CoChat

Life cycle assessment of building demolition waste based on building information modeling

Wang, Jingjing, Wei, Jiajia, Liu, Zhansheng, Huang, Chun, Du, Xiuli · 2022 · Resources, Conservation and Recycling
Cited by 70

The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.resconrec.2021.106095

Cites

7 of 7 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Research works printed but not linked: 34

  1. Ajayi, 2016, Reducing waste to landfill: A need for cultural change in the UK construction industry, Journal of Building Engineering, 5, 185, 10.1016/j.jobe.2015.12.007 · DOI · Paper page
  2. Akbarnezhad, 2014, Economic and environmental assessment of deconstruction strategies using building information modeling, Automation in construction, 37, 131, 10.1016/j.autcon.2013.10.017 · DOI · Paper page
  3. Akinade, 2017, BIM-based deconstruction tool: Towards essential functionalities, International Journal of Sustainable Built Environment, 6, 260, 10.1016/j.ijsbe.2017.01.002 · DOI · Paper page
  4. Andrade, 2018, Evaluation of mechanical properties and carbonation of mortars produced with construction and demolition waste, Construction and Building Materials, 161, 70, 10.1016/j.conbuildmat.2017.11.089 · DOI
  5. Carvalho Machado, 2018, Analysis of guidelines and identification of characteristics influencing the deconstruction potential of buildings, Sustainability, 10, 2604, 10.3390/su10082604 · DOI
  6. Chen, 2010, LCA allocation procedure used as an incitative method for waste recycling: An application to mineral additions in concrete, Resources, Conservation and Recycling, 54, 1231, 10.1016/j.resconrec.2010.04.001 · DOI · Paper page
  7. Cheng, 2020, A BIM-LCA approach for estimating the greenhouse gas emissions of large-scale public buildings: a case study, Sustainability, 12, 685, 10.3390/su12020685 · DOI
  8. Cheng, 2013, A BIM-based system for demolition and renovation waste estimation and planning, Waste Management, 33, 1539, 10.1016/j.wasman.2013.01.001 · DOI · Paper page
  9. Doan, 2016, Modeling construction and demolition waste recycling program in Bangkok: Benefit and cost analysis, Journal of Construction Engineering and Management, 142, 10.1061/(ASCE)CO.1943-7862.0001188 · DOI
  10. Eleftheriadis, 2017, Life cycle energy efficiency in building structures: a review of current developments and future outlooks based on BIM capabilities, Renewable and Sustainable Energy Reviews, 67, 811, 10.1016/j.rser.2016.09.028 · DOI · Paper page
  11. Guerra, 2019, BIM-based automated construction waste estimation algorithms: The case of concrete and drywall waste streams, Waste Management, 87, 825, 10.1016/j.wasman.2019.03.010 · DOI · Paper page
  12. Guerra, 2020, 4D-BIM to enhance construction waste reuse and recycle planning: Case studies on concrete and drywall waste streams, Waste Management, 116, 79, 10.1016/j.wasman.2020.07.035 · DOI · Paper page
  13. Iacovidou, 2018, The use of smart technologies in enabling construction components reuse: A viable method or a problem creating solution?, Journal of environmental management, 216, 214, 10.1016/j.jenvman.2017.04.093 · DOI · Paper page
  14. Kabirifar, 2020, Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review, Journal of Cleaner Production, 263, 10.1016/j.jclepro.2020.121265 · DOI · Paper page
  15. Kim, 2017, An estimation framework for building information modeling (BIM)-based demolition waste by type, Waste Management & Research, 35, 1285, 10.1177/0734242X17736381 · DOI
  16. Marzouk, 2021, Design for deconstruction using integrated lean principles and BIM approach, Sustainability, 13, 7856, 10.3390/su13147856 · DOI
  17. Marzouk, 2019, Lean deconstruction approach for buildings demolition processes using BIM, Lean Construction Journal, 147
  18. Nikmehr, 2021, BIM-Based Tools for Managing Construction and Demolition Waste (CDW): A Scoping Review, Sustainability, 13, 8427, 10.3390/su13158427 · DOI
  19. Nizam, 2018, A BIM based tool for assessing embodied energy for buildings, Energy and Building, 170, 1, 10.1016/j.enbuild.2018.03.067 · DOI
  20. Obi, 2021, BIM for Deconstruction: An Interpretive Structural Model of Factors Influencing Implementation, Buildings, 11, 227, 10.3390/buildings11060227 · DOI
  21. Rašković, 2020, Clean construction and demolition waste material cycles through optimised pre-demolition waste audit documentation: A review on building material assessment tools, Waste Management & Research, 38, 923, 10.1177/0734242X20936763 · DOI
  22. Santos, 2019, Integration of LCA and LCC analysis within a BIM-based environment, Automation in Construction, 103, 127, 10.1016/j.autcon.2019.02.011 · DOI
  23. Shi, 2021, BIM-based information system for econo-enviro-friendly end-of-life disposal of construction and demolition waste, Automation in Construction, 125, 10.1016/j.autcon.2021.103611 · DOI
  24. Soust-Verdaguer, 2017, Critical review of bim-based LCA method to buildings, Energy and Buildings, 136, 110, 10.1016/j.enbuild.2016.12.009 · DOI · Paper page
  25. Su, 2021, A building information modeling-based tool for estimating building demolition waste and evaluating its environmental impacts, Waste Management, 134, 159, 10.1016/j.wasman.2021.07.025 · DOI
  26. Su, 2020, BIM-DLCA: An integrated dynamic environmental impact assessment model for buildings, Building and Environment, 183, 10.1016/j.buildenv.2020.107218 · DOI
  27. Van den Berg, 2021, BIM uses for deconstruction: An activity-theoretical perspective on reorganising end-of-life practices, Construction Management and Economics, 39, 323, 10.1080/01446193.2021.1876894 · DOI · Paper page
  28. Wang, 2018, Environmental impacts of short building lifespans in China considering time value, Journal of Cleaner Production, 203, 696, 10.1016/j.jclepro.2018.08.314 · DOI
  29. Wang, 2004, A systems analysis tool for construction and demolition wastes management, Waste management, 24, 989, 10.1016/j.wasman.2004.07.010 · DOI
  30. Won, 2016, Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea, Waste Management, 49, 170, 10.1016/j.wasman.2015.12.026 · DOI · Paper page
  31. Won, 2017, Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization, Automation in Construction, 79, 3, 10.1016/j.autcon.2017.02.002 · DOI · Paper page
  32. Wong, 2015, Enhancing environmental sustainability over building life cycles through green BIM: A review, Automation in construction, 57, 156, 10.1016/j.autcon.2015.06.003 · DOI · Paper page
  33. Wu, 2019, Smart Management of Construction and Demolition Waste: Review and Analysis, 1871
  34. Xu, 2019, A BIM-Based construction and demolition waste information management system for greenhouse gas quantification and reduction, Journal of Cleaner Production, 229, 308, 10.1016/j.jclepro.2019.04.158 · DOI

Cited by

See all 70

Metadata

Authors
Wang, J., Wei, J., Liu, Z., Huang, C., & Du, X.
Venue
Resources, Conservation and Recycling
Publisher
Elsevier BV
Published
2022-03
Volume
178
Pages
106095
ISSN
0921-3449
Cited by
70
References
7
Language
en
Funders
  • Natural Science Foundation of Beijing Municipality (9204021)
  • Beijing University of Technology

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.