Using systems dynamics to better understand change and rework in construction project management systems
The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mixing Qualitative and Quantitative Methods: Triangulation in Action.
Jick, T. D. (1979) · Administrative Science Quarterly · doi:10.2307/2392366 · Cited by 7,103
Risk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755
Quantifying the causes and costs of rework in construction
Love, P. E. D., & Li, H. (2000) · Construction Management and Economics · doi:10.1080/01446190050024897 · Cited by 486
Self-citationStudying the client's role in construction management
Cherns, A. B., & Bryant, D. T. (1984) · Construction Management and Economics · doi:10.1080/01446198400000016 · Cited by 323
Selecting a suitable procurement method for a building project
Love, P. E. D., Skitmore, M., & Earl, G. (1998) · Construction Management and Economics · doi:10.1080/014461998372501 · Cited by 281
Self-citationThe role of system dynamics in project management
Rodrigues, A., & Bowers, J. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00075-5 · Cited by 240
Determining the causal structure of rework influences in construction
LOVE, P. E. D., MANDAL, P., & LI, H. (1999) · Construction Management and Economics · doi:10.1080/014461999371420 · Cited by 211
Self-citationConcurrent engineering: a strategy for procuring construction projects
Love, P. E. D., Gunasekaran, A., & Li, H. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00066-5 · Cited by 185
Self-citationRework: a symptom of a dysfunctional supply-chain
Love, P. E. D., Li, H., & Mandal, P. (1999) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(98)00017-3 · Cited by 134
Self-citationVicious circles of parallelism
Williams, T., Eden, C., Ackermann, F., & Tait, A. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00034-n · Cited by 69
Project management: Dynamics and performance
Sidwell, A. (1990) · Construction Management and Economics · doi:10.1080/01446199000000014 · Cited by 31
Cited by
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
Identifying the critical factors for green construction – An empirical study in China
Shi, Q., Zuo, J., Huang, R., Huang, J., & Pullen, S. (2013) · Habitat International · doi:10.1016/j.habitatint.2013.01.003 · Cited by 328
Factors Influencing Construction Waste Generation in Building Construction: Thailand’s Perspective
Luangcharoenrat, C., Intrachooto, S., Peansupap, V., & Sutthinarakorn, W. (2019) · Sustainability · doi:10.3390/su11133638 · Cited by 243
Han, S., Saba, F., Lee, S., Mohamed, Y., & Peña-Mora, F. (2014) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.10.007 · Cited by 182
“The complex relationship between rework and schedule nd cost performances was also studied to identify effective strateies for the prevention of rework (Love et al., 1995, 2002).”
BackgroundAnalyzing Causes for Reworks in Construction Projects in China
Ye, G., Jin, Z., Xia, B., & Skitmore, M. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000347 · Cited by 178
Metadata
- Authors
- Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2002-08
- Volume
- 20
- Issue
- 6
- Pages
- 425-436
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2074707667
- Cited by
- 316
- References
- 11
- FWCI
- 5.96
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.