Gearing Six Sigma into UK manufacturing SMEs: results from a pilot study
The DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
Abstract
Approaches to business improvement have evolved and grown since the early 1900s and today the process focused, statistically driven Six Sigma methodology has been widely used by companies such as GE, Motorola, Honeywell, Bombardier, ABB, Sony, DuPont, American Express, Ford and many other companies in improving the business performance and optimizing the bottom-line benefits. Although Six Sigma business management strategy has been exploited by many world class organizations as mentioned above, there is still less documented evidence of its implementation in small and medium-sized enterprises (SMEs). This paper reports the key findings of a Six Sigma pilot survey in UK manufacturing SMEs. The results of the study are based primarily on descriptive statistics. The results of the study show that many of the SMEs are not aware of Six Sigma and do not have the resources to implement Six Sigma projects. It was also found that Lean Sigma was not generally popular among SMEs. Management involvement and participation, linking Six Sigma to customers and to business strategy are the most critical factors for the successful deployment of Six Sigma in SMEs.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Chief executives define their own data needs.
Rockart, J. F. (1979) · PubMed · Cited by 2,802
Identification of the Critical Factors of TQM*
Black, S. A., & Porter, L. J. (1996) · Decision Sciences · doi:10.1111/j.1540-5915.1996.tb00841.x · Cited by 1,021 · cited 1×
“The CSFs used in this pilot study were derived from existing literature of TQM and Six Sigma (Badri et al, 1995; Black and Porter, 1996; Yusof and Aspinwall, 1999; Snee, 2000; Breyfogle, 2001; Antony and Banuelas, 2002; Rungasamy et al, 2002; Adams et al, 2003; Oakland, 2003; Antony, 2004).”
MethodThe Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance
Pande, P. S., Cavanagh, R. R., & Neuman, R. P. (2000) · Cited by 995
Six Sigma: a goal‐theoretic perspective
Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00087-6 · Cited by 874 · cited 2×
“A defect opportunity is a process failure that is critical to the customer (Linderman et al, 2003).”
BackgroundMethodImplementing Six Sigma: Smarter Solutions Using Statistical Methods
Gardner, M. M. (2000) · Technometrics · doi:10.1080/00401706.2000.10486054 · Cited by 772 · cited 1×
“General Electric (GE) CEO Jack Welch describes Six Sigma as ‘the most challenging and potentially rewarding initiative we have ever undertaken at General Electric (Breyfogle, 1999)’.”
BackgroundSix Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations
Harry, M., & Schroeder, R. (1999) · Cited by 771
Total quality management in SMEs
Ghobadian, A., & Gallear, D. N. (1996) · Omega · doi:10.1016/0305-0483(95)00055-0 · Cited by 550 · cited 2×
“Focus is on operational matters rather than planning (Lee and Oakes, 1995; Ghobadian and Gallear, 1996; Parkin and Parkin, 1996; Yusof and Aspinwall, 1999; Antony and Banuelas, 2001; Klefsjo et al, 2001; Antony and Banuelas, 2002; Antony and Fergusson, 2004; Wessel and Burcher, 2004; McAdam and…”
BackgroundThe Department of Trade and Industry
R, C. F. A. O. (2007) · Cited by 430
Successful implementation of Six Sigma: benchmarking General Electric Company
Henderson, K. M., & Evans, J. R. (2000) · Benchmarking: An International Journal · doi:10.1108/14635770010378909 · Cited by 416 · cited 2×
“(Henderson and Evans, 2000; Antony, 2004; Antony and Fergusson, 2004).”
BackgroundGhobadian, A., & Gallear, D. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710158023 · Cited by 389 · cited 2×
“On the other hand, SMEs do have some strengths such as effective and open communication channels, low resistance to change, people orientation company-wide awareness, functional integration, and employees adopting a natural responsibility for quality (Ghobadian and Gallear, 1997).”
BackgroundMethodSix Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations
Alexander, M. (2001) · Technometrics · doi:10.1198/tech.2001.s622 · Cited by 358 · cited 4×
“The questionnaires were completed by Project Champions, Black Belts, Green Belts or Yellow Belts who have first-hand knowledge and expertise with the Six Sigma programme.”
BackgroundInfluentialSmall Business Growth: Intention, Ability, and Opportunity
Morrison, A., Breen, J., & Ali, S. (2003) · Journal of Small Business Management · doi:10.1111/1540-627x.00092 · Cited by 308 · cited 2×
“SMEs contribution to world economy can be adjudged from the following (Morrison et al, 2003): small businesses in the US contribute to 99.65% of employment (Small Business Administration, 2005); small businesses add to 96.38% of non-agricultural industries in Australia (Australian Bureau of…”
BackgroundInfluentialSix-Sigma: the evolution of 100 years of business improvement methodology
Snee, R. D. (2004) · International Journal of Six Sigma and Competitive Advantage · doi:10.1504/ijssca.2004.005274 · Cited by 302 · cited 3×
“The ever changing world with new customer needs, new markets, innovation and social changes brings about a need to improve the existing processes to serve the existing customers and a need to develop new processes to serve new customer needs (Snee, 2004).”
