The DOI matches its Crossref record; 52 of the 52 references it cites were found in a registry or an index.
A BIM-data mining integrated digital twin framework for advanced project management
Abstract
Abstract With the focus of smart construction project management, this paper presents a closed-loop digital twin framework under the integration of Building Information Modeling (BIM), Internet of Things (IoT), and data mining (DM) techniques. To be specific, IoT connects the physical and cyber world to capture real-time data for modeling and analyzing, and data mining methods incorporated in the virtual model aim to discover hidden knowledge in collected data. The proposed digital twin has been verified in a practical BIM-based project. Based on large inspection data from IoT devices, the 4D visualization and task-centered or worker-centered process model are built as the virtual model to simulate both the task execution and worker cooperation. Then, the high-fidelity virtual model is investigated by process mining and time series analysis. Results show that possible bottlenecks in the current process can be foreseen using the fuzzy miner, while the number of finished tasks in the next phase can be predicted by the multivariate autoregressive integrated moving average (ARIMAX) model. Consequently, tactic decision-making can realize to not only prevent possible failure in advance, but also arrange work and staffing reasonably to make the process adapt to changeable conditions. In short, the significance of this paper is to build a data-driven digital twin framework integrating with BIM, IoT, and data mining for advanced project management, which can facilitate data communication and exploration to better understand, predict, and optimize the physical construction operations. In future works, more complex cases with multiple data streams will be used to test the developed framework, and more detailed interpretations with the actual observations of construction activities will be given.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Design Science in Information Systems Research1
Hevner, A. R., March, S. T., Park, J., & Ram, S. (2004) · MIS Quarterly · doi:10.2307/25148625 · Cited by 10,707
Design science in information systems research
(2004) · Journal of the Association for Information Systems · doi:10.5555/2017212.2017217 · Cited by 8,254
Digital Twin in Industry: State-of-the-Art
Tao, F., Zhang, H., Liu, A., & Nee, A. Y. C. (2019) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2018.2873186 · Cited by 5,871
Time Series Analysis: Forecasting and Control.
Anderson, O. D., Box, G. E. P., & Jenkins, G. M. (1978) · The Statistician · doi:10.2307/2988198 · Cited by 5,298
The Digital Twin Paradigm for Future NASA and U.S. Air Force Vehicles
Glaessgen, E., & Stargel, D. (2012) · 53rd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics and Materials Conference 20th AIAA/ASME/AHS Adaptive Structures Conference 14th AIAA · doi:10.2514/6.2012-1818 · Cited by 3,395
Digital twin and big data towards smart manufacturing and Industry 4.0: 360 degree comparison
Qi, Q., & Tao, F. (2018) · IEEE Access · doi:10.1109/access.2018.2793265 · Cited by 1,716
Digital twin shop-floor: a new shop-floor paradigm towards smart manufacturing
Tao, F., & Zhang, M. (2017) · IEEE Access · doi:10.1109/access.2017.2756069 · Cited by 1,397
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Self-citationTowards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Shaping the digital twin for design and production engineering
Schleich, B., Anwer, N., Mathieu, L., & Wartzack, S. (2017) · CIRP Annals · doi:10.1016/j.cirp.2017.04.040 · Cited by 1,305
Digital twin-driven product design framework
Tao, F., Sui, F., Liu, A., Qi, Q., Zhang, M., Song, B., Guo, Z., Lu, S. C.-Y., & Nee, A. Y. C. (2019) · International Journal of Production Research · doi:10.1080/00207543.2018.1443229 · Cited by 1,187
A review on time series forecasting techniques for building energy consumption
Deb, C., Zhang, F., Yang, J., Lee, S. E., & Shah, K. W. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2017.02.085 · Cited by 1,006
Time Series Analysis Forecasting and Control.
