Shielding Production: Essential Step in Production Control
The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Abstract
Effective production control systems are structured around the assignment as the unit of analysis. The quality of work assignments in production units such as construction crews and engineering squads is the key to production control and for determining production unit productivity. Research has revealed that the quality of assignments can be substantially improved by forming and selecting them to meet soundness, sequence, and size criteria. Quality assignments shield production units from work flow uncertainty, enabling those units to improve their own productivity, and also improve the productivity of the production units downstream. The associated reduction in task duration can shorten projects. Further reduction of project duration comes from shortening the buffers previously needed to accommodate flow uncertainty.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Application of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Construction Project Management
(2004) · Structural Survey · doi:10.1108/ss.2004.11022bae.009 · Cited by 340
Implementing Lean Construction: Stabilizing Work Flow
Ballard, G., & Howell, G. A. (1997) · Cited by 268
Self-citationProduction control: A structural and design oriented approach
(1991) · European Journal of Operational Research · doi:10.1016/0377-2217(91)90056-2 · Cited by 252
Cited by
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Ballard, G., & Howell, G. (2003) · Building Research & Information · doi:10.1080/09613210301997 · Cited by 364
Self-citationSystems Model of Construction Accident Causation
Mitropoulos, P., Abdelhamid, T. S., & Howell, G. A. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:7(816 · Cited by 336
Self-citationOpportunities for enhanced lean construction management using Internet of Things standards
Dave, B., Kubler, S., Främling, K., & Koskela, L. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.10.009 · Cited by 292
Lean Processes for Sustainable Project Delivery
Lapinski, A. R., Horman, M. J., & Riley, D. R. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:10(1083 · Cited by 268
A seamless supply chain management model for construction
Love, P. E. D., Irani, Z., & Edwards, D. J. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410517575 · Cited by 249
Supply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223
Bortolini, R., Formoso, C. T., & Viana, D. D. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.031 · Cited by 211
BIM-based Last Planner System tool for improving construction project management
Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.019 · Cited by 201
Lean Methodologies and Techniques for Modular Construction: Chronological and Critical Review
Innella, F., Arashpour, M., & Bai, Y. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001712 · Cited by 180
Lost in transition: the transfer of lean manufacturing to construction
Jørgensen, B., & Emmitt, S. (2008) · Engineering, Construction and Architectural Management · doi:10.1108/09699980810886874 · Cited by 169
“Approaches and methods for addressing waste through reduction of variability and uncertainty, especially via the last planner system of production control (LPS), have been widely promoted and discussed (e.g. Ballard, 1993; 2000; Ballard and Howell, 1998; 2003b).”
MethodLean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“…parameters, a slow take-up of change and fragmented supply chains (Behera, Mohanty, and Prakash 2015), which produce challenges before the diffusion of lean thinking in the industry (Ballard and Howell 1998; Thomas et al. 2002; Johansen and Walter 2007; Viana, Formoso, and Isatto 2017).”
Background
Metadata
- Authors
- Ballard, G., & Howell, G.
- Venue
- Journal of Construction Engineering and Management
- Published
- 1998-01
- Volume
- 124
- Issue
- 1
- Pages
- 11-17
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(1998)124:1(11
- OpenAlex
- W2169406915
- Cited by
- 510
- References
- 4
- FWCI
- 21.51
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.