The DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
BIM implementation throughout the UK construction project lifecycle: An analysis
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,192
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.007 · Cited by 1,139
Technology adoption in the BIM implementation for lean architectural practice
Arayıcı, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.016 · Cited by 726
Building information modelling (BIM): now and beyond
Azhar, S., Khalfan, M., & Maqsood, T. (2015) · Construction Economics and Building · doi:10.5130/ajceb.v12i4.3032 · Cited by 671
Building information modeling for sustainable design and LEED® rating analysis
Azhar, S., Carlton, W. A., Olsen, D., & Ahmad, I. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.019 · Cited by 607
Performance management in construction: a conceptual framework
Kagioglou, M., Cooper, R., & Aouad, G. F. (2001) · Construction Management and Economics · doi:10.1080/01446190010003425 · Cited by 468
Value proposition on interoperability of BIM and collaborative working environments
Grilo, A., & Jardim-Goncalves, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.003 · Cited by 450
IFC and building lifecycle management
Vanlande, R., Cruz, C., & Cruz, C. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.05.001 · Cited by 334
Building information modelling – Experts’ views on standardisation and industry deployment
Howard, R., & Björk, B.-C. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2007.03.001 · Cited by 328
Cited by
Big Data in the construction industry: A review of present status, opportunities, and future trends
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., Owolabi, H. A., Alaka, H. A., & Pasha, M. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.07.001 · Cited by 734
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Blockchain technology: Is it hype or real in the construction industry?
Perera, S., Nanayakkara, S., Rodrigo, M. N. N., Senaratne, S., & Weinand, R. (2020) · Journal of Industrial Information Integration · doi:10.1016/j.jii.2020.100125 · Cited by 506
Salvaging building materials in a circular economy: a BIM-based whole-life performance estimator
Akanbi, L. A., Oyedele, L. O., Akinade, O. O., Ajayi, A. O., Davila Delgado, M., Bilal, M., & Bello, S. A. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.10.026 · Cited by 468
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Jin, R., Li, B., Zhou, T., Wanatowski, D., & Piroozfar, P. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.07.034 · Cited by 401
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., Owolabi, H. A., & Kadiri, K. O. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.06.001 · Cited by 282
Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.018 · Cited by 272
Practices and effectiveness of building information modelling in construction projects in China
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.10.014 · Cited by 266
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.01.022 · Cited by 260
Charef, R., Alaka, H., & Emmitt, S. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.04.028 · Cited by 255
Users-orientated evaluation of building information model in the Chinese construction industry
Xu, H., Feng, J., & Li, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.12.004 · Cited by 165
A Traceability Framework to Enable Circularity in the Built Environment
Davari, S., Jaberi, M., Yousfi, A., & Poirier, E. (2023) · Sustainability · doi:10.3390/su15108278 · Cited by 32
Metadata
- Authors
- Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2013-12
- Volume
- 36
- Pages
- 145-151
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2075808966
- Cited by
- 749
- References
- 24
- FWCI
- 47.36
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.