Forecasting and Stock Control for Intermittent Demands
The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Abstract
Exponential smoothing is frequently used for the forecasts in stock control systems. The analysis given shows that intermittent demands almost always produce inappropriate stock levels. Demand for constant quantities at fixed intervals may generate stock levels of up to double the quantity really needed. A method of overcoming these difficulties is described, using separate estimates of the size of demand, and of the demand frequency. The rules for setting the safety stock levels have also to be adjusted before consistent protection can be obtained against being out of stock.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Time Series Analysis: Forecasting and Control
Geurts, M., Box, G. E. P., & Jenkins, G. M. (1977) · Journal of Marketing Research · doi:10.2307/3150485 · Cited by 19,186
Forecasting Sales by Exponentially Weighted Moving Averages
Winters, P. R. (1960) · Management Science · doi:10.1287/mnsc.6.3.324 · Cited by 2,108
Smoothing, Forecasting and Prediction of Discrete Time Series.
Parzen, E., & Brown, R. G. (1964) · Journal of the American Statistical Association · doi:10.2307/2283122 · Cited by 968
Statistical Forecasting for Inventory Control.
Davies, O. L., & Brown, R. G. (1960) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2342487 · Cited by 831
Exponential Smoothing with an Adaptive Response Rate
Trigg, D. W., & Leach, A. G. (1967) · Journal of the Operational Research Society · doi:10.1057/jors.1967.5 · Cited by 334
Harrison, P. J. (1965) · Journal of the Royal Statistical Society Series C (Applied Statistics) · doi:10.2307/2985338 · Cited by 73
Cited by
Automatic Time Series Forecasting: The forecast Package for R
Hyndman, R. J., & Khandakar, Y. (2008) · Journal of Statistical Software · doi:10.18637/jss.v027.i03 · Cited by 3,511
DeepAR: Probabilistic forecasting with autoregressive recurrent networks
Salinas, D., Flunkert, V., Gasthaus, J., & Januschowski, T. (2020) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2019.07.001 · Cited by 2,661
25 years of time series forecasting
De Gooijer, J. G., & Hyndman, R. J. (2006) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2006.01.001 · Cited by 1,587
Exponential smoothing: The state of the art
Gardner, E. S. (1985) · Journal of Forecasting · doi:10.1002/for.3980040103 · Cited by 1,458
A new metric of absolute percentage error for intermittent demand forecasts
Kim, S., & Kim, H. (2016) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2015.12.003 · Cited by 1,146
Principles of Forecasting: A Handbook for Researchers and Practitioners
(2001) · International Series in Operations Research & Management Science · doi:10.1007/978-0-306-47630-3 · Cited by 1,041
Exponential smoothing: The state of the art—Part II
Gardner, E. S. (2006) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2006.03.005 · Cited by 948
Forecasting: theory and practice
Petropoulos, F., Apiletti, D., Assimakopoulos, V., Babai, M. Z., Barrow, D. K., Ben Taieb, S., Bergmeir, C., Bessa, R. J., Bijak, J., Boylan, J. E., et al. (2022) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2021.11.001 · Cited by 921
M5 accuracy competition: Results, findings, and conclusions
Makridakis, S., Spiliotis, E., & Assimakopoulos, V. (2022) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2021.11.013 · Cited by 554
The accuracy of intermittent demand estimates
Syntetos, A. A., & Boylan, J. E. (2005) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2004.10.001 · Cited by 489
On the categorization of demand patterns
Syntetos, A. A., Boylan, J. E., & Croston, J. D. (2005) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601841 · Cited by 425
Self-citationA new approach to forecasting intermittent demand for service parts inventories
Willemain, T. R., Smart, C. N., & Schwarz, H. F. (2004) · International Journal of Forecasting · doi:10.1016/s0169-2070(03)00013-x · Cited by 394
Deep Learning for Time Series Forecasting: Tutorial and Literature Survey
Benidis, K., Rangapuram, S. S., Flunkert, V., Wang, Y., Maddix, D., Turkmen, C., Gasthaus, J., Bohlke-Schneider, M., Salinas, D., Stella, L., et al. (2023) · ACM Computing Surveys · doi:10.1145/3533382 · Cited by 382
“Specifically, they use RNNs to modulate both discrete time and continuous time renewal processes, using the simple analogy that RNNs can replace exponential smoothing in [41].”
BackgroundMethodOn the bias of intermittent demand estimates
Syntetos, A. A., & Boylan, J. E. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00143-2 · Cited by 362
Retail forecasting: Research and practice
Fildes, R., Ma, S., & Kolassa, S. (2022) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2019.06.004 · Cited by 346
Supply chain forecasting: Theory, practice, their gap and the future
Syntetos, A. A., Babai, Z., Boylan, J. E., Kolassa, S., & Nikolopoulos, K. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.11.010 · Cited by 328
Forecasting and operational research: a review
Fildes, R., Nikolopoulos, K., Crone, S. F., & Syntetos, A. A. (2008) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2602597 · Cited by 287
“A particular operational problem of method selection first laid out in ORQ by Croston (1972) that faces both the retailer and the spare parts supplier is one of intermittent demand—that is, when demand is spasmodic with many periods experiencing zero demand (Section 2.1.2).”
MethodInfluentialIntermittent demand: Linking forecasting to inventory obsolescence
Teunter, R. H., Syntetos, A. A., & Zied Babai, M. (2011) · European Journal of Operational Research · doi:10.1016/j.ejor.2011.05.018 · Cited by 252
Ghobbar, A. A., & Friend, C. H. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00125-9 · Cited by 235
“The single exponential smoothing and the Croston methods are the most frequently used methods for forecasting low and intermittent demands [5,7].”
BackgroundMethodInfluential‘Horses for Courses’ in demand forecasting
Petropoulos, F., Makridakis, S., Assimakopoulos, V., & Nikolopoulos, K. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.02.036 · Cited by 201
“Croston (1972), suggested the decomposition of an intermittent demand series in the non-zero observed demands and the intervals (in time periods) between successive non-zero demands.”
BackgroundMethodKilimci, Z. H., Akyuz, A. O., Uysal, M., Akyokus, S., Uysal, M. O., Atak Bulbul, B., & Ekmis, M. A. (2019) · Complexity · doi:10.1155/2019/9067367 · Cited by 196
“One of the influential methods about intermittent demand forecasting is proposed by Croston [9].”
BackgroundMethodSgarbossa, F., Peron, M., Lolli, F., & Balugani, E. (2021) · International Journal of Production Economics · doi:10.1016/j.ijpe.2020.107993 · Cited by 110
Unconstraining methods for revenue management systems under small demand
Kourentzes, N., Li, D., & Strauss, A. K. (2019) · Journal of Revenue and Pricing Management · doi:10.1057/s41272-017-0117-x · Cited by 9
“However Kourentzes (2014) provides evidence that any difference between the original Croston’s and SBA are minimal when appropriately optimized, as the bias is very strong only for relatively large parameters. Teunter et al. (2011) criticize Croston’s method for updating its estimates only after a positive demand even…”
BackgroundMethodInfluential
Metadata
- Authors
- Croston, J. D.
- Venue
- Journal of the Operational Research Society
- Publisher
- Informa UK Limited
- Published
- 1972-09
- Volume
- 23
- Issue
- 3
- Pages
- 289-303
- ISSN
- 0160-5682 (ISSN-L)
- 1476-9360
- OpenAlex
- W1989787309
- Cited by
- 753
- References
- 6
- FWCI
- 1.53
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.