Project complexity and systems integration: Constructing the London 2012 Olympics and Paralympics Games
Open accessThe DOI matches its Crossref record; 62 of the 62 references it cites were found in a registry or an index.
Abstract
Our study of the London Olympics 2012 construction programme showed that systems integration is one of the major challenges involved in delivery of a complex – “system of systems” or array – project. Organizations cope with complexity by decomposing a project into different levels of systems integration with clearly-defined interfaces and buffers between levels and individual component subsystems. At the “meta systems integration” level, an organization has to be established with the capabilities to understand the total system of systems, manage external interfaces with the multiple stakeholder sand coordinate the integration of its component parts. At the “system integration” level, efforts are made to manage each individual system as a loosely-coupled, relatively self-contained subsystem with defined interfaces to coordinate interdependencies with other parts of overall array. Establishing processes to maintain stability whilst responding dynamically to uncertain and changing conditions is one of the most challenging aspects of systems integration.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Five misunderstandings about case-study research
Flyvbjerg, B. (2006) · Qualitative Inquiry · doi:10.1177/1077800405284363 · Cited by 14,266 · cited 1×
“As long as it is carefully chosen, a case can be used to develop generalizations about how things work which may be appropriate and valid for a larger number of samples (Flyvbjerg, 2006).”
BackgroundBurns, T., & Stalker, G. M. (1994) · doi:10.1093/acprof:oso/9780198288787.001.0001 · Cited by 7,250
Educational Organizations as Loosely Coupled Systems
Weick, K. E. (1976) · Administrative Science Quarterly · doi:10.2307/2391875 · Cited by 5,142
Normal Accidents: Living with High Risk Technologies
Grimes, A. J., & Perrow, C. (1985) · The Academy of Management Review · doi:10.2307/257982 · Cited by 4,960
The Architecture of Complexity
Simon, H. A. (1991) · Facets of Systems Science · doi:10.1007/978-1-4899-0718-9_31 · Cited by 4,433
Organization and Environment: Managing Differentiation and Integration.
Hall, R. H., Lawrence, P. R., & Lorsch, J. W. (1968) · Administrative Science Quarterly · doi:10.2307/2391270 · Cited by 4,325
Longitudinal Field Research on Change: Theory and Practice
Pettigrew, A. M. (1990) · Organization Science · doi:10.1287/orsc.1.3.267 · Cited by 4,221
Organizations in Action: Social Science Bases of Administrative Theory.
Udy, S. H., & Thompson, J. D. (1968) · American Sociological Review · doi:10.2307/2092248 · Cited by 4,134
General System Theory: Foundations, Development, Applications
Edmonds, E. A., & von Bertalanffy, L. (1977) · Leonardo · doi:10.2307/1573450 · Cited by 3,674
Structure in Fives: Designing Effective Organizations.
Berniker, E., & Mintzberg, H. (1984) · Administrative Science Quarterly · doi:10.2307/2393181 · Cited by 2,724
Cited by
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
Denicol, J., Davies, A., & Krystallis, I. (2020) · Project Management Journal · doi:10.1177/8756972819896113 · Cited by 266
Self-citationExplicating the dynamics of project capabilities
Davies, A., & Brady, T. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.006 · Cited by 265
Self-citationManaging Structural and Dynamic Complexity: A Tale of Two Projects
Brady, T., & Davies, A. (2014) · Project Management Journal · doi:10.1002/pmj.21434 · Cited by 236
“Some authors have adopted the systems view to make distinctions between different types of projects according to their complexity (Hobday, 1998; Shenhar & Dvir, 1996, 2007; Shenhar, 2001; Davies & Mackenzie, 2014) relating this to the complexity of the product and/ or outcome of the project.”
BackgroundInfluentialSelf-citationWhyte, J., Stasis, A., & Lindkvist, C. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.006 · Cited by 236
“Their delivery requires systems integration capabilities, as complex product systems are designed and integrated through a network of component and sub-system suppliers (Davies and Mackenzie, 2014; Davies et al., 2009; Hobday et al., 2005).”
BackgroundClash of the Titans: Temporal Organizing and Collaborative Dynamics in the Panama Canal Megaproject
van Marrewijk, A., Ybema, S., Smits, K., Clegg, S., & Pitsis, T. (2016) · Organization Studies · doi:10.1177/0170840616655489 · Cited by 188
“For example, with the Olympics Delivery Authority as principal, CH led a consortium for the London Olympics 2012 programme as the responsible delivery partner interfacing with individual construction projects (Davies & Mackenzie, 2014).”
BackgroundWinch, G., & Leiringer, R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.002 · Cited by 185
“We also need to understand more about which systems integration capabilities the owner needs to retain engagement in the process and ensure asset integration and which can be outsourced (cf. Davies and Mackenzie, 2014).”
BackgroundDynamic Capabilities in Complex Projects: The Case of London Heathrow Terminal 5
Davies, A., Dodgson, M., & Gann, D. (2016) · Project Management Journal · doi:10.1002/pmj.21574 · Cited by 180
“The most complex type of project is large in scale and comprised of a collection of interrelated systems designed to achieve a common purpose, such as a mass transit urban railway system and major sporting event (Shenhar & Dvir, 2007; Davies & Mackenzie, 2014; Brady & Davies, 2014).”
BackgroundSelf-citationHow Digital Information Transforms Project Delivery Models
Whyte, J. (2019) · Project Management Journal · doi:10.1177/8756972818823304 · Cited by 165
“On the London 2012 Olympics, systems integration has been characterized by Davies and Mackenzie (2014).”
BackgroundMethodZhang, X., Denicol, J., Chan, P. W., & Le, Y. (2024) · Journal of Operations Management · doi:10.1002/joom.1275 · Cited by 44
The dynamics of systems integration: Balancing stability and change on London's Crossrail project
Muruganandan, K., Davies, A., Denicol, J., & Whyte, J. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.03.007 · Cited by 36
Self-citation
Metadata
- Authors
- Davies, A., & Mackenzie, I.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2014-07
- Volume
- 32
- Issue
- 5
- Pages
- 773-790
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2044225403
- Cited by
- 277
- References
- 62
- FWCI
- 16.77
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.