A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Open accessAbstract
In recent years, green building has attracted wide attention from both academia and industry. As green building projects are inevitably plagued with risks, this study attempted to assess the risks in green building projects in Singapore. Categorizing a list of 28 risk factors into 11 groups, the study performed a questionnaire survey and received 31 responses from project managers in Singapore. A risk assessment model was developed using the fuzzy synthetic evaluation approach. Using the proposed model, the likelihood of occurrence, magnitude of impact and risk criticality of each risk factor, group and the overall risk were calculated. “Inaccurate cost estimation” was the top risk factor, and “cost overrun risk” was the most critical risk group. The overall risk criticality was high, implying risk management was still necessary for green construction in Singapore. The proposed risk assessment model is reliable and practical for professionals in the green building industry, and can be applied in risk assessment in other countries. As few studies focused on risks in green projects, this study expands the knowledge and literature.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(2007) · London School of Economics and Political Science Research Online (London School of Economics and Political Science) · Cited by 9,690
Fuzzy Set Theory—and Its Applications
Zimmermann, H.-J. (2001) · Springer eBooks · doi:10.1007/978-94-010-0646-0 · Cited by 7,526
An Introduction to Statistical Methods and Data Analysis
(1994) · Technometrics · doi:10.1080/00401706.1994.10485832 · Cited by 5,346
Green building research–current status and future agenda: A review
Zuo, J., & Zhao, Z.-Y. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.10.021 · Cited by 1,194
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
Analysis of factors influencing project cost estimating practice
Akintoye, A. (2000) · Construction Management and Economics · doi:10.1080/014461900370979 · Cited by 608
Greening Project Management Practices for Sustainable Construction
Robichaud, L. B., & Anantatmula, V. S. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000030 · Cited by 605
Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-008-0367-7 · Cited by 560
Green building project management: obstacles and solutions for sustainable development
Hwang, B., & Tan, J. S. (2012) · Sustainable Development · doi:10.1002/sd.492 · Cited by 497
Self-citationRisk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445
Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach
Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., & Ke, Y. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.006 · Cited by 428
Systematic Risk Management Approach for Construction Projects
Al‐Bahar, J. F., & Crandall, K. C. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(533 · Cited by 414
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407
Construction delays in a fast-growing economy: Comparing Thailand with other economies
Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00052-6 · Cited by 390
Impacts of heat waves and corresponding measures: a review
Zuo, J., Pullen, S., Palmer, J., Bennetts, H., Chileshe, N., & Ma, T. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.12.078 · Cited by 322
Fuzzy Multicriteria Decision-Making: Models, Methods and Applications
Pedrycz, W., Ekel, P., & Parreiras, R. (2010) · Cited by 269
Risk and its management in the Kuwaiti construction industry: a contractors’ perspective
Kartam, N. A., & Kartam, S. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00014-4 · Cited by 249
Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
Iyer, K. C., & Jha, K. N. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:8(871 · Cited by 244
Yuan, X., & Zuo, J. (2012) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.10.041 · Cited by 231
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Determining the causal structure of rework influences in construction
LOVE, P. E. D., MANDAL, P., & LI, H. (1999) · Construction Management and Economics · doi:10.1080/014461999371420 · Cited by 211
Identifying the critical factors affecting schedule performance of public housing projects
Hwang, B., Zhao, X., & Ng, S. Y. (2012) · Habitat International · doi:10.1016/j.habitatint.2012.06.008 · Cited by 197
Self-citationDeveloping a Fuzzy Risk Allocation Model for PPP Projects in China
Xu, Y., Chan, A. P. C., & Yeung, J. F. Y. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000189 · Cited by 195
Wu, P., Xia, B., & Zhao, X. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2014.04.070 · Cited by 160
Self-citationInvestigating the client-related rework in building projects: The case of Singapore