Chakravarti, I. M., Box, G. E. P., & Jenkins, G. M. (1973) · Journal of the American Statistical Association · doi:10.2307/2284112 · Cited by 972
Fuzzy Mining – Adaptive Process Simplification Based on Multi-perspective Metrics
Günther, C. W., & van der Aalst, W. M. P. (2007) · Lecture Notes in Computer Science · doi:10.1007/978-3-540-75183-0_24 · Cited by 890
Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018) · Wiley eBooks · doi:10.1002/9781119287568 · Cited by 884
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853
Developing a Digital Twin at Building and City Levels: Case Study of West Cambridge Campus
Lu, Q., Parlikad, A. K., Woodall, P., Don Ranasinghe, G., Xie, X., Liang, Z., Konstantinou, E., Heaton, J., & Schooling, J. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000763 · Cited by 531
van der Aalst, W. M. P. (2016) · Springer eBooks · doi:10.1007/978-3-662-49851-4_1 · Cited by 522
Cheng, J. C. P., Chen, W., Chen, K., & Wang, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103087 · Cited by 520
Digital twin-enabled anomaly detection for built asset monitoring in operation and maintenance
Lu, Q., Xie, X., Parlikad, A. K., & Schooling, J. M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103277 · Cited by 481
March, S. T., & Storey, V. C. (2008) · MIS Quarterly · doi:10.2307/25148869 · Cited by 462
Machine Learning based Digital Twin Framework for Production Optimization in Petrochemical Industry
Min, Q., Lu, Y., Liu, Z., Su, C., & Wang, B. (2019) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2019.05.020 · Cited by 436
The digital twin of an industrial production line within the industry 4.0 concept
Vachalek, J., Bartalsky, L., Rovny, O., Sismisova, D., Morhac, M., & Loksik, M. (2017) · 2017 21st International Conference on Process Control (PC) · doi:10.1109/pc.2017.7976223 · Cited by 339
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
Shim, C.-S., Dang, N.-S., Lon, S., & Jeon, C.-H. (2019) · Structure and Infrastructure Engineering · doi:10.1080/15732479.2019.1620789 · Cited by 311
Opportunities for enhanced lean construction management using Internet of Things standards
Dave, B., Kubler, S., Främling, K., & Koskela, L. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.10.009 · Cited by 292
A framework for integrating BIM and IoT through open standards
Dave, B., Buda, A., Nurminen, A., & Främling, K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.022 · Cited by 284
Golparvar‐Fard, M., Pena-Mora, F. A., & Savarese, S. (2009) · Journal of Information Technology in Construction · Cited by 277
Dimitrov, A., & Golparvar-Fard, M. (2014) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.11.002 · Cited by 261
Digital twinning of existing reinforced concrete bridges from labelled point clusters
Lu, R., & Brilakis, I. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102837 · Cited by 258
Buijs, J. C. A. M., van Dongen, B. F., & van der Aalst, W. M. P. (2014) · International Journal of Cooperative Information Systems · doi:10.1142/s0218843014400012 · Cited by 216
UAV IoT Framework Views and Challenges: Towards Protecting Drones as “Things”
Lagkas, T., Argyriou, V., Bibi, S., & Sarigiannidis, P. (2018) · Sensors · doi:10.3390/s18114015 · Cited by 196
Multi-classifier information fusion in risk analysis
Pan, Y., Zhang, L., Wu, X., & Skibniewski, M. J. (2020) · Information Fusion · doi:10.1016/j.inffus.2020.02.003 · Cited by 191
Self-citationA business process mining application for internal transaction fraud mitigation
Jans, M., van der Werf, J. M., Lybaert, N., & Vanhoof, K. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.04.159 · Cited by 175
A Natural‐Language‐Based Approach to Intelligent Data Retrieval and Representation for Cloud BIM
Lin, J., Hu, Z., Zhang, J., & Yu, F. (2016) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12151 · Cited by 172
A hybrid data mining approach on BIM-based building operation and maintenance
