The DOI matches its Crossref record; 27 of the 27 references it cites were found in a registry or an index.
Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
Open accessAbstract
Abstract Various schedule risks beset prefabrication housing production (PHP) in Hong Kong throughout the prefabrication supply chain, from design, manufacturing, logistics, to on-site assembly. Previous research on the risks in prefabrication construction projects has mainly focused on the construction stage and has been confined to issues of completeness and accuracy without consideration of stakeholder-related risks and their cause-and-effect relationships. However, in reality, the supply chain is inseparable as precast components should be manufactured and transported to sites to fit in with the schedule of on-site assembly in seamless connection manner, and most risks are interrelated and associated with various stakeholders. This study applies social network analysis (SNA) to recognize and investigate the underlying network of stakeholder-associated risk factors in prefabrication housing construction projects. Critical risks and relationships that have important roles in structuring the entire network of PHP are identified and analyzed. BIM (Building Information Modeling)-centered strategies are proposed to facilitate stakeholder communication and mitigate critical schedule risks and interactions underlying the risk network. This study not only provides an effective method to analyze stakeholder-associated risk factors and to evaluate the effect of these risk factors from a network perspective, but also offers a new visual perspective in the promotion of the use of the Internet of things (IoT) and helps identify housing construction problems in Hong Kong.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Social Network Analysis: Methods and Applications
Wasserman, S. S., & Faust, K. (1994) · Cited by 17,993
Snowball Sampling: Problems and Techniques of Chain Referral Sampling
Biernacki, P., & Waldorf, D. (1981) · Sociological Methods & Research · doi:10.1177/004912418101000205 · Cited by 5,464
Network Analysis in the Social Sciences
Borgatti, S. P., Mehra, A., Brass, D. J., & Labianca, G. (2009) · Science · doi:10.1126/science.1165821 · Cited by 4,254
A New Status Index Derived from Sociometric Analysis
Katz, L. (1953) · Psychometrika · doi:10.1007/bf02289026 · Cited by 3,866
Social network analysis: a powerful strategy, also for the information sciences
Otte, E. (2002) · Journal of Information Science · doi:10.1177/016555102762202123 · Cited by 1,709
Structures of Mediation: A Formal Approach to Brokerage in Transaction Networks
Gould, R. V., & Fernandez, R. M. (1989) · Sociological Methodology · doi:10.2307/270949 · Cited by 1,332
Towards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Critical review of the research on the management of prefabricated construction
Li, C. Z., Shen, Q., & Xue, X. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.04.001 · Cited by 519
Self-citationConstruction Delays and Their Causative Factors in Nigeria
Aibinu, A. A., & Odeyinka, H. A. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(667 · Cited by 348
Hong Kong annual digest of statistics
Census, H. K., & 香港特別行政區政府統計處 (1978) · Govt. Printer eBooks · Cited by 347
Yang, R. J., & Zou, P. X. W. (2014) · Building and Environment · doi:10.1016/j.buildenv.2013.12.014 · Cited by 321
Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model
Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.10.030 · Cited by 304
Self-citationScenarios for applying RFID technology in construction project management
Lu, W., Huang, G. Q., & Li, H. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.007 · Cited by 261
Best practice of prefabrication implementation in the Hong Kong public and private sectors
Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.09.045 · Cited by 212
Measuring the impact of prefabrication on construction waste reduction: An empirical study in China
Li, Z., Shen, G. Q., & Alshawi, M. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2014.07.013 · Cited by 209
Self-citationIdentifying best design strategies for construction waste minimization
Wang, J., Li, Z., & Tam, V. W. Y. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.12.076 · Cited by 186
Competitive dialogue procedure for sustainable public procurement
Uttam, K., & Roos, C. L. L. (2014) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.08.031 · Cited by 175
Hossen, M. M., Kang, S.-K., & Kim, J. (2015) · Nuclear Engineering and Technology · doi:10.1016/j.net.2014.12.019 · Cited by 152
Parise, S. (2007) · Advances in Developing Human Resources · doi:10.1177/1523422307304106 · Cited by 146
Li, J., Tam, V. W. Y., Zuo, J., & Zhu, J. (2015) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.009 · Cited by 140
Caniato, M., Vaccari, M., Visvanathan, C., & Zurbrügg, C. (2014) · Waste Management · doi:10.1016/j.wasman.2014.02.011 · Cited by 125
Mojtahedi, M., Mousavi, S. M., & Makui, A. (2010) · Safety Science · doi:10.1016/j.ssci.2009.12.016 · Cited by 121
Prefabrication as a mean of minimizing construction waste on site
Tam, V. W. Y., & Hao, J. J. L. (2014) · International Journal of Construction Management · doi:10.1080/15623599.2014.899129 · Cited by 121
Use of Prefabrication to Minimize Construction Waste - A Case Study Approach
Tam, C. M., Tam, V. W. Y., Chan, J. K. W., & Ng, W. C. Y. (2005) · International Journal of Construction Management · doi:10.1080/15623599.2005.10773069 · Cited by 116
System dynamic modeling on construction waste management in Shenzhen, China
Tam, V. W. Y., Li, J., & Cai, H. (2014) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x14527636 · Cited by 66
Life Cycle Inventory analysis of a precast reinforced concrete shed for goods storage
Ingrao, C., Giudice, A. L., Mbohwa, C., & Clasadonte, M. T. (2014) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.05.030 · Cited by 32
Cited by
Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.001 · Cited by 420
Self-citationBuilding information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357
Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272
Self-citationBIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
Akbarieh, A., Jayasinghe, L. B., Waldmann, D., & Teferle, F. N. (2020) · Sustainability · doi:10.3390/su12072670 · Cited by 183
Metadata
- Authors
- Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2016-10
- Volume
- 134
- Pages
- 482-494
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2309485017
- Cited by
- 282
- References
- 27
- FWCI
- 24.52
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.