The DOI matches its Crossref record; 78 of the 78 references it cites were found in a registry or an index.
Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment
Open accessAbstract
The need to use Building Information Modelling (BIM) for Construction and Demolition Waste (CDW) minimisation is well documented but most of the existing CDW management tools still lack BIM functionality. This study therefore assesses the expectations of stakeholders on how BIM could be employed for CDW management. After a review of extant literature to assess the limitations of existing CDW management tools, qualitative Focus Group Interviews (FGIs) were conducted with professionals who are familiar with the use of BIM to understand their expectations on the use of BIM for CDW management. The 22 factors identified from the qualitative data analyses were then developed into a questionnaire survey. The exploratory factor analysis of the responses reveals five major groups of BIM expectations for CDW management, which are: (i) BIM-based collaboration for waste management, (ii) waste-driven design process and solutions, (iii) waste analysis throughout building lifecycle, (iv) innovative technologies for waste intelligence and analytics, and (v) improved documentation for waste management. Considering these groups of factors is key to meeting the needs of the stakeholders regarding the use of BIM for CDW management. These groups of factors are important considerations for the implementation and acceptance of BIM-based tools and practices for CDW management within the construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
Creswell, J. W. (1994) · Cited by 35,472
Discovering Statistics Using SPSS
Field, A. P., & Miles, J. N. V. (2000) · Medical Entomology and Zoology · Cited by 28,284
Qualitative Inquiry and Research Design: Choosing Among Five Approaches
Lewis, S. (2015) · Health Promotion Practice · doi:10.1177/1524839915580941 · Cited by 22,105
Research design: qualitative, quantitative, and mixed methods approaches
Caldas, M. P. (2003) · Revista de Administração Contemporânea · doi:10.1590/s1415-65552003000100015 · Cited by 18,745
(2017) · Cited by 16,036
Phenomenological research methods
Moustakas, C. (1994) · doi:10.4135/9781412995658 · Cited by 13,919
An Introduction to Qualitative Research
Flick, U. (2023) · SAGE Publications Ltd eBooks · doi:10.4135/9781036231712 · Cited by 8,198
Achieving integration in mixed methods designs-principles and practices
Fetters, M. D., Curry, L. A., & Creswell, J. W. (2013) · Health Services Research · doi:10.1111/1475-6773.12117 · Cited by 7,219 · cited 1×
“According to Fetters et al. (2013), chief among the bene fi ts is the use of quantitative data analyses to explain and generalise fi ndings from qualitative analysis.”
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Wang, X. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v12i3.2749 · Cited by 1,495
Sustainability in the construction industry: A review of recent developments based on LCA
Ortiz, O., Castells, F., & Sonnemann, G. (2009) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2007.11.012 · Cited by 1,340
Introduction to qualitative research
Baird, A. (1999) · Practice Nursing · doi:10.12968/pnur.1999.10.8.16 · Cited by 983
Osei-Kyei, R., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.008 · Cited by 803
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry
Gallaher, M. P., O'Connor, A. C., Dettbarn, Jr., & Gilday, L. T. (2004) · doi:10.6028/nist.gcr.04-867 · Cited by 663
Yeheyis, M., Hewage, K., Alam, M. S., Eskicioglu, C., & Sadiq, R. (2013) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-012-0481-6 · Cited by 640
Waste management models and their application to sustainable waste management
Morrissey, A. J., & Browne, J. (2004) · Waste Management · doi:10.1016/j.wasman.2003.09.005 · Cited by 637
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
Architects’ perspectives on construction waste reduction by design
Osmani, M., Glass, J., & Price, A. D. F. (2008) · Waste Management · doi:10.1016/j.wasman.2007.05.011 · Cited by 496
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Value proposition on interoperability of BIM and collaborative working environments
Grilo, A., & Jardim-Goncalves, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.003 · Cited by 450
What life-cycle assessment does and does not do in assessments of waste management
Ekvall, T., Assefa, G., Björklund, A., Eriksson, O., & Finnveden, G. (2007) · Waste Management · doi:10.1016/j.wasman.2007.02.015 · Cited by 415
A BIM-based system for demolition and renovation waste estimation and planning
Cheng, J. C. P., & Ma, L. Y. H. (2013) · Waste Management · doi:10.1016/j.wasman.2013.01.001 · Cited by 402