Yang, P., Lin, J., Zhang, J., & Hu, Z. (2017) · Building and Environment · doi:10.1016/j.buildenv.2017.09.030 · Cited by 134
Anomaly detection for industrial control systems using process mining
Myers, D., Suriadi, S., Radke, K., & Foo, E. (2018) · Computers & Security · doi:10.1016/j.cose.2018.06.002 · Cited by 117
Teizer, J., Wolf, M., Golovina, O., Perschewski, M., Propach, M., Neges, M., & König, M. (2017) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2017/0084 · Cited by 110
Cyber-physical systems for temporary structure monitoring
Yuan, X., Anumba, C., & Parfitt, M. K. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.02.005 · Cited by 108
Towards a data science toolbox for industrial analytics applications
Flath, C. M., & Stein, N. (2017) · Computers in Industry · doi:10.1016/j.compind.2017.09.003 · Cited by 90
Discovering Hierarchical Process Models Using ProM
Bose, R. P. J. C., Verbeek, H. M. W., & van der Aalst, W. M. P. (2012) · Lecture notes in computer science · doi:10.1007/978-3-642-29749-6_3 · Cited by 64
BIM log mining: Learning and predicting design commands
Pan, Y., & Zhang, L. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103107 · Cited by 63
Self-citationHwang, I., & Jang, Y. J. (2017) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2017.2692961 · Cited by 60
A Goal-Driven Evaluation Method Based On Process Mining for Healthcare Processes
Erdoğan, T. G., & Tarhan, A. (2018) · Applied Sciences · doi:10.3390/app8060894 · Cited by 57
Broniatowski, D. A., Dredze, M. H., Paul, M. J., & Dugas, A. F. (2015) · JMIR Public Health and Surveillance · doi:10.2196/publichealth.4472 · Cited by 55
Vaudry, D., Corbière, A., Basille, M., Bahdoudi, S., Masmoudi‐Kouki, O., Leprince, J., Burel, D., Bénard, M., Galas, L., & Komuro, F. H. (2015) · SpringerPlus · doi:10.1186/2193-1801-4-s1-l58 · Cited by 50
IFC-based process mining for design authoring
Kouhestani, S., & Nik‐Bakht, M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103069 · Cited by 47
BIM log mining: Exploring design productivity characteristics
Pan, Y., & Zhang, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102997 · Cited by 46
Self-citationClustering of designers based on building information modeling event logs
Pan, Y., Zhang, L., & Skibniewski, M. J. (2020) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12551 · Cited by 37
Self-citationLu, Q., Parlikad, A. K., Woodall, P., Ranasinghe, G. D., Xie, X., Liang, Z., Konstantinou, E., Heaton, J., & Schooling, J. M. (2019) · Cambridge University Engineering Department Publications Database · doi:10.17863/cam.45198 · Cited by 34
Pan, Y., Zhang, L., & Li, Z. (2020) · Knowledge-Based Systems · doi:10.1016/j.knosys.2020.106482 · Cited by 33
Self-citation
Cited by
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Self-citationA comprehensive review of digital twin — part 1: modeling and twinning enabling technologies
Thelen, A., Zhang, X., Fink, O., Lu, Y., Ghosh, S., Youn, B. D., Todd, M. D., Mahadevan, S., Hu, C., & Hu, Z. (2022) · Structural and Multidisciplinary Optimization · doi:10.1007/s00158-022-03425-4 · Cited by 441
Lee, D., Lee, S. H., Masoud, N., Krishnan, M. S., & Li, V. C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103688 · Cited by 428
A survey on AI-driven digital twins in Industry 4.0: smart manufacturing and advanced robotics
Huang, Z., Shen, Y., Li, J., Fey, M., & Brecher, C. (2021) · Sensors · doi:10.3390/s21196340 · Cited by 418
Technologies for digital twin applications in construction
Tuhaise, V. V., Tah, J. H. M., & Abanda, F. H. (2023) · Automation in Construction · doi:10.1016/j.autcon.2023.104931 · Cited by 308
Metadata
- Authors
- Pan, Y., & Zhang, L.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2021-04
- Volume
- 124
- Pages
- 103564
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W3128714328
- Cited by
- 518
- References
- 52
- FWCI
- 38.58
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.