A model for estimating construction waste generation index for building project in China
The DOI matches its Crossref record; 20 of the 20 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578
Material Waste in Building Industry: Main Causes and Prevention
Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:4(316 · Cited by 434
A Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
Estimation of construction waste generation and management in Thailand
Kofoworola, O. F., & Gheewala, S. H. (2009) · Waste Management · doi:10.1016/j.wasman.2008.07.004 · Cited by 346
A model for quantifying construction waste in projects according to the European waste list
Llatas, C. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.023 · Cited by 326
Reducing building waste at construction sites in Hong Kong
Poon, C. S., Yu, A. T. W., & Jaillon, L. (2004) · Construction Management and Economics · doi:10.1080/0144619042000202816 · Cited by 298
Lu, W., Yuan, H., Li, J., Hao, J. J. L., Mi, X., & Ding, Z. (2011) · Waste Management · doi:10.1016/j.wasman.2010.12.004 · Cited by 266
Self-citationOn the effectiveness in implementing a waste-management-plan method in construction
Tam, V. W. Y. (2008) · Waste Management · doi:10.1016/j.wasman.2007.04.007 · Cited by 263
Management of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218
Characterization of building-related construction and demolition debris in the United States
Response, E., & Associates, F. (1998) · Medical Entomology and Zoology · Cited by 202
Cited by
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
Status quo and future directions of construction and demolition waste research: A critical review
Wu, H., Zuo, J., Zillante, G., Wang, J., & Yuan, H. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118163 · Cited by 358
Self-citationEsa, M. R., Halog, A., & Rigamonti, L. (2017) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-016-0516-x · Cited by 275
Estimation of building-related construction and demolition waste in Shanghai
Ding, T., & Xiao, J. (2014) · Waste Management · doi:10.1016/j.wasman.2014.07.029 · Cited by 237
Yuan, H. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.04.137 · Cited by 225
Guerra, B. C., Leite, F., & Faust, K. M. (2020) · Waste Management · doi:10.1016/j.wasman.2020.07.035 · Cited by 177
Akinade, O. O., & Oyedele, L. O. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.04.232 · Cited by 173
Nguyen, X. C., Nguyen, T. T. H., La, D. D., Kumar, G., Rene, E. R., Nguyen, D. D., Chang, S. W., Chung, W. J., Nguyen, X. H., & Nguyen, V. K. (2021) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2020.105381 · Cited by 164
Lu, W., Webster, C., Peng, Y., Chen, X., & Zhang, X. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1166548 · Cited by 162
“For waste generation parameters, we use the waste generation rate for new construction reported by Li et al. (2013), which is 40 kg/ m2.”
BackgroundMethodInfluentialConstruction and demolition waste research: A bibliometric analysis
Wu, H., Zuo, J., Zillante, G., Wang, J., & Yuan, H. (2019) · Architectural Science Review · doi:10.1080/00038628.2018.1564646 · Cited by 115
“…particular region (Bergsdal, Bohne, and Brattebo 2007; Wu et al. 2016a ; Zheng et al. 2017), investigate the waste generation rate (Lu et al. 2011; Li et al. 2013; Malia et al. 2013; Lu et al. 2017), and develop C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2)…”
BackgroundSelf-citationHao, J., Chen, Z., Zhang, Z., & Loehlein, G. (2021) · Environmental Science and Pollution Research · doi:10.1007/s11356-020-09026-2 · Cited by 69
Factors influencing temporary wood waste generation in high-rise building construction
Kern, A. P., Amor, L. V., Angulo, S. C., & Montelongo, A. (2018) · Waste Management · doi:10.1016/j.wasman.2018.05.057 · Cited by 52
Low, J. K., Hernandez, G., & Berry, T.-A. (2024) · Frontiers in Sustainability · doi:10.3389/frsus.2024.1455480 · Cited by 7
Zhu, S., & Feng, H. (2025) · IOP Conference Series: Earth and Environmental Science · doi:10.1088/1755-1315/1554/1/012002 · Cited by 1
“Studies indicate that timber accounts for 38% of CDW in New Zealand (6), around 40% in USA (7), 30%- 50% in Canada (8), 10%-25% in European Union countries (9,10), 4-5% in south Africa (11) and 8%-20% in China (12,13).”
Metadata
- Authors
- Li, J., Ding, Z., Mi, X., & Wang, J.
- Venue
- Resources, Conservation and Recycling
- Publisher
- Elsevier BV
- Published
- 2013-05
- Volume
- 74
- Pages
- 20-26
- ISSN
- 0921-3449 (ISSN-L)
- OpenAlex
- W1992914124
- Cited by
- 171
- References
- 20
- FWCI
- 17.33
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.