The DOI matches its Crossref record; 12 of the 12 references it cites were found in a registry or an index.
The controlling influences on effective risk identification and assessment for construction design management
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Tversky, A., & Kahneman, D. (1974) · Science · doi:10.1126/science.185.4157.1124 · Cited by 28,810
Judgement under Uncertainty: Heuristics and Biases
Hirschman, E. C., Kahneman, D., Slovic, P., & Tversky, A. (1983) · Journal of Marketing Research · doi:10.2307/3151689 · Cited by 3,813
Applied imagination : principles and procedures of creative problem-solving /
Osborn, A. F. (1963) · Cited by 1,445
Exceptional Paper—Probability Encoding in Decision Analysis
Spetzler, C. S., & Staël Von Holstein, C.-A. S. (1975) · Management Science · doi:10.1287/mnsc.22.3.340 · Cited by 662
Risk Management and Construction
Flanagan, R. (1993) · Medical Entomology and Zoology · Cited by 640
Project Risk Management: Processes, Techniques and Insights
Smith, J. U. M. (1998) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600022 · Cited by 555
Risk Analysis and Its Applications
Carter, H. (1984) · Journal of the Operational Research Society · doi:10.1057/jors.1984.90 · Cited by 219
The effectiveness of working group risk identification and assessment techniques
Chapman, R. J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00015-5 · Cited by 160
Self-citationEngineering Construction Risks - A Guide to Project Risk Analysis and Risk Management
Thompson, P., & Perry, J. (1992) · doi:10.1680/ecragtpraarm.16651 · Cited by 141
Chapman, R. J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00043-4 · Cited by 69
Self-citation
Cited by
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
A critical review of 3D printing in construction: benefits, challenges, and risks
El-Sayegh, S., Romdhane, L., & Manjikian, S. (2020) · Archives of Civil and Mechanical Engineering · doi:10.1007/s43452-020-00038-w · Cited by 387
Salomo, S., Weise, J., & Gemünden, H. G. (2007) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2007.00252.x · Cited by 303
Metadata
- Authors
- Chapman, R. J.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2001-04
- Volume
- 19
- Issue
- 3
- Pages
- 147-160
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2069993317
- Cited by
- 352
- References
- 12
- FWCI
- 8.31
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: The controlling influences on effective risk identification and assessment for construction design management. https://app.cochat.ai/papers/10.1016/s0263-7863(99)00070-8
- The paper
- Chapman, R. J. (2001). The controlling influences on effective risk identification and assessment for construction design management. International Journal of Project Management. https://doi.org/10.1016/s0263-7863(99)00070-8
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.