Mixed Research as a Tool for Developing Quantitative Instruments
Onwuegbuzie, A. J., Bustamante, R. M., & Nelson, J. A. (2010) · Journal of Mixed Methods Research · doi:10.1177/1558689809355805 · Cited by 366
A Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
Sacks, R., Radosavljevic, M., & Barak, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.02.010 · Cited by 345
A model for quantifying construction waste in projects according to the European waste list
Llatas, C. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.023 · Cited by 326
A theory of waste behaviour in the construction industry
Teo, M. M. M., & Loosemore, M. (2001) · Construction Management and Economics · doi:10.1080/01446190110067037 · Cited by 310
Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong
Jaillon, L., & Poon, C. S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.09.006 · Cited by 305
Reducing building waste at construction sites in Hong Kong
Poon, C. S., Yu, A. T. W., & Jaillon, L. (2004) · Construction Management and Economics · doi:10.1080/0144619042000202816 · Cited by 298
Building waste assessment score: design-based tool
Ekanayake, L. L., & Ofori, G. (2004) · Building and Environment · doi:10.1016/j.buildenv.2004.01.007 · Cited by 289
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., Owolabi, H. A., & Kadiri, K. O. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.06.001 · Cited by 282
Self-citationBIM adoption and implementation for architectural practices
Arayıcı, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2011) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630801111118377 · Cited by 279
Design Quality Indicator as a tool for thinking
Gann, D., Salter, A., & Whyte, J. (2003) · Building Research & Information · doi:10.1080/0961321032000107564 · Cited by 273
Integrating Construction Process Documentation into Building Information Modeling
Goedert, J. D., & Meadati, P. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:7(509 · Cited by 273
Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.018 · Cited by 272
Self-citationModel interoperability in building information modelling
Steel, J., Drogemuller, R., & Toth, B. (2012) · Software & Systems Modeling · doi:10.1007/s10270-010-0178-4 · Cited by 230
Minimizing waste on construction project sites
FANIRAN, O. O., & CABAN, G. (1998) · Engineering, Construction and Architectural Management · doi:10.1108/eb021073 · Cited by 220
Wang, J., Li, Z., & Tam, V. W. Y. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.11.003 · Cited by 218
Management of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218
Projection of Construction and Demolition Waste in Norway
Bergsdal, H., Bohne, R. A., & Brattebø, H. (2007) · Journal of Industrial Ecology · doi:10.1162/jiec.2007.1149 · Cited by 197
Jun, L., Qiuzhen, W., & Qingguo, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.11.002 · Cited by 184
Big data architecture for construction waste analytics (CWA): A conceptual framework
Bilal, M., Oyedele, L. O., Akinade, O. O., Ajayi, S. O., Alaka, H. A., Owolabi, H. A., Qadir, J., Pasha, M., & Bello, S. A. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2016.03.002 · Cited by 181
Self-citationNew Technologies and the Modernization of Local Government: an Analysis of Biases and Constraints
Pratchett, L. (1999) · Public Administration · doi:10.1111/1467-9299.00177 · Cited by 178
Estimating construction and demolition debris generation using a materials flow analysis approach
Cochran, K. M., & Townsend, T. G. (2010) · Waste Management · doi:10.1016/j.wasman.2010.04.008 · Cited by 175
Arayıcı, Y., Egbu, C., & Coates, P. M. (2012) · University of Salford Institutional Repository (University of Salford) · Cited by 173
Reducing waste to landfill: A need for cultural change in the UK construction industry
Ajayi, S. O., Oyedele, L. O., Akinade, O. O., Bilal, M., Owolabi, H. A., Alaka, H. A., & Kadiri, K. O. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2015.12.007 · Cited by 170
Self-citationAndi, & Minato, T. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00083-2 · Cited by 168
The Role of SETAC in the Development of LCA
Klöpffer, W. (2006) · The International Journal of Life Cycle Assessment · doi:10.1065/lca2006.04.019 · Cited by 162
Ajayi, S. O., Oyedele, L. O., Ceranic, B., Gallanagh, M., & Kadiri, K. O. (2015) · International Journal of Sustainable Building Technology and Urban Development · doi:10.1080/2093761x.2015.1006708 · Cited by 156
Self-citationOyedele, L. O., Ajayi, S. O., & Kadiri, K. O. (2014) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2014.09.011 · Cited by 152
Self-citationTowards improved construction waste minimisation: a need for improved supply chain integration?
