Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Open accessThe DOI matches its Crossref record; 95 of the 95 references it cites were found in a registry or an index.
Abstract
Abstract BIM-based Construction Networks (BbCNs) are teams comprising members from several specialist organisations to undertake BIM-related tasks on BIM-enabled projects. Fostering collaboration within BbCNs is a top priority for construction project managers, yet no explicit body of knowledge has focused on investigating the relevant research gaps in knowledge. The present study intends to address this gap by plotting the storyline of relevant research studies in the last 10 years (2006–2016). A “ Collaboration Pentagon ” consisted of context, process, task, team and actor as the theoretical lens is created through integration of relevant frameworks. The study draws upon a bibliometric analysis of 1031 studies on BIM alongside the outcome of a qualitative evaluation of a total of 62 carefully selected papers on collaboration in BbCNs. The findings reveal that the scholarship on collaboration on BIM-enabled projects has predominately focused on technology as one antecedent of collaboration while project-related and managerial antecedents have remained under-researched. Moreover, though enhancing collaboration necessitates inclusion of all influential antecedents, studies with such an all-inclusive perspective are rare. The study contributes to the field through this inclusive Collaboration Pentagon and by providing a systematic and objective evaluation of available literature on collaboration in BbCNs and uncovering respective gaps.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Software survey: VOSviewer, a computer program for bibliometric mapping
van Eck, N. J., & Waltman, L. (2010) · Scientometrics · doi:10.1007/s11192-009-0146-3 · Cited by 21,484
(1984) · Cited by 21,166
The Coding Manual for Qualitative Researchers
Saldana, J. (2025) · SAGE Publications Ltd eBooks · doi:10.4135/9781036235611 · Cited by 17,944
Gephi: An Open Source Software for Exploring and Manipulating Networks
Bastian, M., Heymann, S., & Jacomy, M. (2009) · Proceedings of the International AAAI Conference on Web and Social Media · doi:10.1609/icwsm.v3i1.13937 · Cited by 11,675
(1998) · UWA Profiles and Research Repository (UWA) · Cited by 4,686
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Visualizing Bibliometric Networks
van Eck, N. J., & Waltman, L. (2014) · Measuring Scholarly Impact · doi:10.1007/978-3-319-10377-8_13 · Cited by 3,342
Science mapping software tools: Review, analysis, and cooperative study among tools
Cobo, M. J., López-Herrera, A. G., Herrera-Viedma, E., & Herrera, F. (2011) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.21525 · Cited by 3,242
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
Volk, R., Stengel, J., & Schultmann, F. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.10.023 · Cited by 2,199
Cited by
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Deng, M., Menassa, C. C., & Kamat, V. R. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.005 · Cited by 422
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Jin, R., Yuan, H., & Chen, Q. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.09.029 · Cited by 380
Wuni, I. Y., Shen, G. Q. P., & Osei-Kyei, R. (2019) · Energy and Buildings · doi:10.1016/j.enbuild.2019.02.010 · Cited by 370
A holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Virtual reality applications for the built environment: Research trends and opportunities
Zhang, Y., Liu, H., Kang, S.-C., & Al-Hussein, M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103311 · Cited by 361
Ghosh, A., Edwards, D. J., & Hosseini, M. R. (2020) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-04-2020-0271 · Cited by 275
Self-citationCollaboration barriers in BIM-based construction networks: A conceptual model
Oraee, M., Hosseini, M. R., Edwards, D. J., Li, H., Papadonikolaki, E., & Cao, D. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.05.004 · Cited by 251
“1, denotes that all factors that affect collaboration in BbCNs, although interrelated, come under the following five categories: context, process, team, task and actor (cf. Oraee et al., 2017b; Patel et al., 2012).”
BackgroundMethodResultInfluentialSelf-citationA holistic review of cement composites reinforced with graphene oxide
Xu, Y., Zeng, J., Chen, W., Jin, R., Li, B., & Pan, Z. (2018) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2018.03.147 · Cited by 243
“Scopus has also been recommended by other studies [30,31] as the search engine of literature.”
BackgroundBaghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., & Roshdi Laleh, S. (2022) · Buildings · doi:10.3390/buildings12101503 · Cited by 242
Huang, S., Wang, H., Ahmad, W., Ahmad, A., Ivanovich Vatin, N., Mohamed, A. M., Deifalla, A. F., & Mehmood, I. (2022) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph19084556 · Cited by 230
Recent advancements of robotics in construction
Xiao, B., Chen, C., & Yin, X. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104591 · Cited by 204
Mobile advertising: A systematic literature review and future research agenda
Jebarajakirthy, C., Maseeh, H. I., Morshed, Z., Shankar, A., Arli, D., & Pentecost, R. (2021) · International Journal of Consumer Studies · doi:10.1111/ijcs.12728 · Cited by 202
A Decade of Modern Bridge Monitoring Using Terrestrial Laser Scanning: Review and Future Directions
Rashidi, M., Mohammadi, M., Sadeghlou Kivi, S., Abdolvand, M. M., Truong-Hong, L., & Samali, B. (2020) · Remote Sensing · doi:10.3390/rs12223796 · Cited by 200
Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P., & Ruparathna, R. (2023) · Asian Journal of Civil Engineering · doi:10.1007/s42107-022-00501-4 · Cited by 193
“, 2013; Smith, 2014) along with BIM-based site collaboration (Liu et al., 2017; Oraee et al., 2017), and specific management practices related to BIM (Wong et al.”
BackgroundA study of literature in modular integrated construction - Critical review and future directions
Abdelmageed, S., & Zayed, T. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.124044 · Cited by 190
Digital Twin Research in the AECO-FM Industry
Ozturk, G. B. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102730 · Cited by 180
A scientometric review of waste material utilization in concrete for sustainable construction
Ahmad, W., Ahmad, A., Ostrowski, K. A., Aslam, F., & Joyklad, P. (2021) · Case Studies in Construction Materials · doi:10.1016/j.cscm.2021.e00683 · Cited by 170
Ultraviolet ageing of bituminous materials: A comprehensive literature review from 2011 to 2022
Polo-Mendoza, R., Martinez-Arguelles, G., Walubita, L. F., Moreno-Navarro, F., Giustozzi, F., Fuentes, L., & Navarro-Donado, T. (2022) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2022.128889 · Cited by 167
Lee, J. S., Ham, Y., Park, H., & Kim, J. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.104119 · Cited by 165
Papadonikolaki, E., van Oel, C., & Kagioglou, M. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.010 · Cited by 161
Self-citationDigital Twin Technology for Bridge Maintenance using 3D Laser Scanning: A Review
Hosamo, H. H., & Hosamo, M. H. (2022) · Advances in Civil Engineering · doi:10.1155/2022/2194949 · Cited by 103
“Furthermore, the size of the given nodes represents the number of papers in which the term was formed, and a variety of colors indicate different study years [36].”
BackgroundDogonyaro, I., & Elnokaly, A. (2025) · Applied Sciences · doi:10.3390/app152413038 · Cited by 2
Metadata
- Authors
- Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2017-10
- Volume
- 35
- Issue
- 7
- Pages
- 1288-1301
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2742493246
- Cited by
- 415
- References
- 95
- FWCI
- 25.86
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.