Cost overrun in the Malaysian construction industry projects: A deeper insight
The DOI matches its Crossref record; 41 of the 41 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Good Research Guide: For Small-Scale Social Research Projects
Denscombe, M. (1998) · Cited by 4,557
Design and analysis of pilot studies: recommendations for good practice
Lancaster, G. A., Dodd, S., & Williamson, P. R. (2004) · Journal of Evaluation in Clinical Practice · doi:10.1111/j..2002.384.doc.x · Cited by 2,572
The good research guide for small-scale social research projects.
Kane, M. (1999) · Family Practice · doi:10.1093/fampra/16.2.207-a · Cited by 1,731
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
The concept of project complexity—a review
Baccarini, D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00093-3 · Cited by 1,192 · cited 1×
“Such tendency has been attributed to increased complexity of refurbishment projects when compared to new build (Baccarini, 1996; Murray, 2000).”
BackgroundUnderestimating Costs in Public Works Projects:Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002) · Journal of the American Planning Association · doi:10.1080/01944360208976273 · Cited by 1,046
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00055-8 · Cited by 796 · cited 1×
“, 2013) and the significance of this, has attracted much research over recent decades (Arditi et al., 1985; Creedy, 2004; Dawood, 1998; Dlakwa and Culpin, 1990; Doloi, 2013; Frimpong et al., 2003; Kaming et al., 1997; Koushki et al., 2005; Mansfield et al., 1994).”
BackgroundHow common and how large are cost overruns in transport infrastructure projects?
Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003) · Transport Reviews · doi:10.1080/01441640309904 · Cited by 783 · cited 1×
“Approximately 45% of projects were completed at or below contract sum; the remainder overran — supporting extant literature stating that negative variance is more common than positive variance (Flyvbjerg et al., 2003; Morris and Hough, 1987; Skamris and Flyvbjerg, 1997).”
BackgroundAnalysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745 · cited 2×
“Several scholars (Doloi et al., 2012; Enshassi et al., 2009; Memon et al., 2013) have identified with the need for greater insight into cost estimation (contract sum) and overrun in construction projects.”
BackgroundFactors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698 · cited 1×
“, 2013) and the significance of this, has attracted much research over recent decades (Arditi et al., 1985; Creedy, 2004; Dawood, 1998; Dlakwa and Culpin, 1990; Doloi, 2013; Frimpong et al., 2003; Kaming et al., 1997; Koushki et al., 2005; Mansfield et al., 1994).”
BackgroundSelf-citation
Cited by
Effect of lean tools to control external environment risks of construction projects
Ansah, R. H., & Sorooshian, S. (2017) · Sustainable Cities and Society · doi:10.1016/j.scs.2017.03.027 · Cited by 92
Metadata
- Authors
- Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2014-11
- Volume
- 32
- Issue
- 8
- Pages
- 1471-1480
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2016324626
- Cited by
- 210
- References
- 41
- FWCI
- 13.96
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.