The DOI matches its Crossref record; 31 of the 31 references it cites were found in a registry or an index.
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Open accessAbstract
Abstract Prefabricated construction has attracted worldwide concern because of its significant role in the creation of sustainable urbanization. In Mainland China, the practice of applying prefabrication technology in the construction industry still lags behind. In fact, the economic benefit is a key concern of various stakeholders involved in the construction process and is expected to influence the delivery of prefabricated buildings significantly. Therefore, this study established a cost–benefit analysis framework to explore the basic cost composition of prefabrication and examined the effect of adopting prefabrication on the total cost of real building projects. Results show that the concrete and steel used in the typical prefabricated components were responsible for 26% to 60% of the total cost, followed by labor cost (17%–30%) and transportation (10%). The average incremental cost is highly linearly correlated with the prefabrication rate, which ranged from 237 yuan/m2 to 437 yuan/m2, in eight building projects. To fully gain the economic benefits from the precast construction, the future focus should lie in providing financial support for promoting the development of prefabrication technology, optimizing the structure integrity of prefabricated buildings, and improving the maturity of the precast market.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Towards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628
Critical review of the research on the management of prefabricated construction
Li, C. Z., Shen, Q., & Xue, X. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.04.001 · Cited by 519
Mao, C., Shen, Q., Shen, L., & Tang, L. (2013) · Energy and Buildings · doi:10.1016/j.enbuild.2013.07.033 · Cited by 513
Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy
Blengini, G. A. (2009) · Building and Environment · doi:10.1016/j.buildenv.2008.03.007 · Cited by 492
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
Jaillon, L., & Poon, C. S. (2008) · Construction Management and Economics · doi:10.1080/01446190802259043 · Cited by 405
Jaillon, L., & Poon, C. S. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.09.002 · Cited by 367
Perspectives of UK housebuilders on the use of offsite modern methods of construction
Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007) · Construction Management and Economics · doi:10.1080/01446190600827058 · Cited by 357
Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model
Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.10.030 · Cited by 304
Self-citationScenarios for applying RFID technology in construction project management
Lu, W., Huang, G. Q., & Li, H. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.007 · Cited by 261
Cited by
Ferdous, W., Bai, Y., Ngo, T. D., Manalo, A., & Mendis, P. (2019) · Engineering Structures · doi:10.1016/j.engstruct.2019.01.061 · Cited by 681
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Jin, R., Yuan, H., & Chen, Q. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.09.029 · Cited by 380
A holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357
Performance Review of Prefabricated Building Systems and Future Research in Australia
Navaratnam, S., Ngo, T., Gunawardena, T., & Henderson, D. (2019) · Buildings · doi:10.3390/buildings9020038 · Cited by 310
Challenges in current construction and demolition waste recycling: A China study
Ma, M., Tam, V. W. Y., Le, K. N., & Li, W. (2020) · Waste Management · doi:10.1016/j.wasman.2020.09.030 · Cited by 259
Hao, J., Chen, Z., Zhang, Z., & Loehlein, G. (2021) · Environmental Science and Pollution Research · doi:10.1007/s11356-020-09026-2 · Cited by 69
Recycled construction and demolition waste material: a cost–benefit analysis under uncertainty
Tseng, M.-L., Jeng, S.-Y., Lin, C.-W., & Lim, M. K. (2021) · Management of Environmental Quality: An International Journal · doi:10.1108/meq-08-2020-0175 · Cited by 19
Metadata
- Authors
- Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2018-01
- Volume
- 172
- Pages
- 649-660
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2765538283
- Cited by
- 503
- References
- 31
- FWCI
- 28.88
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.