Dainty, A., & Brooke, R. J. (2004) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630800410533285 · Cited by 149
Construction Waste Minimization in the UK: Current Pressures for Change and Approaches
Osmani, M. (2012) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2012.03.158 · Cited by 145
Li, H., Chen, Z., Liang, Y. Q., & Kong, S. C. W. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.08.007 · Cited by 142
Reducing construction waste: A study of urban infrastructure projects
de Magalhães, R. F., Danilevicz, Â. D. M. F., & Saurin, T. A. (2017) · Waste Management · doi:10.1016/j.wasman.2017.05.025 · Cited by 139
Kern, A. P., Morales, M. F. D., Kulakowski, M. P., & Gomes, L. P. (2015) · Waste Management · doi:10.1016/j.wasman.2015.01.043 · Cited by 135
A web-based Decision Support System for the optimal management of construction and demolition waste
Banias, G., Achillas, C., Vlachokostas, C., MOUSSIOPOULOS, N., & Papaioannou, I. (2011) · Waste Management · doi:10.1016/j.wasman.2011.07.018 · Cited by 130
Poon, C. S. (2007) · Waste Management · doi:10.1016/j.wasman.2007.08.013 · Cited by 118
CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION
Ekanayake, L. L., & Ofori, G. (2000) · Cited by 112
Towards cloud Augmented Reality for construction application by BIM and SNS integration
Jiao, Y., Zhang, S., Li, Y., Wang, Y., & Yang, B. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.09.018 · Cited by 107
Treloar, G. J., Gupta, H., Love, P. E. D., & Nguyen, B. K. (2003) · Management of Environmental Quality An International Journal · doi:10.1108/14777830310460432 · Cited by 105
Hu, Z., Zhang, X., Wang, H.-W., & Kassem, M. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.02.001 · Cited by 104
Analysis of architects' demotivating factors in design firms
Oyedele, L. O. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.11.009 · Cited by 93
Self-citationBilal, M., Oyedele, L. O., Qadir, J., Munir, K., Akinadé, O. O., Ajayi, S. O., Alaka, H., & Owolabi, H. A. (2015) · International Journal of Sustainable Building Technology and Urban Development · doi:10.1080/2093761x.2015.1116415 · Cited by 92
Self-citationThe potential use of BIM to aid construction waste minimalisation
Liu, Z., Osmani, M., Demian, P., & Baldwin, A. (2011) · Loughborough University Institutional Repository (Loughborough University) · Cited by 90
Web-based construction waste estimation system for building construction projects
Li, Y., & Zhang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.002 · Cited by 78
Reducing waste to landfill in the UK: identifying impediments and critical solutions
Oyedele, L. O., Regan, M., von Meding, J. K., Ahmed, A. A., Ebohon, O. J., & Elnokaly, A. (2013) · World Journal of Science Technology and Sustainable Development · doi:10.1108/20425941311323136 · Cited by 78
Self-citationWaste minimisation in practice
McGrath, C. (2001) · Resources Conservation and Recycling · doi:10.1016/s0921-3449(01)00063-5 · Cited by 63
Competency-based measures for designing out construction waste: task and contextual attributes
Ajayi, S. O., Oyedele, L. O., Kadiri, K. O., Akinadé, O. O., Bilal, M., Owolabi, H. A., & Alaka, H. (2016) · Engineering Construction & Architectural Management · doi:10.1108/ecam-06-2015-0095 · Cited by 52
Self-citationDesign waste mapping: a project life cycle approach
Osmani, M. (2013) · Proceedings of the Institution of Civil Engineers - Waste and Resource Management · doi:10.1680/warm.13.00013 · Cited by 51
Construction and demolition waste
de Brito, J., Agrela, F., & Silva, R. V. (2018) · Elsevier eBooks · doi:10.1016/b978-0-08-102480-5.00001-4 · Cited by 51
Quantification of construction waste amount
Jalali, S. (2007) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 23
Webfill before landfill: an e-commerce model for waste exchange in Hong Kong
Chen, Z., Li, H., & Wong, C. T. C. (2003) · Construction Innovation · doi:10.1108/14714170310814837 · Cited by 23
Factors that Contribute to the Generation of Construction Waste at Sites
Mokhtar, S. N., Mahmood, N. Z., Hassan, C. R. C., Masudi, A. F., & Sulaiman, N. M. N. (2010) · Advanced materials research · doi:10.4028/www.scientific.net/amr.163-167.4501 · Cited by 22
Design for Deconstruction: an appraisal
Tingley, D. D. (2013) · White Rose eTheses Online (University of Leeds, The University of Sheffield, University of York) · Cited by 19
Contruction waste generation across construction project life-cycle
Kozlovská, M., & Spišáková, M. (2013) · Organization Technology and Management in Construction An International Journal · doi:10.5592/otmcj.2013.1.5 · Cited by 18
Cited by
Jin, R., Yuan, H., & Chen, Q. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.09.029 · Cited by 380
Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2021) · Materials · doi:10.3390/ma15010076 · Cited by 357
Exploring factors influencing construction waste reduction: A structural equation modeling approach
Liu, J., Yi, Y., & Wang, X. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.123185 · Cited by 272
The classification of construction waste material using a deep convolutional neural network
Davis, P., Aziz, F., Newaz, M. T., Sher, W., & Simon, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103481 · Cited by 204
Metadata
- Authors
- Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2018-04
- Volume
- 180
- Pages
- 375-385
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2789055628
- Cited by
- 260
- References
- 78
- FWCI
- 17.41
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.