · Applied Soft Computing · doi:10.1016/j.asoc.2008.04.014 · Cited by 504
Risk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445
A fuzzy AHP approach to personnel selection problem
Güngör, Z., Serhadlıoğlu, G., & Kesen, S. E. (2008) · Applied Soft Computing · doi:10.1016/j.asoc.2008.09.003 · Cited by 401
A proposal for construction project risk assessment using fuzzy logic
Tah, J. H. M., & Carr, V. (2000) · Construction Management and Economics · doi:10.1080/01446190050024905 · Cited by 374
Chapman, R. J. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00070-8 · Cited by 352
A combined methodology for supplier selection and performance evaluation
Zeydan, M., Çolpan, C., & Çobanoğlu, C. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.08.064 · Cited by 331
Risk and its management in the Kuwaiti construction industry: a contractors’ perspective
Kartam, N. A., & Kartam, S. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00014-4 · Cited by 249
Risk Management Perceptions and Trends of U.S. Construction
Kangari, R. (1995) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1995)121:4(422 · Cited by 203
Risks faced by Singapore firms when undertaking construction projects in India
Ling, F. Y. Y., & Hoi, L. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.003 · Cited by 190
Risk management in the conceptual phase of a project
Uher, T. E., & Toakley, A. R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00024-6 · Cited by 175
Fuzzy inference to risk assessment on nuclear engineering systems
Guimarães, A. C. F., & Lapa, C. M. F. (2005) · Applied Soft Computing · doi:10.1016/j.asoc.2005.06.002 · Cited by 152
Risks in Chinese Construction Market—Contractors’ Perspective
Fang, D., Li, M., Fong, P. S. W., & Shen, L. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:6(853 · Cited by 134
The importance and allocation of risks in Indonesian construction projects
Andi, A. (2006) · Construction Management and Economics · doi:10.1080/01446190500310338 · Cited by 124
Understanding internally generated risks in projects
Barber, R. B. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.05.006 · Cited by 107
A new decision support system for performance measurement using combined fuzzy TOPSIS/DEA approach
Zeydan, M., & Çolpan, C. (2009) · International Journal of Production Research · doi:10.1080/00207540802662870 · Cited by 91
Appraisal, Risk and Uncertainty: Construction Management Series
(2003) · Emerald Group Publishing Limited eBooks · doi:10.1680/arau.31852 · Cited by 64
Ebrat, M., & Ghodsi, R. (2014) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-0139-5 · Cited by 62
Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects
Chen, P., & Wang, J. (2009) · doi:10.1109/ecbi.2009.14 · Cited by 28
Research works printed but not linked: 13
- Shen, 2001, Risk assessment for construction joint ventures in China, Journal of Construction Engineering and Management, 127, 76, 10.1061/(ASCE)0733-9364(2001)127:1(76) · doi:10.1061/(asce)0733-9364(2001)127:1(76
- Abdou, 1996, Managing construction risks, Journal of Architectural Engineering, 2, 3, 10.1061/(ASCE)1076-0431(1996)2:1(3) · doi:10.1061/(asce)1076-0431(1996)2:1(3
- Perry, 1985, Risk and its management in construction projects, Proceedings of the Institution of Civil Engineering. Part I, 499, 10.1680/iicep.1985.859 · doi:10.1680/iicep.1985.859
- Kuchta, 2001, Use of fuzzy numbers in project risk (criticality) assessment, International Journal of Project Management, 19, 305, 10.1016/S0263-7863(00)00022-3 · doi:10.1016/s0263-7863(00)00022-3
- Ebrat, 2011, Risk assessment of construction projects using network based adaptive fuzzy system, International Journal of Academic Research, 3, 411
- Danila, 1999, Strategic evaluation and solution of R&D projects, R&D Management, 19, 47, 10.1111/j.1467-9310.1989.tb00615.x · doi:10.1111/j.1467-9310.1989.tb00615.x
- Torfi, 2010, Fuzzy AHP to determine the relative weights of evaluation criteria and fuzzy TOPSIS to rank the alternatives, Applied Soft Computing, 10, 20, 10.1016/j.asoc.2009.08.021 · doi:10.1016/j.asoc.2009.08.021
- Chen, 2011, Fuzzy MCDM approach for selecting the best environment-watershed plan, Applied Soft Computing, 11, 265, 10.1016/j.asoc.2009.11.017 · doi:10.1016/j.asoc.2009.11.017
- Kartam, 2001, Risk and its management in the Kuwaiti construction industry: a contractors’ perspective, International Journal of Project Management, 19, 325, 10.1016/S0263-7863(00)00014-4 · DOI · Paper page
- Barber, 2005, Understanding internally generated risks in projects, International Journal of Project Management, 23, 584, 10.1016/j.ijproman.2005.05.006 · DOI
- Yurdakul, 2005, Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches, International Journal of production Research, 43, 4609, 10.1080/00207540500161746 · doi:10.1080/00207540500161746
- Elías, 2011, Outlier analysis for plastic card fraud detection a hybridized and multi-objective approach, HAIS, 2, 1
- Taylan, 2011, Estimating the quality of process yield by fuzzy sets and systems, Expert Systems with Applications, 38, 12599, 10.1016/j.eswa.2011.04.048 · doi:10.1016/j.eswa.2011.04.048
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
A review of fuzzy AHP methods for decision-making with subjective judgements
Liu, Y., Eckert, C. M., & Earl, C. (2020) · Expert Systems with Applications · doi:10.1016/j.eswa.2020.113738 · Cited by 1,079
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.08.064 · Cited by 441
Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach
Chen, J.-F., Hsieh, H.-N., & Do, Q. H. (2015) · Applied Soft Computing · doi:10.1016/j.asoc.2014.11.050 · Cited by 408
Fuzzy AHP-TOPSIS approaches to prioritizing solutions for reverse logistics barriers
Sirisawat, P., & Kiatcharoenpol, T. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.01.015 · Cited by 309
Metadata
- Authors
- Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R.
- Venue
- Applied Soft Computing
- Publisher
- Elsevier BV
- Published
- 2014-04
- Volume
- 17
- Pages
- 105-116
- ISSN
- 1568-4946 (ISSN-L)
- OpenAlex
- W1994119659
- Cited by
- 574
- References
- 28
- FWCI
- 49.70
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.