A BIM-data mining integrated digital twin framework for advanced project management
The DOI matches its Crossref record; 52 of the 52 references it cites were found in a registry or an index.
Abstract
Abstract With the focus of smart construction project management, this paper presents a closed-loop digital twin framework under the integration of Building Information Modeling (BIM), Internet of Things (IoT), and data mining (DM) techniques. To be specific, IoT connects the physical and cyber world to capture real-time data for modeling and analyzing, and data mining methods incorporated in the virtual model aim to discover hidden knowledge in collected data. The proposed digital twin has been verified in a practical BIM-based project. Based on large inspection data from IoT devices, the 4D visualization and task-centered or worker-centered process model are built as the virtual model to simulate both the task execution and worker cooperation. Then, the high-fidelity virtual model is investigated by process mining and time series analysis. Results show that possible bottlenecks in the current process can be foreseen using the fuzzy miner, while the number of finished tasks in the next phase can be predicted by the multivariate autoregressive integrated moving average (ARIMAX) model. Consequently, tactic decision-making can realize to not only prevent possible failure in advance, but also arrange work and staffing reasonably to make the process adapt to changeable conditions. In short, the significance of this paper is to build a data-driven digital twin framework integrating with BIM, IoT, and data mining for advanced project management, which can facilitate data communication and exploration to better understand, predict, and optimize the physical construction operations. In future works, more complex cases with multiple data streams will be used to test the developed framework, and more detailed interpretations with the actual observations of construction activities will be given.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Design Science in Information Systems Research1
Hevner, A. R., March, S. T., Park, J., & Ram, S. (2004) · MIS Quarterly · doi:10.2307/25148625 · Cited by 10,707
Design science in information systems research
(2004) · Journal of the Association for Information Systems · doi:10.5555/2017212.2017217 · Cited by 8,254
Digital Twin in Industry: State-of-the-Art
Tao, F., Zhang, H., Liu, A., & Nee, A. Y. C. (2019) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2018.2873186 · Cited by 5,871
Time Series Analysis: Forecasting and Control.
Anderson, O. D., Box, G. E. P., & Jenkins, G. M. (1978) · The Statistician · doi:10.2307/2988198 · Cited by 5,298
The Digital Twin Paradigm for Future NASA and U.S. Air Force Vehicles
Glaessgen, E., & Stargel, D. (2012) · 53rd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics and Materials Conference 20th AIAA/ASME/AHS Adaptive Structures Conference 14th AIAA · doi:10.2514/6.2012-1818 · Cited by 3,395
Digital twin and big data towards smart manufacturing and Industry 4.0: 360 degree comparison
Qi, Q., & Tao, F. (2018) · IEEE Access · doi:10.1109/access.2018.2793265 · Cited by 1,716
Digital twin shop-floor: a new shop-floor paradigm towards smart manufacturing
Tao, F., & Zhang, M. (2017) · IEEE Access · doi:10.1109/access.2017.2756069 · Cited by 1,397
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Self-citationTowards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Shaping the digital twin for design and production engineering
Schleich, B., Anwer, N., Mathieu, L., & Wartzack, S. (2017) · CIRP Annals · doi:10.1016/j.cirp.2017.04.040 · Cited by 1,305
Cited by
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Self-citationA comprehensive review of digital twin — part 1: modeling and twinning enabling technologies
Thelen, A., Zhang, X., Fink, O., Lu, Y., Ghosh, S., Youn, B. D., Todd, M. D., Mahadevan, S., Hu, C., & Hu, Z. (2022) · Structural and Multidisciplinary Optimization · doi:10.1007/s00158-022-03425-4 · Cited by 441
Lee, D., Lee, S. H., Masoud, N., Krishnan, M. S., & Li, V. C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103688 · Cited by 428
A survey on AI-driven digital twins in Industry 4.0: smart manufacturing and advanced robotics
Huang, Z., Shen, Y., Li, J., Fey, M., & Brecher, C. (2021) · Sensors · doi:10.3390/s21196340 · Cited by 418
Technologies for digital twin applications in construction
Tuhaise, V. V., Tah, J. H. M., & Abanda, F. H. (2023) · Automation in Construction · doi:10.1016/j.autcon.2023.104931 · Cited by 308
Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., & Roshdi Laleh, S. (2022) · Buildings · doi:10.3390/buildings12101503 · Cited by 242
Alizadehsalehi, S., & Yitmen, I. (2023) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-01-2021-0016 · Cited by 227
Digital building twins and blockchain for performance-based (smart) contracts
Hunhevicz, J. J., Motie, M., & Hall, D. M. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.103981 · Cited by 180
“…potential of digital twins for performance optimization through real-time assessment of what-if scenarios in the virtual space in construction processes [44,45], sustainability-based life cycle management of railway [46], operations management of HVAC systems [47], and maintenance of bridges [48].”
BackgroundAn Adapted Model of Cognitive Digital Twins for Building Lifecycle Management
Yitmen, I., Alizadehsalehi, S., Akıner, İ., & Akıner, M. E. (2021) · Applied Sciences · doi:10.3390/app11094276 · Cited by 165
Saka, A. B., Oyedele, L. O., Akanbi, L. A., Ganiyu, S. A., Chan, D. W. M., & Bello, S. A. (2023) · Advanced Engineering Informatics · doi:10.1016/j.aei.2022.101869 · Cited by 161
Sakr, M., & Sadhu, A. (2023) · Journal of Infrastructure Intelligence and Resilience · doi:10.1016/j.iintel.2023.100053 · Cited by 46
Digital Revolution in the Energy Sector: Effects of Using Digital Twin Technology
Strielkowski, W., Rausser, G., & Kuzmin, E. (2022) · Lecture Notes in Information Systems and Organisation · doi:10.1007/978-3-030-94617-3_4 · Cited by 38
Metadata
- Authors
- Pan, Y., & Zhang, L.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2021-04
- Volume
- 124
- Pages
- 103564
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W3128714328
- Cited by
- 518
- References
- 52
- FWCI
- 38.58
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.