BackgroundMethodA study of measuring the critical factors of quality management
Badri, M. A., Davis, D., & Davis, D. (1995) · International Journal of Quality & Reliability Management · doi:10.1108/02656719510080604 · Cited by 300
Six Sigma in the UK service organisations: results from a pilot survey
Antony, J. (2004) · Managerial Auditing Journal · doi:10.1108/02686900410557908 · Cited by 281 · cited 8×
“has revealed the following three CSFs in their ascending order of importance (Antony, 2004):”
BackgroundMethodResultInfluentialSelf-citationSix sigma seen as a methodology for total quality management
Klefsjö, B., Wiklund, H., & Edgeman, R. L. (2001) · Measuring Business Excellence · doi:10.1108/13683040110385809 · Cited by 248 · cited 1×
“…rather than planning (Lee and Oakes, 1995; Ghobadian and Gallear, 1996; Parkin and Parkin, 1996; Yusof and Aspinwall, 1999; Antony and Banuelas, 2001; Klefsjo et al, 2001; Antony and Banuelas, 2002; Antony and Fergusson, 2004; Wessel and Burcher, 2004; McAdam and Lafferty, 2004; Snee, 2004).”
BackgroundInformation systems strategy for small and medium sized enterprises: an organisational perspective
Levy, M., & Powell, P. (2000) · The Journal of Strategic Information Systems · doi:10.1016/s0963-8687(00)00028-7 · Cited by 244 · cited 8×
“The table was constructed by reviewing existing literature on SMEs and Quality Management practices such as TQM (Ghobadian and Gallear, 1997; Noci and Toletti, 1998; Yusof and Aspinwall, 2000; McAdam, 2000; Levy and Powell, 2000).”
MethodInfluentialSix Sigma: SPC and TQM in Manufacturing and Services
(2002) · Work Study · doi:10.1108/ws.2002.07951cae.002 · Cited by 211
A multilevel case study critique of six sigma: statistical control or strategic change?
McAdam, R., & Lafferty, B. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410532579 · Cited by 208 · cited 1×
“…rather than planning (Lee and Oakes, 1995; Ghobadian and Gallear, 1996; Parkin and Parkin, 1996; Yusof and Aspinwall, 1999; Antony and Banuelas, 2001; Klefsjo et al, 2001; Antony and Banuelas, 2002; Antony and Fergusson, 2004; Wessel and Burcher, 2004; McAdam and Lafferty, 2004; Snee, 2004).”
BackgroundSix sigma for small and medium-sized enterprises
Wessel, G., & Burcher, P. (2004) · The TQM Magazine · doi:10.1108/09544780410541918 · Cited by 164 · cited 6×
“SMEs are unclear about the advantages (due to lack of knowledge) that one system has over other (Brown and Van der Weile, 1995; Husband, 1997; Husband and Mandal, 1999; Yusof and Aspinwall, 1999; Andrews, 2004).”
BackgroundMethodInfluentialQuality models in an SME context
McAdam, R. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010306166 · Cited by 144 · cited 8×
“The table was constructed by reviewing existing literature on SMEs and Quality Management practices such as TQM (Ghobadian and Gallear, 1997; Noci and Toletti, 1998; Yusof and Aspinwall, 2000; McAdam, 2000; Levy and Powell, 2000).”
MethodInfluentialWidening the Six Sigma concept: An approach to improve organizational learning
Wiklund, H., & Wiklund, P. S. (2002) · Total Quality Management · doi:10.1080/09544120120102469 · Cited by 128 · cited 1×
“The aim of Six Sigma is to keep the distance between the process average and the nearest tolerance limit to at least six standard deviations and thus reduce variability in products and processes in order to prevent defects (Wiklund and Wiklund, 2002).”
BackgroundSix Sigma: SPC and TQM in Manufacturing and Services
(2001) · The TQM Journal · doi:10.1108/tqmm.2001.13.3.201.1 · Cited by 100
A conceptual model for quality integrated management in small and medium size enterprises
Husband, S., & Mandal, P. (1999) · International Journal of Quality & Reliability Management · doi:10.1108/02656719910286215 · Cited by 84 · cited 1×
“SMEs are unclear about the advantages (due to lack of knowledge) that one system has over other (Brown and Van der Weile, 1995; Husband, 1997; Husband and Mandal, 1999; Yusof and Aspinwall, 1999; Andrews, 2004).”
Background
Cited by
Organisational resilience: development of a conceptual framework for organisational responses
Burnard, K., & Bhamra, R. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.563827 · Cited by 704
“Following the work of Ghobadian and Gallear (1997) and Antony et al. (2008), the capabilities of both flexible and rigid responses to environmental uncertainty are recognised within SMEs, given their typical strengths and weaknesses.”
BackgroundSobaih, A. E. E., Elshaer, I., Hasanein, A. M., & Abdelaziz, A. S. (2021) · International Journal of Hospitality Management · doi:10.1016/j.ijhm.2020.102824 · Cited by 338
Building tourism organizational resilience to crises and disasters: A dynamic capabilities view
Jiang, Y., Ritchie, B. W., & Verreynne, M. (2019) · International Journal of Tourism Research · doi:10.1002/jtr.2312 · Cited by 312
Big data in lean six sigma: a review and further research directions
Gupta, S., Modgil, S., & Gunasekaran, A. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1598599 · Cited by 273
Six Sigma quality: a structured review and implications for future research
Gamal Aboelmaged, M. (2010) · International Journal of Quality & Reliability Management · doi:10.1108/02656711011023294 · Cited by 259
Metadata
- Authors
- Antony, J., Kumar, M., & Labib, A.
- Venue
- Journal of the Operational Research Society
- Publisher
- Informa UK Limited
- Published
- 2008-04
- Volume
- 59
- Issue
- 4
- Pages
- 482-493
- ISSN
- 0160-5682 (ISSN-L)
- 1476-9360
- OpenAlex
- W1985299250
- Cited by
- 166
- References
- 24
- FWCI
- 6.15
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.