The DOI matches its Crossref record; 22 of the 22 references it cites were found in a registry or an index.
Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Technology adoption in the BIM implementation for lean architectural practice
Arayıcı, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.016 · Cited by 565
Critical review of the research on the management of prefabricated construction
Li, C. Z., Shen, Q., & Xue, X. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.04.001 · Cited by 493
Specifying parametric building object behavior (BOB) for a building information modeling system
Lee, G., Sacks, R., & Eastman, C. M. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.09.009 · Cited by 396
Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong
Jaillon, L., & Poon, C. S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.09.006 · Cited by 305
Kim, M.-K., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.07.010 · Cited by 275
Practices and effectiveness of building information modelling in construction projects in China
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.10.014 · Cited by 266
Prediction and optimization of life-cycle costs in early design
Bogenstätter, U. (2000) · Building Research & Information · doi:10.1080/096132100418528 · Cited by 202
Environmental impacts of prefabricated school buildings in Catalonia
Pons, O., & Wadel, G. (2011) · Habitat International · doi:10.1016/j.habitatint.2011.03.005 · Cited by 175
Factors Affecting the Use of Precast Concrete Systems in the United States
Polat, G. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:3(169 · Cited by 149
BIM Standard in Off-Site Construction
Nawari, N. O. (2012) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000056 · Cited by 148
Cited by
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
A holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357
Barriers to Implementing the Circular Economy in the Construction Industry: A Critical Review
Charef, R., Morel, J.-C., & Rakhshan, K. (2021) · Sustainability · doi:10.3390/su132312989 · Cited by 188
BIM-based task-level planning for robotic brick assembly through image-based 3D modeling
Ding, L., Jiang, W., Zhou, Y., Zhou, C., & Liu, S. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.100993 · Cited by 116
Metadata
- Authors
- Yuan, Z., Sun, C., & Wang, Y.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2018-04
- Volume
- 88
- Pages
- 13-22
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2779685344
- Cited by
- 293
- References
- 22
- FWCI
- 15.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings. https://app.cochat.ai/papers/10.1016/j.autcon.2017.12.021
- The paper
- Yuan, Z., Sun, C., & Wang, Y. (2018). Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings. Automation in Construction. https://doi.org/10.1016/j.autcon.2017.12.021
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.