Hwang, B., Zhao, X., & Goh, K. J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.009 · Cited by 140
Self-citationDeveloping Fuzzy Enterprise Risk Management Maturity Model for Construction Firms
Zhao, X., Hwang, B., & Low, S. P. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000712 · Cited by 136
Self-citationAddressing Risks in Green Retrofit Projects: The Case of Singapore
Hwang, B., Zhao, X., See, Y. L., & Zhong, Y. (2015) · Project Management Journal · doi:10.1002/pmj.21512 · Cited by 134
Self-citationIdentification of Safety Risks for High-Performance Sustainable Construction Projects
Fortunato, B. R., Hallowell, M. R., Behm, M., et al. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000446 · Cited by 124
Risk response techniques employed currently for major projects
Baker, S., Ponniah, D. A., & Smith, S. D. (1999) · Construction Management and Economics · doi:10.1080/014461999371709 · Cited by 116
Deng, X., Low, S. P., Li, Q., & Zhao, X. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000836 · Cited by 110
Self-citationAssessing risk management capability of contractors in subway projects in mainland China
Mu, S., Cheng, H., Chohr, M., & Peng, W. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.007 · Cited by 97
The past, present and future of carbon labelling for construction materials – A review
Wu, P., Xia, B., Pienaar, J., & Zhao, X. (2014) · Building and Environment · doi:10.1016/j.buildenv.2014.03.023 · Cited by 91
Self-citationHwang, B., Zhao, X., & Ong, S. Y. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000342 · Cited by 91
Self-citationSustainability policy of construction contractors: A review
Zuo, J., Zillante, G., Wilson, L., et al. (2012) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2012.03.011 · Cited by 89
Ma, J., & Kremer, G. E. O. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.08.029 · Cited by 80
Investigating Enterprise Risk Management Maturity in Construction Firms
Zhao, X., Hwang, B., & Low, S. P. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000873 · Cited by 74
Self-citationExploring the management of sustainable construction at the programme level: a Chinese case study
Shi, Q., Zuo, J., & Zillante, G. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.683200 · Cited by 73
Huang, C., Li, F. F., Ding, T., Jin, Z., & Ma, X. (2014) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2014.2368141 · Cited by 71
Xia, B., Chan, A. P. C., & Yeung, J. F. Y. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000381 · Cited by 67
Zhao, X., Hwang, B., & Phng, W. (2013) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-0045-x · Cited by 61
Self-citationEducation for sustainability in construction management curricula
Lim, Y. S., Xia, B., Skitmore, M., Gray, J., & Bridge, A. (2015) · International Journal of Construction Management · doi:10.1080/15623599.2015.1066569 · Cited by 57
Carbon-Neutral Commercial Building Development
Zuo, J., Read, B., Pullen, S., & Shi, Q. (2012) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000127 · Cited by 56
A comparative study of the measurements of perceived risk among contractors in China
Lu, S., & Yan, H. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.001 · Cited by 54
A review of benchmarking in carbon labelling schemes for building materials
Wu, P., Feng, Y., Pienaar, J., & Xia, B. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.07.067 · Cited by 39
Singhaputtangkul, N., Low, S. P., Teo, A. L., & Hwang, B. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000198 · Cited by 38
Self-citationUnderstanding Enterprise Risk Management Maturity in Construction Firms
Zhao, X., Hwang, B., & Low, S. P. (2015) · Springer eBooks · doi:10.1007/978-3-662-46994-1_74 · Cited by 36
Self-citationWu, P., & Low, S. P. (2014) · International Journal of Construction Management · doi:10.1080/15623599.2014.899126 · Cited by 22
Cited by
A bibliometric review of green building research 2000–2016
Zhao, X., Zuo, J., Wu, G., & Huang, C. (2019) · Architectural Science Review · doi:10.1080/00038628.2018.1485548 · Cited by 339
Self-citationKey constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Self-citationDarko, A., Chan, A. P. C., Yang, Y., Shan, M., He, B.-J., & Gou, Z. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.07.318 · Cited by 291
Green building rating systems: Global reviews of practices and research efforts
Shan, M., & Hwang, B.-G. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.02.034 · Cited by 266
Self-citationIslam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Metadata
- Authors
- Zhao, X., Hwang, B.-G., & Gao, Y.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2016-03
- Volume
- 115
- Pages
- 203-213
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2186837137
- Cited by
- 279
- References
- 48
- FWCI
- 27.50
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.