The DOI matches its Crossref record; 78 of the 78 references it cites were found in a registry or an index.
Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment
Open accessAbstract
The need to use Building Information Modelling (BIM) for Construction and Demolition Waste (CDW) minimisation is well documented but most of the existing CDW management tools still lack BIM functionality. This study therefore assesses the expectations of stakeholders on how BIM could be employed for CDW management. After a review of extant literature to assess the limitations of existing CDW management tools, qualitative Focus Group Interviews (FGIs) were conducted with professionals who are familiar with the use of BIM to understand their expectations on the use of BIM for CDW management. The 22 factors identified from the qualitative data analyses were then developed into a questionnaire survey. The exploratory factor analysis of the responses reveals five major groups of BIM expectations for CDW management, which are: (i) BIM-based collaboration for waste management, (ii) waste-driven design process and solutions, (iii) waste analysis throughout building lifecycle, (iv) innovative technologies for waste intelligence and analytics, and (v) improved documentation for waste management. Considering these groups of factors is key to meeting the needs of the stakeholders regarding the use of BIM for CDW management. These groups of factors are important considerations for the implementation and acceptance of BIM-based tools and practices for CDW management within the construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
Creswell, J. W. (1994) · Cited by 35,472
Discovering Statistics Using SPSS
Field, A. P., & Miles, J. N. V. (2000) · Medical Entomology and Zoology · Cited by 28,284
Qualitative Inquiry and Research Design: Choosing Among Five Approaches
Lewis, S. (2015) · Health Promotion Practice · doi:10.1177/1524839915580941 · Cited by 22,105
Research design: qualitative, quantitative, and mixed methods approaches
Caldas, M. P. (2003) · Revista de Administração Contemporânea · doi:10.1590/s1415-65552003000100015 · Cited by 18,745
(2017) · Cited by 16,036
Phenomenological research methods
Moustakas, C. (1994) · doi:10.4135/9781412995658 · Cited by 13,919
An Introduction to Qualitative Research
Flick, U. (2023) · SAGE Publications Ltd eBooks · doi:10.4135/9781036231712 · Cited by 8,198
Achieving integration in mixed methods designs-principles and practices
Fetters, M. D., Curry, L. A., & Creswell, J. W. (2013) · Health Services Research · doi:10.1111/1475-6773.12117 · Cited by 7,219 · cited 1×
“According to Fetters et al. (2013), chief among the bene fi ts is the use of quantitative data analyses to explain and generalise fi ndings from qualitative analysis.”
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Cited by
Jin, R., Yuan, H., & Chen, Q. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.09.029 · Cited by 380
Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2021) · Materials · doi:10.3390/ma15010076 · Cited by 357
Exploring factors influencing construction waste reduction: A structural equation modeling approach
Liu, J., Yi, Y., & Wang, X. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.123185 · Cited by 272
The classification of construction waste material using a deep convolutional neural network
Davis, P., Aziz, F., Newaz, M. T., Sher, W., & Simon, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103481 · Cited by 204
Metadata
- Authors
- Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2018-04
- Volume
- 180
- Pages
- 375-385
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2789055628
- Cited by
- 260
- References
- 78
- FWCI
- 17.41
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment. https://app.cochat.ai/papers/10.1016/j.jclepro.2018.01.022
- The paper
- Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O. (2018). Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment. Journal of Cleaner Production. https://doi.org/10.1016/j.jclepro.2018.01.022
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.