Identification and assessment of risk factors affecting construction projects
Open accessThe DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Abstract
Cost saving and time performance are usually essential to all parties who are involved in a construction project, that is owner, contractor, subcontractor. The main causes of disputes in construction projects involve delay and failure to complete the work in the specified cost and time frame. The delivery time of a project is a key factor to the owner in terms of cost as much as it is for the contractor.Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Significant factors causing delay in the UAE construction industry
Faridi, A. S., & El‐Sayegh, S. M. (2006) · Construction Management and Economics · doi:10.1080/01446190600827033 · Cited by 551 · cited 2×
“As a result of these sources, construction projects may face problems that cause delay(s) in the project completion time [1].”
BackgroundDelays and cost increases in the construction of private residential projects in Kuwait
Koushki, P. A., Al‐Rashid, K., & Kartam, N. (2005) · Construction Management and Economics · doi:10.1080/0144619042000326710 · Cited by 456 · cited 1×
“Time-delays and cost overruns are among the most common phenomena in the construction industry [4].”
BackgroundCritical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
Iyer, K. C., & Jha, K. N. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:8(871 · Cited by 244 · cited 2×
“Iyer and Jha [12] identified 55 factors affecting the performance of project schedule.”
BackgroundProbabilistic Estimation and Allocation of Project Time Contingency
Barraza, G. A. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000280 · Cited by 81
Cited by
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Kassem, M. A. (2022) · Gases · doi:10.3390/gases2020003 · Cited by 36
“In both developed and the least developed countries, the risk is a major issue in construction projects; however, this trend in the least developed countries is very serious, where it sometimes exceeds 100% of expected costs and time [1,2].”
Background
Metadata
- Authors
- Abd El-Karim, M. S. B. A., Mosa El Nawawy, O. A., & Abdel-Alim, A. M.
- Venue
- HBRC Journal
- Publisher
- Informa UK Limited
- Published
- 2017-08
- Volume
- 13
- Issue
- 2
- Pages
- 202-216
- ISSN
- 1687-4048 (ISSN-L)
- OpenAlex
- W648654991
- Cited by
- 201
- References
- 4
- FWCI
- 5.82
- Type
- journal article
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.