The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Value stream mapping to reduce the lead-time of a product development process
Open accessAbstract
Product development (PD) is a broad field of endeavor dealing with the planning, design, creation, and marketing of a new product. This revolutionary research domain has become of paramount importance to beat the competition for multidisciplinary products which are larger in size and have a longer development time. The main focus of this article is to exploit lean thinking concepts in order to manage, improve and develop the product faster while improving or at least maintaining the level of performance and quality. Lean thinking concepts encompass a board range of tools and methods intended to produce bottom line results however, value stream mapping (VSM) method is used to explore the wastes, inefficiencies, non-valued added steps in a single, definable process out of complete product development process (PDP). This single step is highly complex and occurs once while the PDP lasts for 3–5 years. A case study of gas turbine product has been discussed to illustrate and justify the use of proposed framework. In order to achieve this, the following have been performed: First of all a current state map is developed using the Gemba walk. Furthermore, Subject Matter Experts (SMEs) brainstormed to explore the wastes and their root causes found during the Gemba walk and current state mapping. A future state map is also developed with removing all the wastes/inefficiencies. Besides numerous intangible benefits, it is expected that the VSM framework will help the development teams to reduce the PD lead-time by 50%.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Marketing management: analysis. planning. implementation and control
Kotler, P. (2000) · Cited by 6,639
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
PRODUCT DESIGN AND DEVELOPMENT
(2018) · Handbook of Research on New Product Development · doi:10.4337/9781784718152.00017 · Cited by 5,504
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Product development performance: strategy, organization, and management in the world auto industry
(1991) · Choice Reviews Online · doi:10.5860/choice.29-1591 · Cited by 2,389
Lean Thinking-Banish Waste and Create Wealth in Your Corporation.
Rand, G., Womack, J., & Jones, D. T. (1997) · The Journal of the Operational Research Society · doi:10.2307/3010314 · Cited by 1,835
Lean Software Development: An Agile Toolkit
Poppendieck, M., & Poppendieck, T. (2003) · International Linear Collider · Cited by 1,359
Revolutionizing product development
Wheelwright, S. C. (1992) · Cited by 1,061
Product design and development
Aston, W. J. (1992) · Biosensors and Bioelectronics · doi:10.1016/0956-5663(92)90013-d · Cited by 1,002
Yang, M. G. (., Hong, P., & Modi, S. B. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.10.017 · Cited by 961
Revolutionizing product development
Burda, M. (1993) · Journal of Engineering and Technology Management · doi:10.1016/0923-4748(93)90032-e · Cited by 571
Implementing the Lean Sigma framework in an Indian SME: a case study
Kumar, M., Antony, J., Singh, R. K., Tiwari, M. K., & Perry, D. (2006) · Production Planning & Control · doi:10.1080/09537280500483350 · Cited by 473
The role of communication and management support in a lean manufacturing implementation
Worley, J. M., & Doolen, T. L. (2006) · Management Decision · doi:10.1108/00251740610650210 · Cited by 411
Seth *, D., & Gupta, V. (2005) · Production Planning & Control · doi:10.1080/09537280512331325281 · Cited by 348
A survey of major approaches for accelerating new product development
Millson, M. (1992) · Journal of Product Innovation Management · doi:10.1016/0737-6782(92)90061-g · Cited by 336
The impact of lean practices on inventory turnover
Demeter, K., & Matyusz, Z. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.10.031 · Cited by 298
Developing Products in Half the Time: New Rules, New Tools
Smith, P. G., & Reinertsen, D. G. (1997) · Medical Entomology and Zoology · Cited by 291
Applying the lessons learned from 27 lean manufacturers.
Panizzolo, R. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00066-8 · Cited by 251
Applying lean thinking to new product introduction
Haque, B., & James-moore, M. (2004) · Journal of Engineering Design · doi:10.1080/0954482031000150125 · Cited by 200
Editorial: Lean in Public Services—Panacea or Paradox?
Radnor, Z., & Boaden, R. (2010) · Research Explorer (The University of Manchester) · doi:10.1111/j.1467-9302.2008.00610.x · Cited by 194
Value stream mapping: literature review and implications for Indian industry
Singh, B., Garg, S. K., & Sharma, S. K. (2011) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-010-2860-7 · Cited by 194
Consequences of New Product Development Speed: A Meta‐Analysis
Cankurtaran, P., Langerak, F., & Griffin, A. (2013) · Journal of Product Innovation Management · doi:10.1111/jpim.12011 · Cited by 184
Dröge, C., Jayaram, J., & Vickery, S. K. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00009-0 · Cited by 182
Equipment replacement decisions and lean manufacturing
Sullivan, W. G., McDonald, T. N., & Aken, E. M. V. (2002) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(02)00016-9 · Cited by 171
Herron, C., & Braiden, P. M. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.10.004 · Cited by 165
Langerak, F., & Hultink, E. J. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2004.839941 · Cited by 138
Lean planning in the semi-process industry, a case study
Pool, A., Wijngaard, J., & van der Zee, D.-J. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.04.040 · Cited by 121
Improving flow to achieve lean manufacturing in shipbuilding
Storch, R. L., & Lim, S.-G. (1999) · Production Planning & Control · doi:10.1080/095372899233280 · Cited by 90
Modular design of product families for quality and cost
Bruno Agard, A., & Bassetto, S. (2012) · International Journal of Production Research · doi:10.1080/00207543.2012.693963 · Cited by 74
Improving group performance by training in individual problem solving.
Bottger, P. C., & Yetton, P. (1987) · Journal of Applied Psychology · doi:10.1037/0021-9010.72.4.651 · Cited by 73
Incorporating lean concepts into supply chain management
Cudney, E. A., & Elrod, C. C. (2010) · International Journal of Six Sigma and Competitive Advantage · doi:10.1504/ijssca.2010.034854 · Cited by 65
Lean thinking in the UK red meat industry: A systems and contingency approach
Simons, D. W., & Taylor, D. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.04.003 · Cited by 55
Development of a Conceptual Framework for Lean New Product Development Process
Anand, G., & Kodali, R. (2008) · International Journal of Product Development · doi:10.1504/ijpd.2008.019240 · Cited by 53
Tyagi, S. K., Yang, K., Tyagi, A., et al. (2011) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2011.02.009 · Cited by 35
Self-citationHealth service improvement through diagnostic waiting list management
Lodge, A., & Bamford, D. (2007) · Leadership in health services · doi:10.1108/17511870710829364 · Cited by 27
Tyagi, S. K., Yang, K., & Verma, A. P. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.633120 · Cited by 21
Self-citationHoulahan, C. J. (1994) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 9
An analysis of pricing and leadtime policies within the marketing/operations interface
Pekgün, P. (2007) · SMARTech Repository (Georgia Institute of Technology) · Cited by 4
Cited by
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Antony, J., Psomas, E., Garza-Reyes, J. A., & Hines, P. (2021) · Production Planning & Control · doi:10.1080/09537287.2020.1776410 · Cited by 116
“Hence, LM practitioners are still experimenting through "learning by doing” to see what works and what does not, as practical implementation guidelines have not been laid down yet (Anvari et al., 2014; Tyagi et al., 2015).”
Background
Metadata
- Authors
- Tyagi, S., Choudhary, A., Cai, X., & Yang, K.
- Venue
- International Journal of Production Economics
- Publisher
- Elsevier BV
- Published
- 2015-02
- Volume
- 160
- Pages
- 202-212
- ISSN
- 0925-5273 (ISSN-L)
- OpenAlex
- W2058719009
- Cited by
- 296
- References
- 38
- FWCI
- 45.35
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.