Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach
The DOI matches its Crossref record; 34 of the 34 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
SPSS for Windows Step by Step: A Simple Guide and Reference
Mallery, P., & George, D. (1998) · Cited by 10,394
Marketing Research: An Applied Orientation
Kahle, L. R., & Malhotra, N. K. (1994) · Journal of Marketing Research · doi:10.2307/3151953 · Cited by 7,087
Reliability and Validity Assessment
Carmines, E., & Zeller, R. (1979) · doi:10.4135/9781412985642 · Cited by 5,884 · cited 1×
“To ensure the reliability of each factor, Cronbach’s coefficient alpha ðaÞ was used to test the internal consistency among the items included in each factor [ 37 ].”
MethodReliability and Validity Assessment
(2011) · The Encyclopedia of Political Science · doi:10.4135/9781608712434.n1341 · Cited by 5,040
An Easy Guide to Factor Analysis
Kline, P. (2014) · Routledge eBooks · doi:10.4324/9781315788135 · Cited by 3,309 · cited 2×
“In contrast, oblique rotations allow factors to correlate with more freedom in selecting the position of factor space [ 31 ].”
BackgroundFactor Analysis: Statistical Methods and Practical Issues
Kim, J.-O., & Mueller, C. W. (1978) · Cited by 2,778
An easy guide to factor analysis
Gudjonsson, G. (1994) · Personality and Individual Differences · doi:10.1016/0191-8869(94)90040-x · Cited by 1,938
Kim, J.-O., & Mueller, C. (1978) · Sage eBooks · doi:10.4135/9781412984256 · Cited by 1,416
A Primer of Lisrel: Basic Applications and Programming for Confirmatory Factor Analytic Models
Byrne, B. M. (1989) · Cited by 1,188
Cited by
A critical review of 3D printing in construction: benefits, challenges, and risks
El-Sayegh, S., Romdhane, L., & Manjikian, S. (2020) · Archives of Civil and Mechanical Engineering · doi:10.1007/s43452-020-00038-w · Cited by 387
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Factors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
“…a thorough literature examination, typically including Akintoye and Macleod (1997), Kaming et al. (1997), Shen et al. (2001), Fang et al. (2004), Ghosh and Jintannapakanont (2004), Wang and Liu (2004), Zou et al. (2007), and Tang et al. (2007), was carried out in order to develop in-depth…”
BackgroundKuo, Y.-C., & Lu, S.-T. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.003 · Cited by 199
“Political and social Ghosh and Jintanapakanont (2004) 6.”
BackgroundAnalyzing Causes for Reworks in Construction Projects in China
Ye, G., Jin, Z., Xia, B., & Skitmore, M. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000347 · Cited by 178
An Analytical Network Process model for risks prioritisation in megaprojects
Boateng, P., Chen, Z., & Ogunlana, S. O. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.08.007 · Cited by 172
QUANTITATIVE RISK ASSESSMENT OF MEGA REAL ESTATE PROJECTS: A MONTE CARLO SIMULATION APPROACH
Chief Executive Officer (CEO), G. H. L. (. G., & Jahid, M. S. R. (2022) · Journal of Sustainable Development and Policy · doi:10.63125/nh269421 · Cited by 3
Metadata
- Authors
- Ghosh, S., & Jintanapakanont, J.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2004-11
- Volume
- 22
- Issue
- 8
- Pages
- 633-643
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2074408720
- Cited by
- 242
- References
- 34
- FWCI
- 1.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.