CoChat

The effects of Six Sigma on corporate performance: An empirical investigation

Shafer, Scott M., Moeller, Sara B. · 2012 · Journal of Operations Management
Cited by 187

The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.

Abstract

The purpose of this study is to investigate the impact of adopting Six Sigma on corporate performance. Although there is a fairly large and growing body of anecdotal evidence associated with the benefits of implementing Six Sigma, there is very little systematic and rigorous research investigating these benefits. This research extends previous research in several important ways including utilizing a sample of 84 Six Sigma firms that represent a wide variety of industries and firm characteristics, utilizing rigorously constructed control groups to ensure the validity of our comparisons and conclusions, and investigating the impact of adopting Six Sigma on corporate performance over a ten year period. To carry out this investigation, the event study methodology is employed. The ten year period consists of three years prior to Six Sigma implementation, the event year corresponding to the year Six Sigma is adopted, and six years post Six Sigma implementation. To assess the impact of adopting Six Sigma on corporate performance we utilize commonly used measures including Operating Income/Total Assets (OI/A), Operating Income/Sales (OI/S), Operating Income/Number of Employees (OI/E), Sales/Assets (S/A), and Sales/Number of Employees (S/E). The sample Six Sigma firms are compared to different benchmarks including the overall industry performance and to the performance of carefully selected portfolios of control firms. The results of the study indicate that adopting Six Sigma positively impacts organizational performance primarily through the efficiency with which employees are deployed. More specifically, enhanced employee productivity results were observed in both static analyses that assessed the performance of the sample Six Sigma firms relative to their control groups at discrete points in time and dynamic analyses of the Six Sigma firms’ rate of improvement relative to the rate of improvement of their control groups. Benefits in terms of improved asset efficiency were not observed. Finally, there was no evidence that Six Sigma negatively impacts corporate performance.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.jom.2012.10.002

Cites

29 of 29 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Cited by

See all 187

Metadata

Authors
Shafer, S. M., & Moeller, S. B.
Venue
Journal of Operations Management
Publisher
Wiley
Published
2012-10-29
Volume
30
Issue
7-8
Pages
521-532
ISSN
  • 0272-6963 (ISSN-L)
  • 1873-1317
OpenAlex
W2014365783
Cited by
187
References
29
FWCI
22.39
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.