Concurrent engineering: a strategy for procuring construction projects
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
External Control of Organizations: Resource Dependence Perspective
(2011) · Organizational Behavior 6 · doi:10.4324/9781315701967-54 · Cited by 14,181
Organization and management : a systems and contingency approach
Kast, F. E., & Rosenzweig, J. E. (1979) · Andalas University Repository (Andalas University) · Cited by 444
Cited by
Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Love, P. E. D. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:1(18 · Cited by 463
Self-citationLove, P. E. D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00039-4 · Cited by 316
Self-citationInnovation in construction: a sociology of technology approach
Harty, C. (2005) · Building Research & Information · doi:10.1080/09613210500288605 · Cited by 297
Establishment of Critical Success Factors for Construction Partnering
Cheng, E. W. L., Li, H., & Love, P. E. D. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:2(84 · Cited by 233
Self-citationImpact of Team Integration and Group Cohesion on Project Delivery Performance
Franz, B., Leicht, R., Molenaar, K., & Messner, J. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001219 · Cited by 185
Analyzing Causes for Reworks in Construction Projects in China
Ye, G., Jin, Z., Xia, B., & Skitmore, M. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000347 · Cited by 178
Critical success factors for construction partnering in Taiwan
Chen, W. T., & Chen, T.-T. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.003 · Cited by 170
Conceptual Model of Partnering and Alliancing
Anvuur, A. M., & Kumaraswamy, M. M. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:3(225 · Cited by 163
A model for supporting inter-organizational relations in the supply chain
Love, P. E. D., Irani, Z., Cheng, E., & LI, H. (2002) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.2002.00225.x · Cited by 158
Self-citationSurvey of digital technologies in procurement of construction projects
Ibem, E. O., & Laryea, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.07.003 · Cited by 121
Lingard, H., Pirzadeh, P., Blismas, N., Wakefield, R., & Kleiner, B. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.911931 · Cited by 47
Metadata
- Authors
- Love, P. E. D., Gunasekaran, A., & Li, H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1998-12
- Volume
- 16
- Issue
- 6
- Pages
- 375-383
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2031657468
- Cited by
- 185
- References
- 2
- FWCI
- 7.17
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.