The DOI matches its Crossref record; 14 of the 14 references it cites were found in a registry or an index.
Perspectives of UK housebuilders on the use of offsite modern methods of construction
Open accessAbstract
Despite an increasing demand for housing and wider concerns over the need to improve performance, the industry seems to be reluctant to adopt offsite technologies. Many studies have attempted to scrutinize the barriers and seek ways forward, but the perspectives of housebuilders remain unclear. UK housebuilders' views on the use of offsite modern methods of construction (offsite MMC) have been investigated. This investigation was carried out through a combination of personal interviews and a questionnaire survey of the top 100 housebuilders by unit completion. Results suggest that the traditional drivers of time, cost, quality and productivity are still driving the industry in deciding whether to use offsite technologies. Nearly two‐thirds of the firms believed that there needs to be an increase in the take‐up of such technologies. However, current barriers relate to a perceived higher capital cost, complex interfacing, long lead‐in time and delayed planning process. Strategies recommended are centred on changing peoples' perceptions, improving procurement, providing better cost data, tackling planning and regulations, encouraging political levers and providing practical guidance. The suggestions present a model for encouraging the take‐up of offsite MMC in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Rogers, E. M., Singhal, A., & Quinlan, M. M. (2019) · An Integrated Approach to Communication Theory and Research · doi:10.4324/9780203710753-35 · Cited by 37,322
Valente, T. W. (2003) · Genetics in Medicine · doi:10.1097/01.gim.0000061743.67794.c4 · Cited by 13,723
Questionnaire Design, Interviewing and Attitude Measurement
Albuam, G., & Oppenheim, A. N. (1993) · Journal of Marketing Research · doi:10.2307/3172892 · Cited by 4,971
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)90503-3 · Cited by 2,873
Gregory, S. (1985) · Design Studies · doi:10.1016/0142-694x(85)90029-8 · Cited by 1,177
Crossing the chasm : marketing and selling disruptive products to mainstream customers
Moore, G. A. (2014) · Cited by 1,159
From client to project stakeholders: a stakeholder mapping approach
Newcombe, R. (2003) · Construction Management and Economics · doi:10.1080/0144619032000072137 · Cited by 424
Re-engineering through pre-assembly: client expectations and drivers
Gibb, A., & Isack, F. (2003) · Building Research & Information · doi:10.1080/09613210302000 · Cited by 397
Self-citationStandardization and pre-assembly- distinguishing myth from reality using case study research
Gibb, A. (2001) · Construction Management and Economics · doi:10.1080/01446190010020435 · Cited by 296
Self-citationSubcontractor perspectives on supply chain alliances
Dainty, A. R. J., Briscoe, G. H., & Millett, S. J. (2001) · Construction Management and Economics · doi:10.1080/01446190110089727 · Cited by 291
Self-citation
Cited by
Ferdous, W., Bai, Y., Ngo, T. D., Manalo, A., & Mendis, P. (2019) · Engineering Structures · doi:10.1016/j.engstruct.2019.01.061 · Cited by 681
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.171 · Cited by 503
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
Self-citationKey constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Performance Review of Prefabricated Building Systems and Future Research in Australia
Navaratnam, S., Ngo, T., Gunawardena, T., & Henderson, D. (2019) · Buildings · doi:10.3390/buildings9020038 · Cited by 310
Metadata
- Authors
- Pan, W., Gibb, A. G. F., & Dainty, A. R. J.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2007-02
- Volume
- 25
- Issue
- 2
- Pages
- 183-194
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W1964517869
- Cited by
- 357
- References
- 14
- FWCI
- 15.32
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Perspectives of UK housebuilders on the use of offsite modern methods of construction. https://app.cochat.ai/papers/10.1080/01446190600827058
- The paper
- Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics. https://doi.org/10.1080/01446190600827058
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.