Improving project management performance of large contractors using benchmarking approach
The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
Handbook of Research Design and Social Measurement.
McLemore, D., & Miller, D. C. (1978) · Contemporary Sociology · doi:10.2307/2064762 · Cited by 1,269
The Logical Framework Method for Defining Project Success
Baccarini, D. (1999) · Project Management Journal · doi:10.1177/875697289903000405 · Cited by 1,136 · cited 2×
“New frameworks have been proposed to consider success criteria [26] and to define project success [27].”
BackgroundMethodMeasurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977 · cited 2×
“Success factors and criteria have been also identified through summarizing several research works [28].”
BackgroundMethodKey performance indicators for measuring construction success
Chan, A. P. C., & Chan, A. P. L. (2004) · Benchmarking: An International Journal · doi:10.1108/14635770410532624 · Cited by 968 · cited 3×
“Furthermore, Chan and Chan [36] suggested a set of KPIs to formulate a framework for measuring and benchmarking the success of selected construction projects.”
BackgroundMethod(2015) · Uptime · doi:10.1201/b18778-13 · Cited by 805
Performance management in construction: a conceptual framework
Kagioglou, M., Cooper, R., & Aouad, G. F. (2001) · Construction Management and Economics · doi:10.1080/01446190010003425 · Cited by 605
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 474 · cited 2×
“However, regarding perceptions of project success, Wateridge [31] confirmed that project managers often concentrated on the success factors without success criteria whereas users may be more concerned about their happiness with performance in the long-term.”
BackgroundMethodLarge construction projects in developing countries: a case study from Vietnam
Long, N. D., Ogunlana, S. O., Quang, T., & Lam, K. C. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.03.004 · Cited by 467 · cited 1×
“A recent study on large construction projects in Vietnam [46] also confirmed above problems.”
BackgroundA study on project success factors in large construction projects in Vietnam
Duy Nguyen, L., Ogunlana, S. O., & Thi Xuan Lan, D. (2004) · Engineering, Construction and Architectural Management · doi:10.1108/09699980410570166 · Cited by 415 · cited 2×
“[29] uncovered 15 project success factors grouped under four COMs: comfort, competence, commitment and communication.”
BackgroundMethodConstruction delays in a fast-growing economy: Comparing Thailand with other economies
Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00052-6 · Cited by 390 · cited 1×
“‘‘The Federation Internationale Des Ingenieurs-Councils (FIDIC) form of contract is mainly used with modifications to meet local laws and project requirements’’ [47].”
BackgroundHandbook of Research Design and Social Measurement
Davis, L. (1992) · The Nurse Practitioner · doi:10.1097/00006205-199202000-00029 · Cited by 345
Handbook of Research Design and Social Measurement
Woodside, A. G., & Miller, D. C. (1993) · Journal of Marketing Research · doi:10.2307/3172834 · Cited by 228
Kozak, M. (2002) · Annals of Tourism Research · doi:10.1016/s0160-7383(01)00072-x · Cited by 195
Productivity in the tourism industry
Barros, C. P., & Alves, F. P. (2004) · International Advances in Economic Research · doi:10.1007/bf02296216 · Cited by 185
Success factors for achieving high service revenues in manufacturing companies
Gebauer, H., Friedli, T., & Fleisch, E. (2006) · Benchmarking: An International Journal · doi:10.1108/14635770610668848 · Cited by 179 · cited 1×
“Other efforts has recently been paid to examples of the effectiveness of benchmarking, but they have focused on application oriented [20], promoting profitability of benchmarking [21,22] as well as its possible benefits [23], results oriented [24] and method oriented [25].”
BackgroundThe role of structural factors in determining project management success
Might, R. J., & Fischer, W. A. (1985) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1985.6447584 · Cited by 178
An empirical investigation of project evaluation criteria
Tukel, O. I., & Rom, W. O. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110364704 · Cited by 171 · cited 2×
“A set of raw KPIs was initially uncovered from a rigorous literature review of previous studies on KPIs/success criteria [2,8,26–41,43].”
BackgroundMethodEvaluation of factors affecting time and cost performance in Hong Kong building projects
Dissanayaka, S. M., & Kumaraswamy, M. M. (1999) · Engineering Construction & Architectural Management · doi:10.1108/eb021119 · Cited by 119
Johnston, R., & Bate, J. D. (2003) · Thammasat University Digital Collections · Cited by 80
A conceptual framework for studying customer satisfaction in residential construction
Forsythe, P. J. (2007) · Construction Management and Economics · doi:10.1080/01446190600771439 · Cited by 64 · cited 2×
“Since customer satisfaction is an elusive concept related to various aspects of human perceptions [49], CIC8 must adapt itself to the best practices of competitors discussed in other sections to improve above bad performance.”
BackgroundSatisfying stakeholders for successful project management
Mallak, L. A., Patzak, G., & Kurstedt, H. A. (1991) · Computers & Industrial Engineering · doi:10.1016/0360-8352(91)90130-x · Cited by 33 · cited 3×
“Normally, customers expect the project completion as planed, quickly, inexpensively, and at the best quality possible whereas capital suppliers want more information for assessing the risk of their investment [33].”
BackgroundMethodProfitability in professional sports and benchmarking: the case of NBA franchises
Nourayi, M. M. (2006) · Benchmarking An International Journal · doi:10.1108/14635770610668776 · Cited by 16 · cited 1×
“Other efforts has recently been paid to examples of the effectiveness of benchmarking, but they have focused on application oriented [20], promoting profitability of benchmarking [21,22] as well as its possible benefits [23], results oriented [24] and method oriented [25].”
Background
Cited by
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Zuo, J., Zhao, X., Nguyen, Q. B. M., Ma, T., & Gao, S. (2018) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-01-2016-0016 · Cited by 172
Investment evaluation within project management: an information systemsperspective
Irani, Z. (2010) · Journal of the Operational Research Society · doi:10.1057/jors.2010.10 · Cited by 72
“Luu et al (2008) present those key performance indicators with evaluation approaches used within the construction sector, Jones and Hughes (2001) detail those from the private sector, while Irani and Love (2001) explain those used in the manufacturing sector.”
Method
Metadata
- Authors
- Luu, V. T., Kim, S.-Y., & Huynh, T.-A.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2008-10
- Volume
- 26
- Issue
- 7
- Pages
- 758-769
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2047504177
- Cited by
- 208
- References
- 23
- FWCI
- 7.15
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.